Toronto address · Ward 12, Toronto-St. Paul's
259 Forest Hill Rd
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Proposal to install a back water valve
Applied Mar 12, 2019 · issued Mar 12, 2019 · completed Sep 17, 2020 · Permit 19 124360 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
7 storeys · 35 homes · Mixed use
340 m away · Site plan · Under review · filed Feb 25, 2021
- Under appeal
19 storeys · 185 homes · Mixed use
410 m away · Rezoning · Under appeal · filed Mar 27, 2023
Neighbours’ Committee of Adjustment files within 250 m
242 Forest Hill Rd · Minor variance
To construct a new three-storey detached dwelling (including a basement extension below with a walkout), with an integral garage, a front covered porch with stairs and a rear covered patio platform. Also, a new front driveway will be constructed on the east side of the lot. The existing detached garage will be demolished.
140 m away · filed Jul 21, 2025 · Approved
238 Forest Hill Rd · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a one-storey front addition to the existing attached garage, and a rear second storey addition.
170 m away · filed May 12, 2025 · Approved
242 Forest Hill Rd · Minor variance
To construct a new three-storey detached dwelling with an integral garage, a covered front porch with stairs, side (west) stairs, a rear third storey balcony, a rear ground floor covered patio with stairs, a rear basement walkout, and an in-ground swimming pool.
140 m away · filed Jan 8, 2025 · Refused
221 Chaplin Cres · Minor variance
To construct a new three-storey detached dwelling with an integral garage, a covered front porch with stairs, a rear second floor deck with stairs, and a rear basement (ground floor) walkout with a patio.
150 m away · filed Aug 27, 2024 · Refused
263 Forest Hill Rd · Minor variance
To construct a new three-storey detached dwelling with an integral garage on the upper basement level (accessed by a car lift), an indoor pool on the lower basement level, rear basement walkouts on the upper and lower basement levels, and a rear ground floor deck.
30 m away · filed Jul 24, 2024 · Approved
253 Dunvegan Rd · Minor variance
To construct a new three-storey detached dwelling with a covered front porch, a front integral garage ramp (which will lead to parking spaces within the basement), a rear yard outdoor room/terrace, a rear second storey balcony, and a west side third storey balcony. Also, to construct a front yard water feature, a rear in-ground swimming pool, and a one-storey ancillary building (cabana).
180 m away · filed Mar 7, 2024 · Approved
257 Dunvegan Rd · Minor variance
To construct a new three-storey detached dwelling with a front integral garage, a front covered porch, a rear second storey julliette balcony, and a rear third storey balcony. Also, to construct a new one-storey ancillary building (cabana), and an in-ground swimming pool, in the rear yard.
220 m away · filed Mar 4, 2024 · Approved
246 Dunvegan Rd · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing an east side partial/corner third storey addition, a rear (south) two-storey addition, with an expanded rear ground floor patio, and a rear third storey balcony. Also, to construct an ancillary building (cabana) in the rear yard.
250 m away · filed Jan 14, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.