Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

2550 Bathurst St

The City of Toronto has 5 building permits since 2017 (5 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing · Other

    Proposed Kitec pipe replacement of risers and in-suite domestic water piping in 63 units. Exludes units 410 and 118.

    Applied Jul 31, 2020 · issued Sep 14, 2020 · Permit 20 175107 PSA

    Inspections under way
  • Addition or alteration · Other

    Proposal of Re-construction of the existing South side exterior stairs of an existing apartment building.

    Applied Sep 24, 2014 · issued Mar 5, 2015 · Permit 14 227272 BLD

    Permit issued
  • Addition or alteration · Other

    Installation of new door between garbage and storage room on basement floor.

    Applied Jun 10, 2014 · issued Jul 9, 2014 · Permit 14 171721 BLD

    Inspections under way
  • Heating and ventilation · Other

    Proposal to install a CO detection system, exhaust fan and heat tracing system in the basement of an existing apartment building.

    Applied Dec 18, 2013 · issued Jan 23, 2014 · Permit 13 279601 MSA

    Permit issued
  • Addition or alteration · Multiple projects

    Make repairs to 4 balconys on top storey; waterproofing in underground parking garage & concrete topping; repair slabs on grade at building entrance & garage entrances.

    Applied Sep 13, 2005 · issued Sep 21, 2005 · Permit 05 179739 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 666 Briar Hill Ave · Minor variance

    To construct a new dwelling.

    170 m away · filed Sep 25, 2025 · Approved

  • 612 Castlefield Ave · Minor variance

    To construct a new detached 3-storey dwelling, with pool and cabana in the rear yard.

    200 m away · filed Aug 8, 2024 · Approved

  • 14 Manitou Blvd · Minor variance

    To construct a ground floor deck, 2nd floor bay window and other interior alterations to the existing dwelling.

    170 m away · filed Feb 28, 2023 · Approved

  • 570 Chaplin Cres · Minor variance

    To construct a new accessory structure (cabana).

    180 m away · filed Nov 21, 2022 · Approved

  • 34 Elm Ridge Dr · Minor variance

    Proposal to construct a second storey addition with balcony on east side of dwelling over existing garage, and a new front canopy.

    240 m away · filed Jul 27, 2022 · Approved

  • 677 Briar Hill Ave · Minor variance

    To construct additions to the front and rear, of the existing dwelling. The applicant is also proposing other interior and exterior alterations.

    210 m away · filed Aug 23, 2021 · Approved

  • 32 Elm Ridge Dr · Minor variance

    To construct a new one storey addition to the rear of the dwelling.

    230 m away · filed Jun 8, 2020 · Approved

  • 20 Forest Ridge Dr · Minor variance

    To construct a new dwelling.

    140 m away · filed Oct 8, 2019 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.