Toronto address · Ward 19, Beaches-East York
28 Victoria Park Ave
The City of Toronto has 6 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revocation pending
Plumbing
Plumbing - Proposed basement Underpinning (21.5m), New Door,Interior Bearing wall removal and drains
Applied Sep 17, 2020 · issued Nov 17, 2020 · Permit 20 195007 PLB
- Inspections under way
Small residential project · Multiple projects
Proposed basement Underpinning (21.5m), New Door,Interior Bearing wall removal and drains
Applied Sep 17, 2020 · issued Nov 17, 2020 · Permit 20 195007 BLD
- Closed
Drains and site services
Drain - Proposed basement Underpinning (21.5m), New Door,Interior Bearing wall removal and drains
Applied Sep 17, 2020 · issued Nov 17, 2020 · completed Jul 8, 2025 · Permit 20 195007 DRN
- Closed
Plumbing
Plumbing - +/- 60 SQ.M. INTERIOR ALTERATIONS, NEW FIREPLACE (SOLID FUEL) AND CHIMNEY BUMP OUT. CHANGES TO REAR WALL. SHEAR WALL
Applied Feb 5, 2020 · issued Feb 20, 2020 · completed Jul 15, 2020 · Permit 20 112385 PLB
- Closed
Small residential project · Multiple projects
+/- 60 sq.m. Interior alterations, new fireplace (solid fuel) and chimney bump out. Changes to rear wall. Shear wall
Applied Feb 5, 2020 · issued Feb 20, 2020 · completed Jul 15, 2020 · Permit 20 112385 BLD
- Closed
Drains and site services · Back water valve (Sewer only)
back water valve
Applied Feb 3, 2020 · issued Feb 3, 2020 · completed Jul 15, 2020 · Permit 20 111431 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
52 Blantyre Ave · Minor variance
To alter the existing three storey detached dwelling by constructing interior and exterior alterations to the basement, first storey, second storey, and third storey. Also, construction of a balcony on the rear of the second storey, a balcony on the rear of the third storey, and alterations to the rear basement walkout. A one-storey garden shed and a swimming pool will also be constructed in the rear yard.
170 m away · filed Sep 23, 2025 · Approved
49 Victoria Park Ave · Minor variance
To alter the existing two-and-one-half-storey dwelling by constructing a one-storey addition at the rear of the dwelling. The existing deck at the rear will be demolished. NOTE: This application was previously deferred at the Committee of Adjustment Hearing on November 3, 2025.
110 m away · filed Sep 18, 2025 · Approved
171 Neville Park Blvd · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear second floor addition, and a rear ground floor deck with stairs. Also, to install a front yard parking pad.
220 m away · filed Sep 24, 2024 · Approved
48 Victoria Park Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a partial side (north) one-storey addition, and a rear ground floor deck extension.
80 m away · filed Jul 23, 2024 · Approved
87 Neville Park Blvd · Consent
To obtain consent to create an easement/right-of-way.
150 m away · filed May 25, 2022 · Approved
44 Nursewood Rd · Minor variance
To construct a new three-storey detached dwelling with a front integral garage, a rear basement walkout, and rear second and third storey balconies.
240 m away · filed Mar 19, 2022 · Approved
44 Nursewood Rd · Minor variance
To construct a new three-storey detached dwelling with an integral garage,
240 m away · filed Nov 16, 2021 · Refused
166 Neville Park Blvd · Minor variance
To construct a four-storey detached house with an integral garage and front porch.
230 m away · filed Dec 22, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.