Toronto address · Ward 12, Toronto-St. Paul's
265 Chaplin Cres
The City of Toronto has 1 building permit since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Interior alterations
Existing load bearing walls removal, new beams on columns.
Applied Sep 18, 2025 · issued Sep 23, 2025 · Permit 25 227478 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
7 storeys · 35 homes · Mixed use
240 m away · Site plan · Under review · filed Feb 25, 2021
- Under appeal
19 storeys · 185 homes · Mixed use
340 m away · Rezoning · Under appeal · filed Mar 27, 2023
Neighbours’ Committee of Adjustment files within 250 m
242 Forest Hill Rd · Minor variance
To construct a new three-storey detached dwelling (including a basement extension below with a walkout), with an integral garage, a front covered porch with stairs and a rear covered patio platform. Also, a new front driveway will be constructed on the east side of the lot. The existing detached garage will be demolished.
240 m away · filed Jul 21, 2025 · Approved
301 Chaplin Cres · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition and a rear ground level deck with stairs.
240 m away · filed Feb 7, 2025 · Approved
242 Forest Hill Rd · Minor variance
To construct a new three-storey detached dwelling with an integral garage, a covered front porch with stairs, side (west) stairs, a rear third storey balcony, a rear ground floor covered patio with stairs, a rear basement walkout, and an in-ground swimming pool.
240 m away · filed Jan 8, 2025 · Refused
221 Chaplin Cres · Minor variance
To construct a new three-storey detached dwelling with an integral garage, a covered front porch with stairs, a rear second floor deck with stairs, and a rear basement (ground floor) walkout with a patio.
210 m away · filed Aug 27, 2024 · Refused
263 Forest Hill Rd · Minor variance
To construct a new three-storey detached dwelling with an integral garage on the upper basement level (accessed by a car lift), an indoor pool on the lower basement level, rear basement walkouts on the upper and lower basement levels, and a rear ground floor deck.
80 m away · filed Jul 24, 2024 · Approved
12 Ormsby Cres · Minor variance
To construct a new three-storey detached dwelling with an integral garage, a front porch with a canopy above, a rear ground floor covered terrace with stairs (covered outdoor room), a rear third floor balcony, and a rear yard in-ground swimming pool and hot tub.
230 m away · filed Apr 19, 2024 · Approved
253 Dunvegan Rd · Minor variance
To construct a new three-storey detached dwelling with a covered front porch, a front integral garage ramp (which will lead to parking spaces within the basement), a rear yard outdoor room/terrace, a rear second storey balcony, and a west side third storey balcony. Also, to construct a front yard water feature, a rear in-ground swimming pool, and a one-storey ancillary building (cabana).
210 m away · filed Mar 7, 2024 · Approved
257 Dunvegan Rd · Minor variance
To construct a new three-storey detached dwelling with a front integral garage, a front covered porch, a rear second storey julliette balcony, and a rear third storey balcony. Also, to construct a new one-storey ancillary building (cabana), and an in-ground swimming pool, in the rear yard.
240 m away · filed Mar 4, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.