Toronto address · Ward 13, Toronto Centre
266 Sumach St
The City of Toronto has 1 building permit since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Demolition
Proposal for full building demolition and backfill to grade
Applied Dec 4, 2025 · issued May 8, 2026 · 4 homes removed · Permit 25 262338 DEM
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
591-620 Dundas Street East and 325 Gerrard Street East
Residential
220 m away · Condominium · Approved · filed Jun 22, 2023
- Under review
591 Dundas Street East and 325 Gerrard Street East
26 storeys · 271 homes · Non-residential
340 m away · Site plan · Under review · filed Jan 13, 2025
- Under review
430 homes · Residential
360 m away · Condominium · Under review · filed Nov 4, 2021
- Approved
35 storeys · 413 homes · Mixed use
370 m away · Rezoning · Approved · filed Feb 27, 2026
- Under review
747-761 Dundas Street East and 2 Mark Street
48 storeys · 1,197 homes · Mixed use
380 m away · Rezoning · Under review · filed Oct 8, 2025
- Under review
11 storeys · Mixed use
390 m away · Site plan · Under review · filed May 26, 2026
Neighbours’ Committee of Adjustment files within 250 m
28 Sword St · Minor variance
To construct a one-storey detached ancillary building (two-car garage) in the rear yard, abutting the laneway.
180 m away · filed Feb 18, 2026 · Approved
359 1/2 Sackville St · Minor variance
To construct a new second residential building ((two-storey detached dwelling (garden suite) located in the rear yard, abutting Spruce Street, as approved under Committee of Adjustment File A0995/20TEY)) with a basement, and a side (north) second storey juliet balcony, as well as to reduce the number of existing lawfully vehicular parking spaces. There will be a total of two residential dwelling units on this lot ((one unit occupying the main dwelling, and one unit occupying the rear second residential building (garden suite)).
250 m away · filed Jul 18, 2025 · Postponed
337 Sackville St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a rear ground floor deck.
200 m away · filed Jan 9, 2025 · Approved
147 Spruce St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear ground floor deck with stairs and a swim spa.
240 m away · filed Feb 13, 2024 · Postponed
40 Nasmith Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing one and two -storey rear additions (with an unfinished basement), as well as a rear ground floor deck with stairs.
180 m away · filed Oct 10, 2023 · Refused
126 Spruce St · Minor variance
To construct a new one-storey ancillary building (detached garage with hobby workshop) in the rear yard, abutting the laneway (Chipping Sparrow Lane).
230 m away · filed Sep 14, 2023 · Approved
456 Gerrard St E · Minor variance
To alter the existing two-storey mixed-use building by converting the ground floor use from one retail store into one personal service shop (salon) and retail store. The existing dwelling unit on the second level will be maintained and unaltered.
130 m away · filed Jun 12, 2023 · Approved
224 River St · Minor variance
To alter the existing two-storey rowhouse by converting the existing attic space into habitable space and constructing a rear third storey balcony.
210 m away · filed May 29, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.