Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 6, York Centre

268 Brighton Ave

The City of Toronto has 6 building permits since 2017 (3 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Underpinning

    Revision - basement underpinning

    Applied Oct 11, 2022 · issued Oct 25, 2022 · Permit 21 242850 BLD (revision 01)

    Revision issued
  • Plumbing

    Plumbing - Proposal for interior alterations to the basement and a new sky light on main floor bathroom and new siding.

    Applied Nov 29, 2021 · issued Dec 20, 2021 · Permit 21 242850 PLB

    Inspections under way
  • Small residential project · Interior alterations

    Proposal for interior alterations to the basement and a new sky light on main floor bathroom and new siding.

    Applied Nov 29, 2021 · issued Dec 20, 2021 · Permit 21 242850 BLD

    Inspections under way
  • Plumbing

    Plumbing - New second floor addition over existing 1 storey dwelling, interior alterations, new covered front porch and stairs and new rear stairs.

    Applied Jul 18, 2019 · issued Oct 18, 2019 · completed Mar 25, 2022 · Permit 19 191627 PLB

    Cancelled
  • Small residential project · Multiple projects

    New second floor addition over existing 1 storey dwelling, interior alterations, new covered front porch and stairs and new rear stairs.

    Applied Jul 18, 2019 · issued Oct 18, 2019 · completed Mar 25, 2022 · Permit 19 191627 BLD

    Cancelled
  • Small residential project · Garage

    Double two car garage

    Applied Jul 10, 2003 · issued Jul 10, 2003 · completed Aug 25, 2026 · Permit 03 154498 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a new second storey addition to the existing dwelling.

    Decision: Approved (hearing May 23, 2019)

    Filed Mar 4, 2019 · File A0160/19NY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 277 Brighton Ave · Minor variance

    To legalize and maintain the existing rear deck.

    100 m away · filed May 22, 2026 · Approved

  • 266 Brighton Ave · Minor variance

    To construct a new dwelling.

    10 m away · filed Jan 27, 2025 · Approved

  • 247 Brighton Ave · Minor variance

    To permit the dwelling currently under construction.

    140 m away · filed Jul 27, 2023 · Approved

  • 199 Searle Ave · Minor variance

    To enclose the existing porch.

    230 m away · filed Mar 18, 2021 · Approved

  • 178 Acton Ave · Minor variance

    To construct a new dwelling.

    250 m away · filed Dec 3, 2020 · Approved

  • 242 Acton Ave · Minor variance

    To construct a one storey rear addition.

    230 m away · filed Oct 29, 2019 · Approved

  • 247 Brighton Ave · Consent

    The obtain consent to sever the property into three undersized residential lots.

    140 m away · filed Apr 25, 2019 · Refused

  • 247 Brighton Ave · Minor variance

    To construct a new dwelling

    140 m away · filed Apr 25, 2019 · Refused

Everything planned in York Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.