Toronto address · Ward 19, Beaches-East York
266 Coleridge Ave
The City of Toronto has 3 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Plumbing · Piping: SFD/Semi
REVISION-01: Add backwater valveResidential plumbing repair: Replacing vertical main stack and upgrading 5 feet of underground drain to PVC with a new 4-inch base cleanout. Main stack size is 3'-inch and 15 feet in length. Connect to the bathroom on the 2nd floor and route and pickup the kitchen drain. Run the stack down to the basement. Underground work - break up concrete and replace 5 feet of underground piping.
Applied Aug 28, 2026 · issued Aug 28, 2026 · Permit 26 220824 PSA (revision 01)
- Inspections under way
Plumbing · Piping: SFD/Semi
Residential plumbing repair: Replacing vertical main stack and upgrading 5 feet of underground drain to PVC with a new 4-inch base cleanout. Main stack size is 3'-inch and 15 feet in length. Connect to the bathroom on the 2nd floor and route and pickup the kitchen drain. Run the stack down to the basement. Underground work - break up concrete and replace 5 feet of underground piping.
Applied Aug 17, 2026 · issued Aug 19, 2026 · Permit 26 220824 PSA
- Inspections under way
Drains and site services · Inside and outside drains
Residential plumbing repair: Replacing vertical main stack and upgrading 5 feet of underground drain to PVC with a new 4-inch base cleanout. Main stack size is 3'-inch and 15 feet in length. Connect to the bathroom on the 2nd floor and route and pickup the kitchen drain. Run the stack down to the basement. Underground work - break up concrete and replace 5 feet of underground piping.
Applied Aug 17, 2026 · issued Aug 19, 2026 · Permit 26 221042 STS
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
705 Mortimer Ave · Minor variance
240 m away · filed Sep 22, 2026 · Accepted
254 Coleridge Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear cantilevered second storey addition. The existing enclosed front porch, and the rear one-storey ancillary building (shed) will be maintained and unaltered.
30 m away · filed Mar 18, 2026 · Approved
215 King Edward Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition with a second storey balcony.
230 m away · filed Oct 6, 2025 · Approved
206 Lumsden Ave · Minor variance
To legalize and to maintain the existing enclosed front porch that was constructed without an authorized building permit.
140 m away · filed Oct 24, 2024 · Approved
221 Coleridge Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a partial second storey addition, a rear two-storey addition, and a rear ground floor deck.
190 m away · filed Sep 16, 2024 · Approved
110 Barker Ave · Minor variance
To legalize and to maintain the conversion of the integral garage into habitable space with a front ground floor basement walkout entrance, that was constructed without an authorized building permit. There will be zero parking spaces on-site.
180 m away · filed Jun 11, 2024 · Deferred
686 Mortimer Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a rear one-storey addition with a rear covered basement walkout.
240 m away · filed Oct 23, 2023 · Approved
186 Holborne Ave · Minor variance
To convert the existing one-storey detached dwelling from one unit into two units (one primary suite located on the first and second storey, and one secondary suite located in the basement), by constructing a complete second storey addition, a rear two-storey addition, a rear basement walkout, a rear ground floor deck, a front integral garage, a front covered porch, and front ground and second floor bay windows.
130 m away · filed Apr 13, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.