Toronto address · Ward 19, Beaches-East York
276 King Edward Ave
The City of Toronto has 3 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Interior alterations
Rev01- proposal for roof top deck above garage and to reduce number of units from 4 to 3Proposal for interior alterations to an existing 4 unit dwelling.
Applied Jul 28, 2016 · issued Aug 23, 2016 · completed Oct 27, 2017 · Permit 15 133907 BLD (revision 01)
- Closed
Plumbing
Plumbing - Proposal for interior alterations to an existing 4 unit dwelling.
Applied Mar 30, 2015 · issued Jun 4, 2015 · completed Oct 27, 2017 · Permit 15 133907 PLB
- Closed
Small residential project · Interior alterations
Proposal for interior alterations to an existing 4 unit dwelling.
Applied Mar 30, 2015 · issued Jun 4, 2015 · completed Oct 27, 2017 · Permit 15 133907 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
321 Gledhill Ave · Minor variance
110 m away · filed Sep 8, 2026 · Postponed
254 Coleridge Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear cantilevered second storey addition. The existing enclosed front porch, and the rear one-storey ancillary building (shed) will be maintained and unaltered.
220 m away · filed Mar 18, 2026 · Approved
244 Virginia Ave · Minor variance
To construct a new three-storey detached residential building (containing six residential dwelling units), with three partially covered front porches with stairs (entrances to units 1, 3, and 5), three partially covered rear decks with stairs (for units 1, 3, and 5), two rear second floor bay windows (for units 3 and 5), three third floor front rooftop decks (above the second floor, for units 1, 3, and 5), and three rear basement walkouts (for units 2, 4, and 6). Also, to construct a new front (east) driveway with two parking spaces (accessed from Virginia Avenue). The existing front driveway…
150 m away · filed Oct 28, 2025 · Approved
215 King Edward Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition with a second storey balcony.
180 m away · filed Oct 6, 2025 · Approved
250 Lumsden Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a front second floor addition with a terrace, and a rear two-storey addition.
240 m away · filed Aug 7, 2025 · Approved
272 Gledhill Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a front ground floor deck, and a rear two-storey addition with deck. To construct a new one-storey ancillary building (detached garage in the rear yard) with driveway, abutting Barker Avenue.
120 m away · filed Apr 3, 2025 · Approved
52 Everett Cres · Minor variance
To permit the two-storey detached dwelling with a rear two-storey and a rear ground floor deck, which was constructed beyond the limits of the authorized building permit.
240 m away · filed May 17, 2023 · Approved
186 Holborne Ave · Minor variance
To convert the existing one-storey detached dwelling from one unit into two units (one primary suite located on the first and second storey, and one secondary suite located in the basement), by constructing a complete second storey addition, a rear two-storey addition, a rear basement walkout, a rear ground floor deck, a front integral garage, a front covered porch, and front ground and second floor bay windows.
170 m away · filed Apr 13, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.