Toronto address · Ward 13, Toronto Centre
28 St Paul St
The City of Toronto has 3 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Proposed interior sanitary 4" clay to 4" PVC & sump pump installation.
Applied Nov 12, 2025 · issued Nov 18, 2025 · completed Nov 27, 2025 · Permit 25 252732 DRN
- Inspections under way
Small residential project · Garage
Proposal for a new 28.7 M2 timberframed garage on concrete slab, off laneway
Applied Apr 24, 2024 · issued Jun 13, 2024 · Permit 24 139988 BLD
- Closed
Small residential project · Multiple projects
Proposal to replace the 3rd floor roof deck and ceiling of the 2nd floor due to water damage in the existing single family dwelling.
Applied Apr 10, 2018 · issued Apr 19, 2018 · completed Jan 17, 2019 · Permit 18 141241 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
15 storeys · 151 homes · Residential
130 m away · Condominium · Under review · filed Nov 8, 2021
- Under review
1-16 Sumach Street and 90 Eastern Avenue
55 storeys · 1,284 homes · Mixed use
200 m away · Site plan · Under review · filed Oct 21, 2025
- Submitted
20 storeys · 297 homes · Residential
240 m away · Site plan · Submitted · filed Apr 16, 2026
- Approved
80-94 Power Street, 351-373 Queen Street East and 161-167 Parliament Street
28 storeys · 526 homes · Mixed use
270 m away · Site plan · Approved · filed Jun 28, 2021
- Under appeal
130-134 Parliament Street and 529 Richmond Street East
46 storeys · 419 homes · Mixed use
360 m away · Site plan · Under appeal · filed Aug 14, 2023
- Under review
494-526 Richmond Street East and 156-162 Parliament Street
588 homes · Residential
370 m away · Site plan · Under review · filed Jul 12, 2023
Neighbours’ Committee of Adjustment files within 250 m
4 Gilead Pl · Minor variance
The existing one-storey and two-storey commercial buildings (retail and daycare) will be maintained and unaltered.
240 m away · filed Apr 2, 2026 · Approved
4 Gilead Pl · Consent
To obtain consent to sever the property into three lots, and to maintain the existing easement/right-of-way.
240 m away · filed Apr 2, 2026 · Approved
4 Gilead Pl · Minor variance
The existing undersized public parking lot will be maintained and unaltered.
240 m away · filed Apr 2, 2026 · Approved
498 Queen St E · Minor variance
To legalize and to maintain the conversion of a rooming house into eight residential dwelling units, within this lawfully existing building.
180 m away · filed Mar 7, 2025 · Deferred
90 Sumach St · Minor variance
To construct a new rooftop stair enclosure (vestibule and storage area) for Unit 701, within this existing seven-storey detached building. The existing private rooftop elevator enclosure will be demolished.
190 m away · filed Sep 27, 2024 · Approved
29 Sackville St · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a partial rooftop structure (pergola and wood deck above the existing flat roof dwelling), attached to the enclosed stair enclosure.
170 m away · filed Jun 6, 2024 · Approved
90 Sumach St · Minor variance
To alter the existing seven-storey apartment building by constructing a new third storey rooftop deck (for Unit 319), to be located on the roof above the existing parking garage, on the north side of the building. There will be a partition fence on the rooftop deck.
190 m away · filed Jan 5, 2024 · Refused
90 Sumach St · Minor variance
To legalize and to maintain the residential rooftop terrace enclosure (unit 702 in the seven-storey mixed-use building) which was constructed without an authorized building permit.
190 m away · filed Nov 29, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.