Toronto address · Ward 19, Beaches-East York
27 Duart Park Rd
The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - To demolish existing dwelling and construct a new TWO storey dwelling see TLAB dec and zzc review
Applied Mar 18, 2021 · issued Mar 24, 2021 · completed Dec 5, 2022 · Permit 20 167708 HVA
- Closed
Plumbing
Plumbing - To demolish existing dwelling and construct a new TWO storey dwelling see TLAB dec and zzc review
Applied Mar 15, 2021 · issued Mar 15, 2021 · completed Dec 5, 2022 · Permit 20 167708 PLB
- Closed
New house · New building
To demolish existing dwelling and construct a new TWO storey dwelling see TLAB dec and zzc review
Applied Jul 15, 2020 · issued Oct 1, 2020 · completed Dec 7, 2022 · 1 home added · Permit 20 167708 BLD
- Closed
Demolition
To demolish existing dwelling and construct a new three storey dwelling
Applied Jul 15, 2020 · issued Oct 1, 2020 · completed Nov 25, 2022 · 1 home removed · Permit 20 167710 DEM
- Closed
Drains and site services
Drain - To demolish existing dwelling and construct a new three storey dwelling
Applied Jul 15, 2020 · issued Oct 1, 2020 · completed Dec 5, 2022 · Permit 20 167708 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To construct a new three-storey detached dwelling with a rear third-storey deck, a front porch, and a rear sunken patio.
Decision: Refused (hearing Jun 12, 2019)
Filed Jan 16, 2019 · Appeal: CofA decision overturned - TLAB approved with conditions · File A0041/19TEY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
52 Balsam Ave · Minor variance
To maintain the existing two-storey semi-detached dwelling (duplex). There is a total of two residential dwelling units on this lot.
170 m away · filed Feb 3, 2026 · Postponed
52 Balsam Ave · Minor variance
To maintain the existing two-storey semi-detached dwelling (duplex). There is a total of two residential dwelling units on this lot.
170 m away · filed Feb 3, 2026 · Postponed
52 Balsam Ave · Consent
To obtain consent to sever the property into two residential lots.
170 m away · filed Feb 3, 2026 · Postponed
99 Scarboro Beach Blvd · Minor variance
To alter the existing two-storey semi-detached dwelling by replacing the existing rear one-storey addition and decks with a new two-storey addition (including a basement level, and a first level deck with stairs). The existing covered front porch with stairs will be maintained and unaltered.
170 m away · filed Apr 30, 2025 · Approved
2120 Queen St E · Minor variance
To permit a place of amusement use (indoor golf simulator) on the second and third levels of the existing three-storey commercial building. Also, to construct a rear exit stair extension leading to the third storey, and to reconstruct the existing rear third storey terrace. The existing restaurant and grocery store (located within the basement and first levels) will be maintained and unaltered.
240 m away · filed Oct 25, 2024 · Approved
81 Scarboro Beach Blvd · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a rear ground floor deck.
220 m away · filed Mar 20, 2024 · Application withdrawn
155 Maclean Ave · Minor variance
To construct a new one-and-one-half-storey ancillary building (detached garage) in the rear yard. The existing semi-detached ancillary building (garage) will be demolished.
170 m away · filed Sep 8, 2023 · Approved
136 Hammersmith Ave · Minor variance
To construct a new three-storey detached dwelling with a front integral garage, a covered front porch, and a rear partially covered patio.
240 m away · filed Sep 6, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.