Toronto address · Ward 14, Toronto-Danforth
25 Sparkhall Ave
The City of Toronto has 6 building permits since 2017 and 2 Committee of Adjustment files on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Garage
Proposal to legalize existing garage structure without roof and swim spa built on existing deck.
Applied Jul 11, 2022 · issued Jan 11, 2024 · completed May 24, 2024 · Permit 22 174617 BLD
- Closed
Plumbing
Plumbing - Interior alterations to all floors w/ basement underpinning
Applied Apr 3, 2017 · issued Apr 3, 2017 · completed Mar 6, 2019 · Permit 16 254629 PLB
- Closed
Plumbing
Plumbing - Proposal for multiple projects to an existing 3 storey SFD-semi dwelling. Scope of work includes a ground floor rear addition, 2nd floor rear addition, interior alterations, rear basement walkout, rear 2nd floor balcony and a rear 3rd floor balcony.
Applied Mar 26, 2017 · issued Aug 9, 2017 · completed Mar 6, 2019 · Permit 17 103196 PLB
- Closed
Small residential project · Multiple projects
Proposal for multiple projects to an existing 3 storey SFD-semi dwelling. Scope of work includes a ground floor rear addition, 2nd floor rear addition, interior alterations, front basement walkout, rear 2nd floor balcony and a rear 3rd floor balcony.
Applied Jan 11, 2017 · issued Aug 9, 2017 · completed Mar 6, 2019 · Permit 17 103196 BLD
- Closed
Small residential project · Multiple projects
Interior alterations to all floors w/ basement underpinning
Applied Nov 22, 2016 · issued Dec 1, 2016 · completed Mar 6, 2019 · Permit 16 254629 BLD
- Closed
Drains and site services
Drain - Interior alterations to all floors w/ basement underpinning
Applied Nov 22, 2016 · issued Dec 1, 2016 · completed Mar 6, 2019 · Permit 16 254629 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Approved with conditions
Minor variance · Other
To permit ancillary structures (a raised deck and stairs, a new fence with support braces and a roll-up laneway door (for the existing parking space)). Also, to construct a new ancillary structure (shed) and to maintain the existing shed and swim-spa that were constructed without an authorized building permit.
Decision: Approved (hearing Dec 13, 2023)
Filed Dec 7, 2022 · File A1369/22TEY
- Closed
Minor variance · R addition
To alter the existing two-storey semi-detached dwelling by constructing a rear second-storey addition with deck above, rear one-storey addition and rear basement walk-out.
Decision: Approved (hearing Jul 12, 2017)
Filed Mar 3, 2017 · File A0258/17TEY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
623 Broadview Ave · Minor variance
To construct a new two-storey detached ancillary building (containing one garden suite with a south side porch and second storey deck), in the rear yard, abutting Tennis Crescent. The second storey of the ancillary building will be cantilevered on the east and west sides. The existing rear one-storey detached garage will be demolished. There will be a total of three residential dwelling units on this lot (two units within the main dwelling and one unit within the ancillary building).
220 m away · filed Oct 6, 2025 · Deferred
31 Millbrook Cres · Minor variance
To construct a new one-storey detached ancillary structure (carport with two vehicular parking spaces) in the rear yard, abutting the laneway.
80 m away · filed Oct 3, 2025 · Approved
547 Broadview Ave · Minor variance
To alter the existing three-storey semi-detached dwelling (duplex) by constructing a rear ground floor deck, and a second storey deck. There are a total of two residential dwelling units on this lot.
110 m away · filed Jun 14, 2024 · Approved
15 Bain Ave · Minor variance
To alter the existing one-and-one-half-storey detached dwelling by constructing a two-storey rear addition (with basement), a third floor addition, and a third floor rear rooftop (covered) deck. Also, to construct a new roof over the existing front porch, a rear ground floor deck and stairs, as well as a new rear basement walkout. Also, the existing ancillary building (garage) in the rear yard will be maintained and unaltered and the existing shed will be demolished.
110 m away · filed Jun 6, 2023 · Approved
483 Broadview Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear one-storey addition with a basement.
250 m away · filed Mar 22, 2023 · Approved
26 Bain Ave · Minor variance
To alter the exisitng two-and-one-half-storey detached dwelling by reconstructing the front porch.
70 m away · filed Nov 10, 2022 · Approved
37 Withrow Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear three-storey addition, a rear ground floor deck, a second storey front addition, and to convert the front vestibule into a front porch.
240 m away · filed Sep 20, 2022 · Approved
537 Broadview Ave · Minor variance
To alter the existing two-and-one-half-storey residential apartment building (currently containing 5 dwelling units and 7 dwelling rooms) by demolishing the existing addition and constructing four-storey rear and side additions with front third and fourth storey terraces, rear fourth storey terrace and Juliette balconies along all elevations, for a total of 15 dwelling units.
100 m away · filed Jul 6, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.