Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

270 Donlands Ave

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • New building

    permit to construct new 8 storey / 44 suites - Community Housing Building - See 07 287294STE for site plan approval.

    Applied Sep 30, 2008 · issued Apr 26, 2010 · completed Jul 22, 2025 · 44 homes added · Permit 08 208545 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 301 Cosburn Ave · Minor variance

    To alter the existing rear one-storey detached ancillary building (one-car garage) by constructing a one-storey addition along the west side wall of this building.

    190 m away · filed Jul 21, 2026 · Approved

  • 40 Cadorna Ave · Minor variance

    To legalize and to maintain the side (north) one-storey addition (addition to rear of the existing attached garage and new garage roof) of the existing two-storey detached dwelling, that was constructed without an authorized building permit. Also, to permit and maintain the new front porch roof.

    180 m away · filed Jul 8, 2026 · Postponed

  • 250 Gamble Ave · Minor variance

    To construct a new one-storey detached ancillary building (prefabricated storage shed), in the rear yard of the existing two-storey detached dwelling. The existing rear one-storey detached ancillary building (one-car garage abutting the driveway) will be maintained and unaltered. The existing rear one-storey detached ancillary building (workshop) will be demolished. There is a total of two residential dwelling units on this lot.

    230 m away · filed May 28, 2026 · Approved

  • 301 Cosburn Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a complete second storey addition.

    190 m away · filed Jan 13, 2026 · Approved

  • 210 Cosburn Ave · Minor variance

    To alter the existing four-storey apartment building (containing 33 residential dwelling units) by converting the existing integral garage, laundry, and storage areas into four additional residential dwelling units (located within the basement level). There will be a total of 37 residential dwelling units and 16 lawful parking spaces on this lot.

    220 m away · filed Feb 6, 2025 · Approved

  • 39 Memorial Park Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a complete second storey addition, a rear two-storey addition with a first floor deck and stairs, and a new front patio with a canopy.

    250 m away · filed Jan 27, 2025 · Approved

  • 270 Floyd Ave · Consent

    To obtain consent to sever the merged property into three residential lots.

    170 m away · filed Dec 10, 2024 · Approved

  • 29 Memorial Park Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition and a ground floor deck. Also, to permit an existing undersized vehicular parking space width and an increased building height which was constructed beyond the limits of the previously approved building permit.

    210 m away · filed Sep 19, 2023 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.