Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

28 Teignmouth Ave

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Proposal for Backwater Valve.

    Applied Mar 28, 2022 · issued Mar 29, 2022 · completed Apr 4, 2022 · Permit 22 127741 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 56 Bloem Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a complete second storey addition (cantilevered at the front), and a rear one-storey addition (mudroom to replace the existing rear ground floor concrete deck). Also, to reconstruct the front porch stairs.

    220 m away · filed Mar 26, 2026 · Approved

  • 113 Hatherley Rd · Minor variance

    To construct a new two-storey detached ancillary building containing one laneway suite (the second storey will be cantilevered), with a side (west) covered entrance, and a rear (south) carport for oneparking space. There will be a total of five residential dwelling units on this lot (four units within the main building and one unit within the ancillary building).

    200 m away · filed Sep 30, 2025 · Approved

  • 282 Earlscourt Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front ground floor addition (partial porch enclosure) with reconstructed stairs, and a front second floor deck (above the front ground floor addition).

    50 m away · filed Jun 19, 2024 · Approved

  • 164 Day Ave · Minor variance

    To permit the existing one-storey detached dwelling by converting the enclosed front porch into habitable space, and to construct a new covered front porch and stairs.

    250 m away · filed May 27, 2024 · Approved

  • 113 Hatherley Rd · Minor variance

    To alter the existing one-and-one-half-storey detached dwelling by constructing first and second storey front and rear additions, a complete third storey addition, a rear ground floor covered deck and basement walkout, and second and third floor front balconies and rear decks. This dwelling will have a total of two units (one primary unit and one secondary suite).

    200 m away · filed Oct 11, 2022 · Approved

  • 341 Boon Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a front one-storey addition, a complete second storey addition, a new front walkway and stairs, and a new walkway in the rear yard.

    160 m away · filed Apr 11, 2022 · Approved

  • 93 Hatherley Rd · Minor variance

    To convert the existing one-storey detached dwelling from one unit into two units by constructing: a new front covered porch, a second and third storey additions with rear second and third storey balconies, and a rear ground floor deck.

    170 m away · filed Feb 14, 2022 · Approved

  • 146 Morrison Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear second storey addition and a rear ground floor deck.

    240 m away · filed Aug 19, 2021 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.