Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

268 Millwood Rd

The City of Toronto has 2 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Interior alterations to the first and second floor

    Applied Sep 8, 2022 · issued Sep 12, 2022 · Permit 22 122622 PLB

    Revocation pending
  • Small residential project · Interior alterations

    Interior alterations to the first and second floor

    Applied Mar 14, 2022 · issued Apr 12, 2022 · Permit 22 122622 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 105 Belsize Dr · Minor variance

    To alter the existing two-storey detached dwelling (houseplex) by constructing a front basement walkout, and a front yard parking pad. Also, to convert the existing front integral garage into habitable space (one residential dwelling unit). There will be a total of four residential dwelling units on this lot (one unit within the basement level, two units on the ground level, and one unit on the second level).

    210 m away · filed May 6, 2026 · Approved

  • 522 Mount Pleasant Rd · Minor variance

    To alter the existing three-storey commercial building by constructing a front entrance accessible ramp, a complete fourth storey addition with a side (south) courtyard, and a staircase enclosure on the rooftop level. This building will contain medical office and personal service shop uses. There will be two accessible parking spaces, and one standard parking space provided on-site.

    110 m away · filed Nov 5, 2025 · Approved

  • 103 Belsize Dr · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing front and rear three-storey additions (a portion of the rear addition will be above the existing two-storey), a rear basement walkout, and rear ground and second floor decks with stairs. There will be a total of three residential dwelling units (triplex) (one dwelling unit within the basement, one dwelling unit on the first level, and one dwelling unit to occupy the second and third levels) on this lot.

    220 m away · filed Oct 3, 2024 · Approved

  • 171 Belsize Dr · Minor variance

    To construct a new two-storey detached dwelling with a front integral garage, rear basement/ground floor deck with exterior stairs, and a rear basement walkout.

    80 m away · filed Jun 7, 2023 · Approved

  • 551 Mount Pleasant Rd · Minor variance

    Proposal to renovate and partially reconstruct existing theatre with a three-storey rear addition. This proposal is an expansion of a legal non-conforming use of an entertainment place of assembly. A related Site Plan Approval Application 23 110086 NNY 15 SA is currently under review. This application was previously deferred on June 22nd, 2023 to allow the applicant to discuss and meet with the neighbors.

    220 m away · filed Mar 31, 2023 · Refused

  • 180 Belsize Dr · Minor variance

    To complete the construction of a rear yard deck.

    230 m away · filed Nov 28, 2022 · Approved

  • 126 Belsize Dr · Minor variance

    To alter the existing two-storey detached dwelling by constructing a third storey addition with a rear balcony, a one-storey rear addition and an enclosed front porch.

    100 m away · filed Jan 21, 2022 · Approved

  • 101 Belsize Dr · Minor variance

    To alter the existing two-storey detached dwelling by constructing a new front porch with a balcony above.

    230 m away · filed Dec 23, 2021 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.