Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

256 Dewhurst Blvd N

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Residential building permit · Alteration to existing building

    Structural alteration on ground floor fr

    Applied Jun 6, 1989 · issued Jun 14, 1989 · completed Jun 8, 2026 · Permit 89 207009 CMB

    Closed (dormant)

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 245 Gowan Ave · Minor variance

    240 m away · filed Jan 12, 2026 · Application withdrawn

  • 270 Floyd Ave · Consent

    To obtain consent to sever the merged property into three residential lots.

    100 m away · filed Dec 10, 2024 · Approved

  • 169 Woodycrest Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a new front porch, which will be enclosed and to reconstruct the front stairs.

    210 m away · filed Sep 7, 2023 · Approved

  • 323 Mortimer Ave · Minor variance

    To maintain the existing three-storey semi-detached dwelling.

    160 m away · filed Apr 14, 2023 · Approved

  • 323 Mortimer Ave · Consent

    To obtain consent to sever a portion of the land for the purpose of a lot addition.

    160 m away · filed Apr 14, 2023 · Approved

  • 269 Donlands Ave · Minor variance

    To permit a fourth dwelling unit within the existing triplex. This dwelling has one basement unit, two ground floor units, and one second level unit and a front basement walkout.

    200 m away · filed Jan 30, 2023 · Approved

  • 256 Gowan Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a front integral garage, a two-storey rear addition (with a ground level deck and basement walkout), as well as a second storey addition.

    210 m away · filed Jun 27, 2022 · Approved

  • 252 Westwood Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear basement addition with a ground floor deck above.

    130 m away · filed Mar 15, 2022 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.