Toronto address · Ward 4, Parkdale-High Park
255 Evelyn Ave
The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Designed a three-zone residential HVAC system with independent temperature control for each floor using an iFlow air handler and iFlow heat pump. Basement heating is provided by a hydronic in-floor radiant heating system. The house is undergoing minor renovations, and HVAC modifications were coordinated to accommodate the updated layout and ensure code compliance.Proposed new rear walkout with covered roof, basement underpinning and interior alterations.
Applied May 22, 2026 · issued Aug 12, 2026 · Permit 25 251297 HVA
- Inspections under way
Plumbing
Plumbing - Proposed new rear walkout with covered roof, basement underpinning and interior alterations.
Applied Feb 17, 2026 · issued Feb 17, 2026 · Permit 25 251297 PLB
- Inspections under way
Drains and site services
Drain - Proposed new rear walkout with covered roof, basement underpinning and interior alterations.
Applied Feb 17, 2026 · issued Feb 17, 2026 · Permit 25 251297 DRN
- Inspections under way
Small residential project · Multiple projects
Proposed new rear walkout with covered roof, basement underpinning and interior alterations.
Applied Nov 7, 2025 · issued Nov 28, 2025 · Permit 25 251297 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
9 storeys · 87 homes · Mixed use
320 m away · Site plan · Approved · filed Apr 7, 2021
- Approved
11 storeys · 128 homes · Mixed use
340 m away · Site plan · Approved · filed Dec 29, 2021
- Approved
70 homes · Residential
490 m away · Condominium · Approved · filed Mar 1, 2023
Neighbours’ Committee of Adjustment files within 250 m
48 Laws St · Consent
To obtain consent to sever a portion of the land for the purpose of a lot addition and to maintain existing easements/rights-of-way.
110 m away · filed Jun 4, 2026 · Approved
15 Laws St · Consent
To obtain consent to create a new easement/right-of-way.
130 m away · filed Jan 29, 2026 · Application withdrawn
107 St John's Rd · Minor variance
To construct a new rear detached ancillary building (containing one parking space and an attached storage room with separate access) abutting Lane South Saint Johns East Fairview, in the rear yard of the existing two-and-one-half-storey semi-detached dwelling. The existing rear garage will be demolished.
220 m away · filed Aug 26, 2025 · Approved
237 Evelyn Ave · Minor variance
To construct a new one-storey detached ancillary building (two-car garage with a washroom), in the rear yard. The existing ancillary building (garage and shed), at the north limits of the site, will be demolished.
70 m away · filed May 22, 2025 · Approved
239 Evelyn Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing rear additions to the first, second, and third levels with a rear ground floor deck. The ancillary building (attached garage to the abutting garage at 237 Evelyn Avenue) in the rear yard, will be maintained and unaltered.
60 m away · filed Apr 29, 2024 · Approved
153 Fairview Ave · Minor variance
To construct a new one-storey ancillary building (for habitable and storage space), in the rear yard. The existing ancillary building (detached garage) will be demolished.
140 m away · filed Dec 11, 2023 · Approved
424 Clendenan Ave · Minor variance
To alter the existing two-storey detached dwelling by permitting the enlarged rear pergola.
220 m away · filed Mar 9, 2023 · Approved
81 St John's Rd · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a three- storey rear addition, rear first, second and third storey decks, a new side (east) open porch, and a new third storey dormer. Also, to construct a new secondary suite within the basement with a new rear walkout and patio. There will be a total of four units within this dwelling.
200 m away · filed Feb 1, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.