Toronto address · Ward 21, Scarborough Centre
2680 Lawrence Ave E
The City of Toronto has 4 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
Revision 01: Permit revision to be submitted for additional work not captured under initial permit setHVAC - Proposed re-grading of exterior storefront walkway and repositioning of the storefront entrance door to meet accessibility requirements. Interior renovation to include new interior partitions, new floor finishes, furniture, Millwork, ATM, plumbing fixtures.
Applied Sep 15, 2023 · issued Sep 18, 2023 · completed Sep 26, 2023 · Permit 23 141462 HVA (revision 01)
- Closed
Addition or alteration · Interior alterations
Proposed re-grading of exterior storefront walkway and repositioning of the storefront entrance door to meet accessibility requirements. Interior renovation to include new interior partitions, new floor finishes, furniture, Millwork, ATM, plumbing fixtures.
Applied May 4, 2023 · issued May 23, 2023 · completed Oct 4, 2023 · Permit 23 141462 BLD
- Closed
Heating and ventilation
HVAC - Proposed re-grading of exterior storefront walkway and repositioning of the storefront entrance door to meet accessibility requirements. Interior renovation to include new interior partitions, new floor finishes, furniture, Millwork, ATM, plumbing fixtures.
Applied May 4, 2023 · issued May 23, 2023 · completed Sep 26, 2023 · Permit 23 141462 HVA
- Closed
Plumbing
Plumbing - Proposed re-grading of exterior storefront walkway and repositioning of the storefront entrance door to meet accessibility requirements. Interior renovation to include new interior partitions, new floor finishes, furniture, Millwork, ATM, plumbing fixtures.
Applied May 4, 2023 · issued May 23, 2023 · completed Aug 16, 2023 · Permit 23 141462 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
11 storeys · 206 homes · Mixed use
100 m away · Site plan · Approved · filed Dec 5, 2024
- Under appeal
2640-2650 Lawrence Avenue East and 1451 Midland Avenue
43 storeys · 1,001 homes · Mixed use
180 m away · Rezoning · Under appeal · filed Jul 29, 2025
- Under appeal
2640-2650 Lawrence Avenue East and 1451 Midland Avenue
43 storeys · 1,001 homes · Mixed use
180 m away · Rezoning · Under appeal · filed Nov 30, 2022
Neighbours’ Committee of Adjustment files within 250 m
2650 Lawrence Ave E · Consent
To obtain consent to a long-term lease in excess of 21 years. This is a Delegated Consent; there will be no public hearing.
150 m away · filed Aug 27, 2026 · Accepted
2655 Lawrence Ave E · Minor variance
To alter the development standards for the mixed use development, by increasing the overall building height, the number of units and density. Cross-Reference Site Plan Application 21 145567 ESC 22 SA.
150 m away · filed Aug 12, 2025 · Approved
1385 Midland Ave · Minor variance
To reduce indoor amenity space of the existing building.
250 m away · filed Aug 9, 2024 · Approved
2740 Lawrence Ave E · Minor variance
To permit a temporary 231 m² sales centre (four year time period) located within the existing driveway and parking areas of the former school. The application is also subject to a Zoning By-law Amendment Application (File No.: 19 242173 ESC 21 OZ) and a Draft Plan of Subdivision Application (File No.: 19 242185 ESC 21 SB).
240 m away · filed May 27, 2020 · Approved
2665 Lawrence Ave E · Minor variance
To permit a reduction of the parking provided on the site to allow for access to an additional 111 parking spaces on the adjacent lands leased from Hydro One Networks Inc.
110 m away · filed Feb 20, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.