Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 11, University-Rosedale

250 Davenport Rd

The City of Toronto has 62 building permits since 2017 (12 still open) and 3 Committee of Adjustment files on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Balcony/Guard repairs

    Proposed balcony concrete structure repairs and balcony railing replacement.

    Applied Jul 21, 2026 · Permit 26 206101 BLD

    Under review
  • Addition or alteration · Fire damage

    Proposal for replacement of fire damaged balcony railing and Eifs at unit 1508

    Applied May 6, 2026 · issued May 14, 2026 · completed Aug 20, 2026 · Permit 26 155887 BLD

    Closed
  • Addition or alteration · Interior alterations

    Convert portion of existing lobby into a temporary mail area

    Applied Oct 2, 2023 · issued Oct 5, 2023 · completed Mar 6, 2024 · Permit 23 209751 BLD

    Closed
  • Fire and security upgrade · Electromagnetic locks

    To add two maglocks to existing doors in basement of existing building

    Applied Sep 28, 2021 · completed May 30, 2022 · Permit 21 218566 FSU

    Cancelled
  • Heating and ventilation · Alter: Boiler/Furnace/AC replacement

    ¿ Replace existing boiler and associated pumps and vent piping- Add new pumps for redundancy - Rework existing heating pipes to suit new layout

    Applied Jul 19, 2021 · issued Aug 19, 2021 · Permit 21 186488 MSA

    Permit issued
  • Plumbing · Backflow prevention devices (Water only)

    Replace existing boiler and associated pumps and vent piping- Add new pumps for redundancy - Rework existing heating pipes to suit new layoutThe work related to permit # 21 186488 MSA 00 MS

    Applied Jul 19, 2021 · issued Aug 19, 2021 · Permit 21 186497 PSA

    Permit issued
  • Plumbing

    Plumbing - PROPOSED: Basement Level: Existing unused locker room will be converted into the COTA Agency office space w/ washroom and kitchenette.Ground Floor Level: Existing superintendent office will be converted into the COTA Agency amenity space with universal washroom and kitchenette.Two existing units will be converted into the superintendent office space w/ washroom and kitchenette.

    Applied May 28, 2021 · issued Jun 25, 2021 · Permit 21 161974 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    PROPOSED: Basement Level: Existing unused locker room will be converted into the COTA Agency office space w/ washroom and kitchenette.Ground Floor Level: Existing superintendent office will be converted into the COTA Agency amenity space with universal washroom and kitchenette.Two existing units will be converted into the superintendent office space w/ washroom and kitchenette.

    Applied May 28, 2021 · issued Jun 25, 2021 · Permit 21 161974 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - PROPOSED: Basement Level: Existing unused locker room will be converted into the COTA Agency office space w/ washroom and kitchenette.Ground Floor Level: Existing superintendent office will be converted into the COTA Agency amenity space with universal washroom and kitchenette.Two existing units will be converted into the superintendent office space w/ washroom and kitchenette.

    Applied May 28, 2021 · issued Jun 25, 2021 · Permit 21 161974 HVA

    Inspections under way
  • Heating and ventilation

    Revision 01 - changes to mechanical as per the inspectorHVAC - BUILDING D - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 4 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings). SEE LEAD FILE 17 278193 BLD FOR ALL DRAWINGS AND DOCUMENTS.

    Applied Feb 24, 2021 · issued May 13, 2021 · completed Jun 16, 2022 · Permit 17 278236 HVA (revision 01)

    Closed
  • Heating and ventilation

    Revision 01 - changes to mechanical as per the inspectorHVAC - BUILDING A1 - 250 DAVENPORT RD - Proposal to construct a 3 storey partially stacked townhouse complex with 8 units. See also 16-271502 SA.

    Applied Feb 24, 2021 · issued Mar 16, 2021 · completed Jun 16, 2022 · Permit 19 146341 HVA (revision 01)

    Closed
  • Heating and ventilation

    Revision 01 - mechanical changes as per inspectorHVAC - BUILDING A2 - 250 DAVENPORT RD - Proposal to construct a 2 storey partially stacked townhouse complex with 5 units. See also 16-271518 SA.

    Applied Feb 24, 2021 · issued Mar 22, 2021 · completed Jun 16, 2022 · Permit 19 146349 HVA (revision 01)

    Closed
Show 50 more permits
  • Heating and ventilation

    Revision 01 - changes to mechanical as per the inspectorHVAC - LEAD FILE - BUILDING A - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 8 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings).

    Applied Feb 24, 2021 · issued May 13, 2021 · completed Jun 16, 2022 · Permit 17 278193 HVA (revision 01)

    Closed
  • Heating and ventilation

    Revision 01 - changes to mechanical as per the inspectorHVAC - BUILDING B - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 8 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings). SEE LEAD FILE 17 278193 BLD FOR ALL DRAWINGS AND DOCUMENTS.

    Applied Feb 24, 2021 · issued May 13, 2021 · completed Jun 16, 2022 · Permit 17 278214 HVA (revision 01)

    Closed
  • Heating and ventilation

    Revision 01 - changes to mechanical as per the inspectorHVAC - BUILDING C - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 7 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings). SEE LEAD FILE 17 278193 BLD FOR ALL DRAWINGS AND DOCUMENTS.

    Applied Feb 24, 2021 · issued May 13, 2021 · completed Jun 16, 2022 · Permit 17 278218 HVA (revision 01)

    Closed
  • Heating and ventilation

    Revision 01 - changes to mechanical as per the inspectorHVAC - BUILDING E - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 4 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings). SEE LEAD FILE 17 278193 BLD FOR ALL DRAWINGS AND DOCUMENTS.

    Applied Feb 24, 2021 · issued May 13, 2021 · completed Jun 16, 2022 · Permit 17 278244 HVA (revision 01)

    Closed
  • Heating and ventilation

    Revision 01 - changes to mechanical as per the inspectorHVAC - BUILDING F - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 8 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings). SEE LEAD FILE 17 278193 BLD FOR ALL DRAWINGS AND DOCUMENTS.

    Applied Feb 24, 2021 · issued May 13, 2021 · completed Jun 16, 2022 · Permit 17 278254 HVA (revision 01)

    Closed
  • Drains and site services · Inside and outside drains

    Drain - BUILDING A1 - 250 DAVENPORT RD - Proposal to construct a 3 storey partially stacked townhouse complex with 8 units. See also 16-271502 SA.

    Applied Jul 3, 2019 · issued Nov 4, 2019 · completed Jun 16, 2022 · Permit 19 146341 STS

    Closed
  • Drains and site services · Site service

    Proposal to construct new domestic water line, 1 man hole, and 1 back flow prevention device in future public park.

    Applied Jun 7, 2019 · issued Jul 18, 2019 · completed Dec 4, 2019 · Permit 19 167410 STS

    Closed
  • Heating and ventilation

    HVAC - BUILDING A1 - 250 DAVENPORT RD - Proposal to construct a 3 storey partially stacked townhouse complex with 8 units. See also 16-271502 SA.

    Applied Jun 5, 2019 · issued Feb 18, 2020 · completed Jun 16, 2022 · Permit 19 146341 HVA

    Closed
  • Plumbing

    Plumbing - BUILDING A2 - 250 DAVENPORT RD - Proposal to construct a 2 storey partially stacked townhouse complex with 5 units. See also 16-271518 SA.

    Applied Jun 5, 2019 · issued Feb 26, 2020 · completed Jun 16, 2022 · Permit 19 146349 PLB

    Closed
  • Plumbing

    Plumbing - BUILDING A1 - 250 DAVENPORT RD - Proposal to construct a 3 storey partially stacked townhouse complex with 8 units. See also 16-271502 SA.

    Applied Jun 5, 2019 · issued Feb 18, 2020 · completed Jun 16, 2022 · Permit 19 146341 PLB

    Closed
  • Heating and ventilation

    HVAC - BUILDING A2 - 250 DAVENPORT RD - Proposal to construct a 2 storey partially stacked townhouse complex with 5 units. See also 16-271518 SA.

    Applied Jun 5, 2019 · issued Feb 26, 2020 · completed Jun 16, 2022 · Permit 19 146349 HVA

    Closed
  • New building

    BUILDING A1 - 250 DAVENPORT RD - Proposal to construct a 3 storey partially stacked townhouse complex with 8 units. See also 16-271502 SA.

    Applied Apr 29, 2019 · issued Oct 30, 2019 · completed Aug 8, 2022 · 8 homes added · Permit 19 146341 BLD

    Closed
  • New building

    BUILDING A2 - 250 DAVENPORT RD - Proposal to construct a 2 storey partially stacked townhouse complex with 5 units. See also 16-271518 SA.

    Applied Apr 29, 2019 · issued Oct 30, 2019 · completed Aug 8, 2022 · 5 homes added · Permit 19 146349 BLD

    Closed
  • Conditional permit · Partial permit - structural framing

    Conditional Permit - Part Permit - BUILDING D - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 8 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings). SEE LEAD FILE 17 278193 BLD FOR ALL DRAWINGS AND DOCUMENTS.

    Applied Oct 1, 2018 · issued Nov 2, 2018 · completed Feb 27, 2020 · Permit 17 278236 STR

    Closed
  • Partial permit · Partial permit - structural framing

    Part Permit - BUILDING B - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 8 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings). SEE LEAD FILE 17 278193 BLD FOR ALL DRAWINGS AND DOCUMENTS.

    Applied Oct 1, 2018 · issued Feb 27, 2020 · completed Sep 23, 2020 · Permit 17 278214 STR

    Closed
  • Partial permit · Partial permit - structural framing

    Part Permit - BUILDING F - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 7 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings). SEE LEAD FILE 17 278193 BLD FOR ALL DRAWINGS AND DOCUMENTS.

    Applied Oct 1, 2018 · issued Feb 28, 2020 · completed Mar 6, 2020 · Permit 17 278254 STR

    Closed
  • Conditional permit · Partial permit - structural framing

    Conditional Permit - Part Permit - BUILDING C - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 8 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings). SEE LEAD FILE 17 278193 BLD FOR ALL DRAWINGS AND DOCUMENTS.

    Applied Oct 1, 2018 · issued Nov 2, 2018 · completed Feb 27, 2020 · Permit 17 278218 STR

    Closed
  • Conditional permit · Partial permit - structural framing

    Conditional Permit - Part Permit - BUILDING E - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 8 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings). SEE LEAD FILE 17 278193 BLD FOR ALL DRAWINGS AND DOCUMENTS.

    Applied Oct 1, 2018 · issued Nov 2, 2018 · completed Feb 27, 2020 · Permit 17 278244 STR

    Closed
  • Fire and security upgrade · Fire alarm

    Proposal to upgrade the fire alarm system in an existing 26 storey apartment building with a penthouse level and 3 levels of underground parking.

    Applied Aug 31, 2018 · issued Sep 21, 2018 · completed Dec 5, 2019 · Permit 18 218648 FSU

    Closed
  • Fire and security upgrade · Electromagnetic locks

    To install maglock at the apartment building.

    Applied Jul 26, 2018 · issued Aug 10, 2018 · completed Oct 23, 2019 · Permit 18 200056 FSU

    Closed
  • Plumbing

    Plumbing - BUILDING F - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 8 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings). SEE LEAD FILE 17 278193 BLD FOR ALL DRAWINGS AND DOCUMENTS.

    Applied Feb 13, 2018 · issued Feb 28, 2020 · completed Jun 16, 2022 · Permit 17 278254 PLB

    Closed
  • Alternative solution

    Alternative solution to discuss connected building smoke control requirements governed by OBC Article 3.2.6.3. and Measure N of Supplementary Standard SB-4 Measures for Fire Safety in High Buildings

    Applied Feb 13, 2018 · completed Dec 20, 2018 · Permit 18 116848 ALT

    Approved
  • Plumbing

    Plumbing - LEAD FILE - BUILDING A - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 8 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings).

    Applied Feb 13, 2018 · issued Mar 3, 2020 · completed Jun 16, 2022 · Permit 17 278193 PLB

    Closed
  • Plumbing

    Plumbing - BUILDING B - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 8 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings). SEE LEAD FILE 17 278193 BLD FOR ALL DRAWINGS AND DOCUMENTS.

    Applied Feb 13, 2018 · issued Feb 28, 2020 · completed Jun 16, 2022 · Permit 17 278214 PLB

    Closed
  • Plumbing

    Plumbing - BUILDING C - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 7 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings). SEE LEAD FILE 17 278193 BLD FOR ALL DRAWINGS AND DOCUMENTS.

    Applied Feb 13, 2018 · issued Feb 28, 2020 · completed Jun 16, 2022 · Permit 17 278218 PLB

    Closed
  • Plumbing

    Plumbing - BUILDING D - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 4 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings). SEE LEAD FILE 17 278193 BLD FOR ALL DRAWINGS AND DOCUMENTS.

    Applied Feb 13, 2018 · issued Feb 28, 2020 · completed Jun 16, 2022 · Permit 17 278236 PLB

    Closed
  • Plumbing

    Plumbing - BUILDING E - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 4 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings). SEE LEAD FILE 17 278193 BLD FOR ALL DRAWINGS AND DOCUMENTS.

    Applied Feb 13, 2018 · issued Feb 28, 2020 · completed Jun 16, 2022 · Permit 17 278244 PLB

    Closed
  • New building

    BUILDING D - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 8 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings). SEE LEAD FILE 17 278193 BLD FOR ALL DRAWINGS AND DOCUMENTS.

    Applied Dec 21, 2017 · issued Mar 6, 2020 · completed Jun 16, 2022 · 8 homes added · Permit 17 278236 BLD

    Closed
  • New building

    BUILDING E - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 8 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings). SEE LEAD FILE 17 278193 BLD FOR ALL DRAWINGS AND DOCUMENTS.

    Applied Dec 21, 2017 · issued Mar 6, 2020 · completed Jun 16, 2022 · 8 homes added · Permit 17 278244 BLD

    Closed
  • New building

    BUILDING F - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 7 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings). SEE LEAD FILE 17 278193 BLD FOR ALL DRAWINGS AND DOCUMENTS.

    Applied Dec 21, 2017 · issued Mar 6, 2020 · completed Jun 16, 2022 · 7 homes added · Permit 17 278254 BLD

    Closed
  • Heating and ventilation

    HVAC - BUILDING F - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 8 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings). SEE LEAD FILE 17 278193 BLD FOR ALL DRAWINGS AND DOCUMENTS.

    Applied Dec 21, 2017 · issued Feb 28, 2020 · completed Jun 16, 2022 · Permit 17 278254 HVA

    Closed
  • Heating and ventilation

    HVAC - BUILDING D - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 4 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings). SEE LEAD FILE 17 278193 BLD FOR ALL DRAWINGS AND DOCUMENTS.

    Applied Dec 21, 2017 · issued Feb 28, 2020 · completed Jun 16, 2022 · Permit 17 278236 HVA

    Closed
  • Heating and ventilation

    HVAC - BUILDING E - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 4 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings). SEE LEAD FILE 17 278193 BLD FOR ALL DRAWINGS AND DOCUMENTS.

    Applied Dec 21, 2017 · issued Feb 28, 2020 · completed Jun 16, 2022 · Permit 17 278244 HVA

    Closed
  • Heating and ventilation

    HVAC - BUILDING C - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 7 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings). SEE LEAD FILE 17 278193 BLD FOR ALL DRAWINGS AND DOCUMENTS.

    Applied Dec 21, 2017 · issued Feb 28, 2020 · completed Jun 16, 2022 · Permit 17 278218 HVA

    Closed
  • Heating and ventilation

    HVAC - BUILDING B - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 8 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings). SEE LEAD FILE 17 278193 BLD FOR ALL DRAWINGS AND DOCUMENTS.

    Applied Dec 21, 2017 · issued Feb 28, 2020 · completed Jun 16, 2022 · Permit 17 278214 HVA

    Closed
  • Heating and ventilation

    HVAC - LEAD FILE - BUILDING A - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 8 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings).

    Applied Dec 21, 2017 · issued Mar 13, 2020 · completed Jun 16, 2022 · Permit 17 278193 HVA

    Closed
  • New building

    BUILDING B - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 8 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings). SEE LEAD FILE 17 278193 BLD FOR ALL DRAWINGS AND DOCUMENTS.

    Applied Dec 21, 2017 · issued Sep 23, 2020 · completed Jun 16, 2022 · 8 homes added · Permit 17 278214 BLD

    Closed
  • New building

    BUILDING C - 181 BEDFORD RD - Proposal to construct a 3 storey residential multi-townhouse building with 8 units. Note: See 17 220118 BLD for main tower & below grade parking and additonal townhouse buildings). SEE LEAD FILE 17 278193 BLD FOR ALL DRAWINGS AND DOCUMENTS.

    Applied Dec 21, 2017 · issued Mar 10, 2020 · completed Jun 16, 2022 · 8 homes added · Permit 17 278218 BLD

    Closed
  • Alternative solution

    It is proposed to provide 65 mm standpipe system hose valve connections in general conformance with the 2015 National Building Code (NBC) and the 2013 Edition of NFPA 14, `Standard for Installation of Standpipe and Hose System¿ (as referenced by the NBC) in this fully sprinklered building. The 65 mm hose connections will be provided in lieu of hose stations (38 mm and 65 mm hose valves, 38 mm hoseand nozzle) required by the 2012 Ontario Building Code. The standpipe system and hose connections will be located within exit stair enclosures.

    Applied Aug 21, 2017 · completed May 7, 2020 · Permit 17 220198 ALT

    Approved
  • Addition or alteration · Interior alterations

    Proposal for interior alteration on B1 level (southeast corner of parking area) for new electrical vault room and electrical distribution room .

    Applied Aug 5, 2017 · issued Jan 15, 2018 · Permit 17 211909 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for interior alteration on B1 level (southeast corner of parking area) for new electrical vault (refer to 15-181720 for interior alterations)

    Applied Aug 5, 2017 · issued Jan 18, 2018 · completed Feb 10, 2023 · Permit 17 211909 HVA

    Closed
  • Demolition

    Proposal to demolish westerly portion of existing garage located on the lands formerly known as 250 Davenport Road to make way for future build out in related NB permit for new tower in 17-202188 NB (to be known as 181 Bedford Road. Also refer to related RH folder for demolition of existing TCH dwellings 15 192164.

    Applied Jul 20, 2017 · issued Apr 17, 2018 · 8 homes removed · Permit 17 202221 DEM

    Inspections under way
  • Addition or alteration · Multiple projects

    Proposal for shoring in conjunction to demo permit 17-202221 - also see BLD permit 17-121980

    Applied Jul 20, 2017 · completed Mar 29, 2018 · Permit 17 202188 BLD

    Cancelled
  • Drains and site services

    Drain - Proposal for underground parking garage repairs to an existing apartment building. Proposal includes new garage and entrance ramp within the building.

    Applied Feb 27, 2017 · issued Aug 24, 2017 · completed Feb 7, 2020 · Permit 17 121980 DRN

    Closed
  • Addition or alteration · Garage Repair/Reconstruction

    Proposal for underground parking garage repairs to an existing apartment building. Demo eleven (11) townhome units. Proposal includes new garage and entrance ramp within the building. Toronto Community Housing Corporation. (East and west portions of lot to be severed at future date. Refer to By-law 1284-2016).

    Applied Feb 27, 2017 · issued Jan 10, 2020 · completed Oct 8, 2020 · Permit 17 121980 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for multiple projects to an existing apartment building. Scope of work includes reroofing, recladding, interior alterations including elevator retrofit, mechanical retrofit and new plumbing stacks.

    Applied Jun 26, 2015 · issued Aug 25, 2015 · completed Jul 4, 2018 · Permit 15 181720 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for multiple projects to an existing apartment building. Scope of work includes reroofing, recladding, interior alterations including elevator retrofit, mechanical retrofit and new plumbing stacks.

    Applied Jun 26, 2015 · issued Aug 25, 2015 · completed Jun 22, 2018 · Permit 15 181720 PLB

    Closed
  • Addition or alteration · Multiple projects

    Proposal for multiple projects to an existing apartment building. Scope of work includes reroofing, recladding, interior alterations including elevator retrofit, mechanical retrofit and new plumbing stacks.

    Applied Jun 26, 2015 · issued Aug 25, 2015 · completed Feb 15, 2024 · Permit 15 181720 BLD

    Closed
  • Addition or alteration · Other

    Make structural reinforcements for rooftop telecommunications equipment. (Install Bell Mobility equipment shelter and antenna supports on roof of building).

    Applied Jul 9, 2007 · issued Jul 31, 2007 · Permit 07 241118 BLD

    Inspections under way
  • Fire and security upgrade · Fire alarm

    replace fire alarm (excluding fire alarm panel), upgrade fire alarm audability and install new voice communication system

    Applied Sep 10, 2002 · issued Oct 4, 2002 · Permit 02 171298 FSU

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    Filed Aug 20, 2026 · File A0644/26TEY

    Postponed
  • Consent · Lot addition

    To obtain consent to sever a portion of land (a below grade strata) for the purpose of a lot addition and to create an easement.

    Decision: Approved (hearing Apr 3, 2019)

    Filed Feb 14, 2019 · File B0009/19TEY

    Closed
  • Consent · Sever lot

    To obtain consent to sever the property into two lots and to create various easements/rights-of-way.

    Decision: Approved (hearing Jan 31, 2017)

    Filed Dec 1, 2016 · 1 new lot · File B0083/16TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 32 Tranby Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition (enclose a portion of the existing rear third storey rooftop deck into habitable space).

    180 m away · filed Jun 2, 2026 · Approved

  • 17 Bernard Ave · Minor variance

    To alter the existing rear one-storey detached ancillary building (one-car garage), by constructing a one-storey addition in front of the existing garage. Thise altered ancillary building will contain two tandem parking spaces.

    160 m away · filed Mar 5, 2026 · Approved

  • 180 Davenport Rd · Minor variance

    To alter the existing buildings (municipally known as 178A and 180 Davenport Road, under the same ownership) by constructing a two-storey middle addition that will connect the two buildings internally. Also, to construct a rear third storey addition with a rear terrace, a mechanical penthouse, rooftop access enclosure and a covered rooftop terrace. This building will contain one commercial unit (occupying the basement, ground and second storeys) and one residential dwelling unit (occupying the third storey).

    240 m away · filed Jan 29, 2026 · Approved

  • 21 Dupont St · Minor variance

    To permit and to maintain the existing conversion of the rear two-car integral garage of the existing two-and-one-half-storey semi-detached dwelling into a one-car garage with a separate habitable space (kitchen extension). Also, to permit and to maintain the existing rear ground floor covered (awning) deck with stairs and the rear ancillary building (shed). Also, to reconstruct the existing rear second storey roof deck above the garage and the existing third storey roof deck.

    220 m away · filed Dec 3, 2025 · Approved

  • 20 Tranby Ave · Minor variance

    To alter the existing three-storey detached dwelling by constructing a new roof for the existing rear one-storey addition, extending the rear second storey roof, and interior alterations. Also, to permit and maintain the existing one-storey front addition with a front porch with stairs and bay window.

    190 m away · filed Nov 25, 2025 · Approved

  • 249 Bedford Rd · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a rear third floor balcony.

    230 m away · filed Oct 1, 2025 · Approved

  • 247 Bedford Rd · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a rear third floor balcony.

    220 m away · filed Oct 1, 2025 · Approved

  • 287 Davenport Rd · Minor variance

    To alter the development standards for a 13-storey mixed-use building (as approved under Site Specific Zoning By-law 314-2023), by increasing the total non-residential gross floor area on the lot. A Site Plan Control application (File Number 21 248545 STE 11 SA) is currently under review.

    120 m away · filed Aug 28, 2025 · Approved

Everything planned in University-Rosedale

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.