Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

275 Shuter St

The City of Toronto has 39 building permits since 2017 (25 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Scope includes space heating system associated with the heating boilers, domestic hot water system (Including but not limited to associated domestic hot water boilers, piping infrastructure, gas service, venting, combustion air, recirculation pumps, drains, valves, sensors, gauges, DHW storage tanks, etc.) All associated electrical infrastructure to support the systems above. Upgrade the existing BAS to monitor and control all mechanical equipment in the buildings. All associated control infrastructure to support the systems above. All associated structural components to support th…

    Applied Apr 9, 2026 · issued Apr 13, 2026 · Permit 26 130858 PLB

    Inspections under way
  • Addition or alteration · Other

    Scope includes space heating system associated with the heating boilers, domestic hot water system (Including but not limited to associated domestic hot water boilers, piping infrastructure, gas service, venting, combustion air, recirculation pumps, drains, valves, sensors, gauges, DHW storage tanks, etc.) All associated electrical infrastructure to support the systems above. Upgrade the existing BAS to monitor and control all mechanical equipment in the buildings. All associated control infrastructure to support the systems above. All associated structural components to support the systems a…

    Applied Mar 17, 2026 · issued Apr 13, 2026 · Permit 26 130858 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Scope includes space heating system associated with the heating boilers, domestic hot water system (Including but not limited to associated domestic hot water boilers, piping infrastructure, gas service, venting, combustion air, recirculation pumps, drains, valves, sensors, gauges, DHW storage tanks, etc.) All associated electrical infrastructure to support the systems above. Upgrade the existing BAS to monitor and control all mechanical equipment in the buildings. All associated control infrastructure to support the systems above. All associated structural components to support the sy…

    Applied Mar 17, 2026 · issued Apr 13, 2026 · Permit 26 130858 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior Common Area Accessibility Upgrades on Ground Floor Lobby and Community room,Penthouse Community Room and Laundry room

    Applied Feb 5, 2025 · Permit 25 113113 BLD

    Under review
  • Heating and ventilation

    HVAC - Interior Common Area Accessibility Upgrades on Ground Floor Lobby and Community room,Penthouse Community Room and Laundry room

    Applied Feb 5, 2025 · Permit 25 113113 HVA

    Issuance pending
  • Plumbing

    Plumbing - Interior Common Area Accessibility Upgrades on Ground Floor Lobby and Community room,Penthouse Community Room and Laundry room

    Applied Feb 5, 2025 · Permit 25 113113 PLB

    Issuance pending
  • Heating and ventilation · Alter: Boiler/Furnace/AC replacement

    Replacement of all the boilers and equipment in mechanical room.

    Applied Jan 20, 2025 · Permit 25 106634 MSA

    Refusal notice
  • Heating and ventilation

    HVAC - Interior Common Area Accessibility Upgrades on Ground Floor Lobby and Community room,Penthouse Community Room and Laundry room

    Applied Jan 7, 2025 · issued Apr 4, 2025 · Permit 25 101520 HVA

    Inspections under way
  • Plumbing

    Plumbing - Interior Common Area Accessibility Upgrades on Ground Floor Lobby and Community room,Penthouse Community Room and Laundry room

    Applied Jan 7, 2025 · issued Apr 4, 2025 · Permit 25 101520 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior Common Area Accessibility Upgrades on Ground Floor Lobby and Community room,Penthouse Community Room and Laundry room

    Applied Jan 6, 2025 · issued Apr 4, 2025 · Permit 25 101520 BLD

    Inspections under way
  • Addition or alteration · Other

    Proposed outdoor generator installation to replace the existing.

    Applied Aug 1, 2023 · issued Sep 26, 2023 · Permit 23 183207 BLD

    Permit issued
  • Addition or alteration · Other

    Proposed outdoor generator installation to replace the existing.

    Applied Aug 1, 2023 · issued Sep 22, 2023 · Permit 23 183201 BLD

    Permit issued
Show 27 more permits
  • Plumbing · Piping: other buildings

    Proposal to replace all main horizontal sanitary piping and some portion of sanitary risers in the basement, main floor and second floor. replacement of all kitchen sinks, water closets, lavatories, and shower heads c/w new isolation valves and access doors within dwelling units. 295 Shuter Street

    Applied Oct 16, 2020 · issued Nov 25, 2020 · completed Aug 30, 2023 · Permit 20 207463 PSA

    Closed
  • Plumbing · Piping: other buildings

    Proposal to replace all main horizontal sanitary piping and some portion of sanitary risers in the basement, main floor and second floor. replacement of all kitchen sinks, water closets, lavatories, and shower heads c/w new isolation valves and access doors within dwelling units. 275 Shuter Street

    Applied Oct 16, 2020 · issued Nov 17, 2020 · Permit 20 207448 PSA

    Permit issued
  • Plumbing · Piping: other buildings

    Proposal to replace all main horizontal sanitary piping and some portion of sanitary risers in the basement, main floor and second floor. replacement of all kitchen sinks, water closets, lavatories, and shower heads c/w new isolation valves and access doors within dwelling units. 285 Shuter Street

    Applied Oct 16, 2020 · issued Nov 24, 2020 · completed Jun 1, 2023 · Permit 20 207457 PSA

    Closed
  • Addition or alteration · Other

    Proposal to construct canopy in the existing bike enclosure for existing apartment building

    Applied Jul 15, 2020 · issued Sep 16, 2020 · Permit 20 167853 BLD

    Inspections under way
  • Addition or alteration · Other

    Proposal to construct 2 prefabricated aluminum bike rack structures for existing apartment building

    Applied Jul 15, 2020 · issued Aug 12, 2020 · Permit 20 167820 BLD

    Permit issued
  • Addition or alteration · Other

    Proposal to construct 2 prefabricated aluminum bike rack structures for existing apartment building

    Applied Jul 15, 2020 · issued Aug 12, 2020 · Permit 20 167831 BLD

    Permit issued
  • Fire and security upgrade · Electromagnetic locks

    Installation of single maglock on one door, located on the ground floor

    Applied Feb 14, 2019 · issued Feb 21, 2019 · Permit 19 115363 FSU

    Inspections under way
  • Fire and security upgrade · Electromagnetic locks

    Install 1 maglock for TCHC on one door located on the ground floor

    Applied Jan 10, 2019 · issued Feb 19, 2019 · Permit 19 103067 FSU

    Inspections under way
  • Fire and security upgrade · Electromagnetic locks

    Installation of two single maglocks on one door, located on the ground floor

    Applied Jan 9, 2019 · completed Feb 19, 2019 · Permit 19 102780 FSU

    Cancelled
  • Fire and security upgrade · Electromagnetic locks

    Proposed 2 electromagnetic locks on ground floor.

    Applied Dec 5, 2018 · completed Dec 21, 2018 · Permit 18 265026 FSU

    Cancelled
  • Heating and ventilation · Other

    Installation of 250 KW CHEP System

    Applied Apr 3, 2018 · issued Apr 18, 2018 · completed Sep 17, 2019 · Permit 18 137343 MSA

    Closed
  • Heating and ventilation · Alter: Boiler/Furnace/AC replacement

    Proposed alteration of heating distribution system to accept future CHP systems.

    Applied Mar 23, 2018 · issued Apr 18, 2018 · completed Sep 26, 2019 · Permit 18 133839 MSA

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Installation of 4 electromagnetic maglocks, 1 on the penthouse and 3 on the first floor

    Applied Mar 16, 2018 · issued Mar 20, 2018 · completed Aug 9, 2018 · Permit 18 130224 FSU

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Proposal to install 4 maglocks in existing apartment building. Convenience address is 295 SHUTER ST.

    Applied Dec 22, 2017 · issued Jan 30, 2018 · completed Mar 14, 2018 · Permit 17 278730 FSU

    Closed
  • Fire and security upgrade · Fire alarm

    Fire panel replacement

    Applied Dec 5, 2016 · issued Dec 13, 2016 · completed Sep 1, 2017 · Permit 16 259989 FSU

    Closed
  • Fire and security upgrade · Fire alarm

    Fire Alarm panel replacement to Apartment Building.

    Applied Dec 5, 2016 · issued Dec 14, 2016 · completed Jul 27, 2017 · Permit 16 260036 FSU

    Closed
  • Heating and ventilation

    HVAC - Proposal to install a gas fired generator at grade in the generator room on the south side of the property. Proposal to include mechanical exhaust.

    Applied Oct 29, 2013 · issued Nov 27, 2013 · Permit 13 258044 HVA

    Permit issued
  • Addition or alteration · Other

    Proposal to install a gas fired generator at grade in the generator room on the south side of the property. Proposal to include mechanical exhaust.

    Applied Oct 29, 2013 · issued Nov 27, 2013 · Permit 13 258044 BLD

    Inspections under way
  • Plumbing

    Plumbing - Interior alteration to the Penthouse level area to provide accessible access to the area and a retrofit of the ground floor washroom.. This proposal also includes the revamping of five (5) accessible parking spots., There are five (5) accessible spots existing on the property.

    Applied Dec 23, 2010 · issued Jan 11, 2011 · Permit 10 319763 PLB

    Inspections under way
  • Addition or alteration · Multiple projects

    Interior alteration to the Penthouse level area to provide accessible access to the area and a retrofit of the ground floor washroom.. This proposal also includes the revamping of seven (7) accessible parking spots for the building known as 295 Shuter Street which is a convenience address for 275 Shuter street., there are seven (7) accessible spots existing on the property.

    Applied Dec 23, 2010 · issued Dec 30, 2010 · Permit 10 319703 BLD

    Inspections under way
  • Addition or alteration · Multiple projects

    Interior alteration to the Penthouse level area to provide accessible access to the area and a retrofit of the ground floor washroom.. This proposal also includes the revamping of five (5) accessible parking spots., There are five (5) accessible spots existing on the property.

    Applied Dec 23, 2010 · issued Dec 30, 2010 · Permit 10 319763 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Interior alteration to the Penthouse level area to provide accessible access to the area and a retrofit of the ground floor washroom.. This proposal also includes the revamping of five (5) accessible parking spots., There are five (5) accessible spots existing on the property.

    Applied Dec 23, 2010 · issued Jan 11, 2011 · completed Jun 8, 2026 · Permit 10 319763 HVA

    Closed (dormant)
  • Heating and ventilation

    HVAC - Make interior alterations to lobby & superintendant office.

    Applied May 1, 2007 · issued May 7, 2007 · completed Jun 8, 2026 · Permit 07 184890 HVA

    Closed (dormant)
  • Residential building permit · Alteration to existing building

    repair 130 balconies--work being done at 295 shuter st. --conv. address

    Applied Aug 21, 2000 · issued Nov 15, 2000 · Permit 00 329947 CMB

    Inspections under way
  • Heating and ventilation · Install/Alter HVAC - only

    heating system upgrade, retrofit. replace hot water piping and radiators throughout building. ( conv. address is 285 Shuter St)fees based on flat rate of $250.00 plus $60.00 per hour.

    Applied Feb 1, 2000 · issued May 11, 2000 · completed Jun 8, 2026 · Permit 00 124806 HVA

    Closed (dormant)
  • Fire and security upgrade · Unknown

    Carry out remedial work to comply with retrofit provisions of the fire code. (application is for 275, 285 and 295 shuter street) cost of construction $108,500.00 - fees collected under 390977 edc/db mr. Peter au is familiar. Edc

    Applied Oct 7, 1996 · issued Oct 18, 1996 · Permit 96 021548 FSU

    Inspections under way
  • Fire and security upgrade · Unknown

    Carry out remedial work to comply with the retrofit provisions of the fire code. Edc (application is for 275, 285 and 295 shuter street)

    Applied Sep 10, 1996 · issued Oct 1, 1996 · Permit 96 020539 FSU

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 285 Shuter St · Minor variance

    110 m away · filed May 22, 2026 · Postponed

  • 244 Queen St E · Minor variance

    To alter the existing three-storey mixed-use building by constructing a rear one-storey addition with a basement to expand commercial units and to provide a new internal connection on the ground floor between the main building and the rear ancillary building on the lot, abutting the laneway. Also, to construct a new rooftop deck above the one-storey addition with access via staircases to the rear laneway, rear second level, and third storey with a balcony. Further, to convert the existing three-storey mixed-use building and rear two-storey ancillary building into a commercial development. The…

    110 m away · filed Jul 2, 2025 · Approved

  • 150 Sherbourne St · Minor variance

    To construct a new four-storey detached building (community recreation centre).

    210 m away · filed Jun 6, 2024 · Approved

  • 261 Queen St E · Minor variance

    To alter part of a mixed-use development (Buildings B and C) comprised of two apartment towers (total of 795 residential units), 6,997 m² of retail space, 7,715 m² of office space, and a 1400 m² public park, approved under Site Specific By-laws 226-2023(OLT) and 227-2023(OLT), by converting approximately 7,715 m² of office area within Building C into 64 residential units (of which 21 of the units will be Live-Work units). Also, by permitting and altering the type of personal service shop uses within dwelling units, permitting a home occupation to be located within a dwelling unit in Building…

    130 m away · filed Mar 13, 2024 · Approved

  • 348 Richmond St E · Minor variance

    To alter the development standards, as approved under Site Specific Zoning By-Law 227-2023 (amended By-Law 569-2013), for the 25-storey mixed-use apartment building (Building A), by increasing the residential gross floor area, and reducing the number of vehicular parking spaces. A hotel use will not be contained within this building (Building A).

    220 m away · filed Oct 13, 2023 · Approved

  • 236 Queen St E · Minor variance

    To alter the existing three-storey, mixed-use building by constructing rear second and third storey additions with a rear third storey balcony. The altered building will contain a total of four dwelling units.

    120 m away · filed Oct 3, 2023 · Approved

  • 305 Queen St E · Consent

    To obtain consent to create an easement/right-of-way in favour of 132 Berkeley Street.

    150 m away · filed Apr 11, 2022 · Approved

  • 315 Queen St E · Consent

    To obtain consent to create an easement/right-of-way in favour of 132 Berkeley Street.

    170 m away · filed Apr 11, 2022 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.