Toronto address · Ward 8, Eglinton-Lawrence
2516 Yonge St
The City of Toronto has 4 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Designated structure · Sign building permit related
In conjunction with a two storey building on the premises, proposal to erect and display one illuminated wall sign displaying static copy, located on the first storey of the east elevation. The proposed sign is 0.94 metres vertically by 4.88 metres horizontally at a height of 3.73 metres above grade.*****PURE + SIMPLE******* BEAUTY FROM HEALTH
Applied Jul 4, 2018 · issued Jul 12, 2018 · completed Aug 10, 2018 · Permit 18 188330 DST
- Closed
Heating and ventilation
HVAC - Interior alterations to ground and second floors to convert from bank/office to retail/beauty centre.
Applied Apr 25, 2018 · issued Jun 7, 2018 · completed Jul 25, 2018 · Permit 18 144564 HVA
- Closed
Addition or alteration · Interior alterations
Interior alterations to ground and second floors to convert from bank/office to retail/beauty centre.
Applied Apr 16, 2018 · issued Jun 7, 2018 · completed Jul 25, 2018 · Permit 18 144564 BLD
- Closed
Plumbing
Plumbing - Interior alterations to ground and second floors to convert from bank/office to retail/beauty centre.
Applied Apr 16, 2018 · issued Jun 7, 2018 · completed Jul 25, 2018 · Permit 18 144564 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
2490-2514 Yonge Street, 10-20 Castlefield Avenue and 567 Duplex Avenue
15 storeys · 161 homes · Mixed use
30 m away · Condominium · Approved · filed May 14, 2025
- Under review
40 storeys · 524 homes · Residential
300 m away · Rezoning · Under review · filed Dec 24, 2025
- Under review
39 storeys · 412 homes · Mixed use
320 m away · Site plan · Under review · filed Apr 8, 2022
- Under review
35 storeys · 377 homes · Residential
320 m away · Site plan · Under review · filed Sep 19, 2022
- Under review
24 storeys · 306 homes · Mixed use
350 m away · Site plan · Under review · filed Jun 30, 2022
- Approved
Neighbours’ Committee of Adjustment files within 250 m
2561 Yonge St · Minor variance
To alter the existing building by adding a rear second storey addition.
150 m away · filed Sep 4, 2025 · Approved
49 Roselawn Ave · Minor variance
To permit an office use at the existing dwelling, with a second storey east to west addition linking to 47 Roselawn Avenue.
240 m away · filed Jul 31, 2024 · Approved
47 Roselawn Ave · Minor variance
To permit an office use at the existing dwelling, with a second storey east to west addition linking to 49 Roselawn Avenue.
240 m away · filed Jul 31, 2024 · Approved
2551 Yonge St · Minor variance
To construct 1 storey slab on grade rear addition to an existing ground floor retail unit
110 m away · filed May 30, 2024 · Approved
2400 Yonge St · Minor variance
To alter the developments standards, as approved by Site Specific Zoning By-law 1207-2022, including changes to the tower heights, gross floor area, and parking space lengths. The southern tower will increase from 101.2 metres to 110.1 metres and the north tower will increase 83.2 metres to 92.1 metres.
250 m away · filed Feb 8, 2024 · Approved
101 Briar Hill Ave · Minor variance
To construct a new detached dwelling with rear deck and basement walkout.
240 m away · filed Oct 27, 2023 · Approved
87 St Clements Ave · Minor variance
Proposal to construct a new dwelling.
210 m away · filed Jun 19, 2023 · Approved
14 St Clements Ave · Minor variance
Proposal to alter existing two storey daycare with a one storey addition on the north side, enclosed vestibule on the south side and two outdoor platforms, on the north and south side of the building.
70 m away · filed Apr 4, 2023 · conditional approval
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.