Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

265 Campbell Ave

The City of Toronto has 5 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Interior alterations

    REVISION: This is a revision to the basement layout washroom /laundry room area.Interior alterations on all floors. New insulation and new flooring. See WNP

    Applied Feb 18, 2011 · issued Mar 2, 2011 · completed Jan 5, 2026 · Permit 10 170616 BLD (revision 01)

    Closed
  • Drains and site services

    Drain - Interior alterations on all floors. New insulation and new flooring. See WNP

    Applied Feb 18, 2011 · issued Feb 18, 2011 · completed Oct 24, 2025 · Permit 10 170616 DRN

    Closed
  • Heating and ventilation

    HVAC - Interior alterations on all floors. New insulation and new flooring. See WNP

    Applied May 6, 2010 · issued May 10, 2010 · completed Jan 5, 2026 · Permit 10 170616 HVA

    Closed
  • Plumbing

    Plumbing - Interior alterations on all floors. New insulation and new flooring. See WNP

    Applied May 6, 2010 · issued May 10, 2010 · completed Oct 24, 2025 · Permit 10 170616 PLB

    Closed
  • Small residential project · Interior alterations

    Interior alterations on all floors. New insulation and new flooring. See WNP

    Applied May 6, 2010 · issued May 10, 2010 · completed Jan 5, 2026 · Permit 10 170616 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 209 Symington Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (including a basement level) with a covered deck and stairs.

    200 m away · filed Jul 28, 2026 · Approved

  • 71 Ward St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition (including a basement extension below) with access stairs. The existing side (south) basement walkout and ground floor deck with stairs will be demolished.

    230 m away · filed Jun 11, 2026 · Approved

  • 255 Campbell Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front ground floor addition (porch enclosure).

    20 m away · filed Jun 20, 2024 · Approved

  • 267 Symington Ave · Minor variance

    To construct a new two-storey semi-detached ancillary building (containing one laneway suite), in the rear yard, abutting the laneway. There will be two dwelling units on this lot.

    100 m away · filed May 14, 2024 · Approved

  • 265 Symington Ave · Minor variance

    To construct a new two-storey ancillary building (containing one laneway suite), in the rear yard, abutting the laneway. There will be two dwelling units on this lot.

    110 m away · filed Apr 6, 2024 · Approved

  • 316 Campbell Ave · Minor variance

    To alter the development standards for the 26-storey mixed-use building (as approved under Site Specific Zoning By-Law 1074-2022) by increasing the project average rent across the 21 Affordable Housing Units.

    190 m away · filed Jan 12, 2024 · Approved

  • 315 Perth Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition.

    240 m away · filed Apr 11, 2022 · Approved

  • 317 Perth Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition.

    240 m away · filed Apr 11, 2022 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.