Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

262 Jones Ave

The City of Toronto has 7 building permits since 2017 (7 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC REV 01 -- to complete HVAC system

    Applied Sep 16, 2015 · issued Sep 24, 2015 · Permit 14 107441 HVA (revision 02)

    Revision issued
  • Small residential project · Multiple projects

    Proposal for multiple projects. Scope of work includes a new 3rd floor addition, interior alterations, reconstruct front porch, new rear deck on ground floor , new rear deck on 3rd floor, new basement entrance and convert to 2 units with new basement suite..

    Applied Jan 21, 2014 · issued Apr 14, 2014 · Permit 14 107441 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for multiple projects. Scope of work includes a new 3rd floor addition, interior alterations, reconstruct front porch, new rear deck on ground floor , new rear deck on 3rd floor, new basement entrance and convert to 2 units with new basement suite..

    Applied Jan 21, 2014 · issued Apr 14, 2014 · Permit 14 107441 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for multiple projects. Scope of work includes a new 3rd floor addition, interior alterations, reconstruct front porch, new rear deck on ground floor , new rear deck on 3rd floor, new basement entrance and convert to 2 units with new basement suite..

    Applied Jan 21, 2014 · issued Apr 14, 2014 · Permit 14 107441 HVA

    Inspections under way
  • Small residential project · Multiple projects

    Underpining existing foundations, finish basement and basement walkout

    Applied Feb 20, 2013 · issued Mar 1, 2013 · Permit 13 122329 BLD

    Inspections under way
  • Drains and site services

    Drain - Underpining existing foundations, finish basement and basement walkout

    Applied Feb 20, 2013 · issued Mar 1, 2013 · Permit 13 122329 DRN

    Inspections under way
  • Small residential project · Other

    Demolish existing rear detached garage and maintain rear parking pad. SFD

    Applied Oct 4, 2012 · issued Oct 4, 2012 · Permit 12 258601 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 77 Galt Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition (above the rear two-storey portion of the dwelling) and underpinning the basement. Also, to install a ground-mounted air-conditioning device in the front yard.

    190 m away · filed Jun 12, 2026 · Approved

  • 1043 Gerrard St E · Minor variance

    To construct a rear two-storey detached house (abutting the laneway) with front and side (west) juliet balconies on the second floor. The existing two-storey (mixed-use) semi-detached building will be maintained and unaltered. There will be two residential dwelling units on this lot (one dwelling unit within the mixed-use building and one dwelling unit within the detached house).

    160 m away · filed Apr 2, 2025 · Approved

  • 65 Galt Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition with a rear balcony, and a rear ground floor deck with stairs.

    220 m away · filed Jan 8, 2025 · Approved

  • 60 Galt Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear one-storey addition (solarium), a partial rear third storey addition with a rear third storey deck, a rear ground floor deck, and a rear basement walkout.

    250 m away · filed Feb 14, 2024 · Approved

  • 1111 Gerrard St E · Minor variance

    To construct a new six-storey apartment building (cantilevered at the northwest corner and rear (south) portions of the building) with a front covered porch, ground floor front and rear entrance landings with stairs (located at the west side of the building), front balconies on the second to fifth storeys, and a mechanical penthouse with equipment screening on the roof of the sixth storey. There will be one vehicular visitor parking space and seven long-term bicycle parking spaces provided in the rear yard (located below the cantilevered portion of the building abutting the laneway). There wi…

    230 m away · filed Jan 25, 2024 · Refused

  • 17 Myrtle Ave · Minor variance

    To alter the existing one-storey ancillary building (a detached garage abutting the laneway) by constructing a cantilevered second storey addition, to contain a laneway suite.

    140 m away · filed Nov 10, 2023 · Refused

  • 17 Myrtle Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing front and rear two-storey additions (including basement), a second storey side addition, a complete third storey addition with a rear rooftop deck, a front porch and steps, and a rear ground floor deck and stairs. The existing ancillary building (detached garage) in the rear yard, will be maintained.

    140 m away · filed Apr 25, 2023 · Approved

  • 74 Galt Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by converting a portion of the rear third storey balcony into habitable space.

    200 m away · filed Nov 30, 2022 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.