Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 4, Parkdale-High Park

2659 Dundas St W

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Designated structure · Sign building permit related

    In conjunction with a financial business on the premises, proposal to erect and display two illuminated wall signs displaying static copy. Both of the proposed wall signs are to be erected at the first storey, one of which is to be erected on the northerly elevation is to measure 13.41 metres horizontally by 1.22 metres vertically, at a height of 4.88 metres, and one of which is to measure 4.88 metres horizontally by 1.22 metres vertically. **CASH MONEY**

    Applied May 11, 2015 · issued Nov 9, 2015 · completed Oct 6, 2017 · Permit 15 151243 DST

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 753 Indian Rd · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a side (north) one-storey addition.

    190 m away · filed Aug 24, 2026 · Hearing scheduled

  • 751 Indian Rd · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear third storey addition with a balcony. Also, to maintain the existing rear second storey balcony.

    190 m away · filed Feb 19, 2026 · Approved

  • 2611 Dundas St W · Minor variance

    To alter the existing one-storey detached building (Place of Worship) by converting this building into a three-storey apartment building with complete second and third storey additions, front (east) and side (north) basement level covered entrances, front (east) and rear (west) first level decks with stairs, and rear (west) third level terraces. Also, to construct a new one-storey ancillary building (containing five bicycle spaces and garbage collection) in the rear yard of the property. There will be a total of six residential dwelling units on this lot (two units occupying the basement leve…

    140 m away · filed Dec 2, 2025 · Approved

  • 2591 Dundas St W · Minor variance

    To construct a new three-storey medical office building.

    200 m away · filed Feb 7, 2025 · Application withdrawn

  • 2760 Dundas St W · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 376-2024), for the 6-storey mixed-use building. There will be a total of 33 residential dwelling units on this site.

    230 m away · filed Nov 26, 2024 · Approved

  • 41 Hook Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear one-storey addition (to replace the existing rear one-storey addition), and a rear ground floor deck.

    240 m away · filed Jan 26, 2024 · Approved

  • 58 Humberside Ave · Minor variance

    To alter the existing two-storey townhouse dwelling by constructing a rear two-storey addition, and a new basement secondary suite. Also, to construct a new one-storey ancillary building (detached garage), in the rear yard of the property, abutting the laneway.

    140 m away · filed Jan 16, 2024 · Approved

  • 48 Osler St · Minor variance

    To alter the existing two-storey rowhouse dwelling by constructing a complete third storey addition with a rear terrace.

    230 m away · filed Jun 22, 2023 · Approved

Everything planned in Parkdale-High Park

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.