Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

259 Floyd Ave

The City of Toronto has 3 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Proposal to convert existing non legal basement apartment to single family Dwelling. Provide new door off primary bedroom with wood deck

    Applied Aug 28, 2024 · issued Sep 9, 2024 · completed Nov 12, 2024 · Permit 24 205257 BLD

    Closed
  • Small residential project · Finishing basements

    Proposal to convert existing non legal basement apartment to single family Dwelling. Provide new door off primary bedroom with wood deck

    Applied Aug 22, 2024 · completed Aug 23, 2024 · Permit 24 202197 BLD

    Cancelled
  • Small residential project · Multiple projects

    Legalize existing basement apartment. Remove existing stair from groundfloor to basement. Provide new door off primary bedroom with wood deck

    Applied Jul 18, 2024 · completed Jul 25, 2024 · Permit 24 183573 BLD

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 270 Floyd Ave · Consent

    To obtain consent to sever the merged property into three residential lots.

    90 m away · filed Dec 10, 2024 · Approved

  • 29 Memorial Park Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition and a ground floor deck. Also, to permit an existing undersized vehicular parking space width and an increased building height which was constructed beyond the limits of the previously approved building permit.

    230 m away · filed Sep 19, 2023 · Approved

  • 323 Mortimer Ave · Minor variance

    To maintain the existing three-storey semi-detached dwelling.

    180 m away · filed Apr 14, 2023 · Approved

  • 323 Mortimer Ave · Consent

    To obtain consent to sever a portion of the land for the purpose of a lot addition.

    180 m away · filed Apr 14, 2023 · Approved

  • 269 Donlands Ave · Minor variance

    To permit a fourth dwelling unit within the existing triplex. This dwelling has one basement unit, two ground floor units, and one second level unit and a front basement walkout.

    120 m away · filed Jan 30, 2023 · Approved

  • 346 Mortimer Ave · Minor variance

    To convert the existing one-storey, one-unit, detached dwelling into a two-storey, three-unit dwelling by constructing a rear two-storey addition and a complete second storey addition. The existing attached garage will be converted into an integral garage.

    240 m away · filed Aug 22, 2022 · Approved

  • 256 Gowan Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a front integral garage, a two-storey rear addition (with a ground level deck and basement walkout), as well as a second storey addition.

    180 m away · filed Jun 27, 2022 · Approved

  • 5 Donmore Ave · Minor variance

    To construct a new two-storey detached dwelling with an integral garage, a front ground floor porch, and a rear ground floor deck.

    230 m away · filed Jun 21, 2022 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.