Toronto address · Ward 9, Davenport
26 Concord Ave
The City of Toronto has 8 building permits since 2017 (5 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Small residential project · Multiple projects
Revision - to rebuild existing exterior basement access stair
Applied May 4, 2024 · issued Jun 12, 2024 · Permit 22 174380 BLD (revision 02)
- Revision issued
Small residential project · Multiple projects
REVISION - remove portion of front porch an steps and modify remainin proch and stepsINTERIOR ALTERATIONS TO BASEMENT FLOOR, GROUND FLOOR, 2ND FLOOR AND 3RD FLOOR. ROOF OF EXISTING GROUND FLOOR ADDITION AND EXISTING THIRD FLOOR TO BE RESTRUCTURED.AREA OF BASEMENT WORK: 109.56 SQM AREA OF GROUND FLOOR WORK: 95.26 SQM AREA OF SECOND FLOOR WORK: 79.91 SQM AREA OF THIRD FLOOR WORK: 75.34 SQM
Applied Aug 3, 2023 · issued Aug 15, 2023 · Permit 22 174380 BLD (revision 01)
- Closed
Small residential project · Other
Proposal to install solar panels on the rooftop of existing SFD-detached dwelling.
Applied May 8, 2023 · issued Jun 5, 2023 · completed May 27, 2025 · Permit 23 143010 BLD
- Inspections under way
Heating and ventilation
Hvac - interior alterations to basement floor, ground floor, 2nd floor and 3rd floor. Roof of existing ground floor addition and existing third floor to be restructured.area of basement work: 109.56 sqm area of ground floor work: 95.26 sqm area of second floor work: 79.91 sqm area of third floor work: 75.34 sqm
Applied Dec 23, 2022 · issued Jan 3, 2023 · Permit 22 174380 HVA
- Inspections under way
Small residential project · Multiple projects
Interior alterations to basement floor, ground floor, 2nd floor and 3rd floor. Roof of existing ground floor addition and existing third floor to be restructured.area of basement work: 109.56 sqm area of ground floor work: 95.26 sqm area of second floor work: 79.91 sqm area of third floor work: 75.34 sqm
Applied Jul 10, 2022 · issued Aug 4, 2022 · Permit 22 174380 BLD
- Inspections under way
Plumbing
Plumbing - INTERIOR ALTERATIONS TO BASEMENT FLOOR, GROUND FLOOR, 2ND FLOOR AND 3RD FLOOR. ROOF OF EXISTING GROUND FLOOR ADDITION AND EXISTING THIRD FLOOR TO BE RESTRUCTURED.AREA OF BASEMENT WORK: 109.56 SQM AREA OF GROUND FLOOR WORK: 95.26 SQM AREA OF SECOND FLOOR WORK: 79.91 SQM AREA OF THIRD FLOOR WORK: 75.34 SQM
Applied Jul 10, 2022 · issued Aug 4, 2022 · Permit 22 174380 PLB
- Closed
Drains and site services · Back water valve (Sewer only)
Instllation of one fullport mainline backwater valve - outside
Applied May 26, 2014 · issued May 26, 2014 · completed May 27, 2025 · Permit 14 161494 DRN
- Closed
Drains and site services · Inside and outside drains
Proposal to install new underground water sevice in existing SFD-detached dwelling.
Applied May 16, 2012 · issued May 16, 2012 · completed May 27, 2025 · Permit 12 174302 STS
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
- Under appeal
- Approved
6 storeys · 19 homes · Residential
340 m away · Site plan · Approved · filed Jul 10, 2025
Neighbours’ Committee of Adjustment files within 250 m
894 College St · Minor variance
To alter the existing three-storey mixed-used builiding by constructing a rear three-storey addition. Also, to construct a mechanical room and stairwells on the roof.
140 m away · filed Sep 4, 2026 · Postponed
260 Roxton Rd · Minor variance
To alter the existing two-storey townhouse dwelling by constructing rear one and two-storey additions, a rear second floor deck (above the new rear one-storey addition), and a rear ground floor deck. The existing rear one-storey addition, and rear ground floor deck will be demolished.
200 m away · filed May 9, 2025 · Approved
324 Roxton Rd · Minor variance
To alter the existing two-storey semi-detached dwelling by reconstructing a front covered porch with stairs and a basement walkout, a rear ground floor covered deck, and a rear second floor deck. There will be three residential dwelling units on this lot.
250 m away · filed Apr 9, 2025 · Approved
47 Delaware Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a front one-storey addition (first storey balcony enclosure), and a rear two-storey addition with stairs. The existing rear deck, stairs, and basement walkout will be demolished.
110 m away · filed Jan 23, 2025 · Approved
30 Delaware Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling (duplex) by constructing one-storey additions to the south side and rear, and a rear third storey partial addition with a basement walkout, a patio, a second storey deck with staircase, and a third storey roof deck.
110 m away · filed Mar 22, 2024 · Approved
513 Ossington Ave · Minor variance
To construct a new two-storey detached ancillary building (one laneway suite), in the rear yard, abutting the laneway. The existing fourplex dwelling will be maintained and unaltered.
180 m away · filed Mar 8, 2024 · Approved
475 Ossington Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear second storey addition with a rear third storey rooftop deck. There will be three residential dwelling units within this dwelling.
150 m away · filed Nov 21, 2023 · Approved
466 Dovercourt Rd · Minor variance
To alter the development standards (as approved by Site Specific Zoning By-law 31-2021), for a seven-storey mixed-use building that has varying heights by increasing the residential gross floor area and the height of the building. Also, to reduce the mechanical penthouse area setback, the number of vehicular parking spaces, and the number of loading spaces. There will be a total of 40 dwelling units on the lot.
220 m away · filed Nov 16, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.