Toronto address · Ward 20, Scarborough Southwest
27 Winter Ave
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Cancelled
Small residential project · Other
Proposed install solar panels on roof
Applied Aug 29, 2025 · completed Sep 11, 2025 · Permit 25 217773 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
80 Huntington Ave · Minor variance
To construct a new two-storey duplex. The existing one-storey dwelling will be demolished.
200 m away · filed Aug 13, 2026 · Hearing scheduled
45 Commonwealth Ave · Minor variance
To construct a new two-storey detached building (triplex) with a front covered porch, front ground floor balcony, front second storey balcony, rear ground floor deck, rear second storey balcony and rear basement walkout. The existing one-storey detached dwelling will be demolished.
240 m away · filed Mar 24, 2025 · Approved
24 Winter Ave · Minor variance
To construct a new two-storey detached dwelling with a secondary suite in the basement. There will be a total of two dwelling units on the lot.
80 m away · filed Jan 15, 2025 · Approved
60 Huntington Ave · Minor variance
To construct a new three-storey fourplex. Cross reference Consent and Minor Variance Applications A0006/25SC and B0003/25SC being considered jointly.
160 m away · filed Dec 31, 2024 · Refused
60 Huntington Ave · Consent
To obtain consent to sever the existing lot into two new residential lots. Cross reference Minor Variance applications A0006/25SC and A0005/25SC being considered jointly.
160 m away · filed Dec 31, 2024 · Refused
60 Huntington Ave · Minor variance
To construct a new three-storey fourplex. Cross reference Consent and Minor Variance Applications A0006/25SC and B0003/25SC being considered jointly.
160 m away · filed Dec 31, 2024 · Refused
56 Falmouth Ave · Minor variance
To permit and maintain the existing undersized tandem parking space in the side yard of the lot (abutting Brussels Road) containing a proposed Multi-tenant House. NOTE: This item was previously rescheduled from the Committee of Adjustment hearing on December 4, 2024 hearing, and deferred at the Committee of Adjustment hearing on January 16, 2025.
220 m away · filed Oct 16, 2024 · Approved
898 Danforth Rd · Minor variance
To construct a second storey addition to existing dwelling.
250 m away · filed Mar 20, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.