The City of Toronto has 4 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Install a back water valve to existing dwelling
Applied Oct 10, 2024 · issued Oct 15, 2024 · completed Oct 31, 2024 · Permit 24 224593 DRN
- Permit issued
Small residential project · Party wall admin permits
Proposal for party wall permit - (See 24 209789 - 26 Westminster Ave)
Applied Sep 9, 2024 · issued Sep 19, 2024 · Permit 24 209803 BLD
- Closed
Small residential project · Party wall admin permits
Admin folder to #26 Westminister Ave 14 -
Applied Dec 23, 2014 · issued Dec 24, 2014 · completed Feb 23, 2023 · Permit 14 267230 BLD
- Closed
Plumbing · Fixtures/Roof Drains: SFD
Replacing fixtures in BSMT, as per Inspectors request.PLB only, Inspector to confirm if Drain Permit necessary.
Applied Apr 5, 2006 · issued Apr 5, 2006 · completed Feb 18, 2026 · Permit 06 123538 PSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
46 Fermanagh Ave · Minor variance
120 m away · filed Sep 24, 2026 · Accepted
44 Fermanagh Ave · Minor variance
120 m away · filed Sep 24, 2026 · Accepted
112 Wright Ave · Minor variance
To alter the existing three-storey semi-detached dwelling by increasing the building height of the front third storey with a new sloped roof. Also, to construct a rear two-storey addition (including basement) with a ground floor deck and stairs, and a rear vehicular parking space, abutting the laneway.
200 m away · filed Sep 8, 2026 · Tentatively scheduled
40 Wabash Ave · Minor variance
To construct a new four-storey detached building (Wabash Community Recreation Centre) with a west side attached outdoor activity space, a canopy over the west side main entrance, and solar roof panels on rear third floor and roof level. There will be a total of 10 surface parking spaces (including three accessible parking spaces), on the west side main entrance, accessed from Wabash Avenue. A related Site Plan Control application (File No. 24 180616 STE 04 SA) is currently under review and consideration.
240 m away · filed Jul 8, 2026 · Hearing scheduled
93 Wright Ave · Minor variance
To legalize and to maintain the existing rear third floor addition, and rear third floor deck, which were constructed without an authorized building permit. Also, to permit the existing front one-storey addition (porch enclosure into habitable space), which was constructed beyond the limits of an authorized building permit. There will be one residential dwelling unit on this lot.
240 m away · filed Mar 19, 2026 · Approved
43 Grenadier Rd · Minor variance
To construct a new one-storey detached ancillary building (a one-car garage with storage space) in the rear yard, abutting the laneway.
170 m away · filed Jan 5, 2026 · Approved
229 Sorauren Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a complete third floor addition, a front porch with stairs, a front basement walkout, and a rear third floor terrace. There will be a secondary suite within the basement.
230 m away · filed Sep 4, 2025 · Approved
23 Westminster Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a partial front second storey addition, a rear one-storey addition, a partial rear second storey addition, a rear second storey rooftop balcony (above the rear one-storey addition), a rear third storey rooftop egress balcony (above the rear second-storey addition), a front porch extension, a rear ground floor deck, and a rear basement walkout.
40 m away · filed Jul 15, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.