Toronto address · Ward 9, Davenport
27 Lauder Ave
The City of Toronto has 4 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations, new rear deck and finished basement in existing single family dwelling.
Applied Feb 2, 2018 · issued Feb 5, 2018 · completed Dec 18, 2019 · Permit 17 269664 HVA
- Closed
Plumbing
Plumbing - Proposal for interior alteration, a new rear deck and finish basement.
Applied Nov 30, 2017 · issued Dec 12, 2017 · completed Dec 18, 2019 · Permit 17 269664 PLB
- Closed
Small residential project · Other
Proposal for interior alterations, new rear deck and finished basement in existing single family dwelling.
Applied Nov 30, 2017 · issued Dec 5, 2017 · completed Dec 18, 2019 · Permit 17 269664 BLD
- Closed
Drains and site services
Drain - Proposal for interior alteration, a new rear deck and finish basement.
Applied Nov 30, 2017 · issued Dec 12, 2017 · completed Dec 18, 2019 · Permit 17 269664 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
122 Lauder Ave · Minor variance
To construct a new two-storey detached dwelling with a front covered porch with stairs, a rear ground floor deck with stairs, a rear patio, and a rear third storey balcony. Also, to alter the existing rear one-storey ancillary building (detached garage) by constructing a one storey-addition along the west and south walls.
240 m away · filed Oct 20, 2025 · Approved
46 Highview Cres · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a complete third storey addition with a rear balcony, a new front ground level vestibule entrance, and a new rear ground floor entrance with stairs (abutting the north portion of the dwelling).
220 m away · filed Aug 19, 2025 · Approved
104 Lauder Ave · Minor variance
To alter the existing two-storey detached dwelling by enclosing the rear porch into habitable space.
170 m away · filed May 20, 2025 · Approved
47 Northcliffe Blvd · Minor variance
To alter the existing three-storey detached dwelling by constructing a rear one-storey addition (sunroom). The existing rear one-storey ancillary building (garage) will be maintained and unaltered.
150 m away · filed Feb 7, 2025 · Approved
1350 Davenport Rd · Minor variance
To convert the existing four-storey detached dwelling (triplex) into an apartment building (containing seven residential dwelling units) by constructing a front covered porch, and rear stairs on all levels. Also, to permit a front yard parking pad, abutting Davenport Road.
210 m away · filed Jan 17, 2024 · Approved
89 Regal Rd · Minor variance
To construct a new three-storey detached dwelling with a front integral garage, a rear ground level deck with a walkout basement, front and rear second storey balconies, and a rear third storey balcony.
210 m away · filed Mar 14, 2022 · Approved
89 Regal Rd · Consent
To obtain consent to sever the property into two residential lots.
210 m away · filed Mar 14, 2022 · Approved
89 Regal Rd · Minor variance
To construct a new three-storey detached dwelling with a front integral garage, a rear ground level deck with a walkout basement, front and rear second storey balconies, and a rear third storey balcony.
210 m away · filed Mar 14, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.