Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

280 Wellesley St E

The City of Toronto has 5 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Garage Repair/Reconstruction

    Proposed garage slab repalcement

    Applied Jan 9, 2025 · issued Feb 5, 2025 · Permit 25 102606 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - new fire dampers at new wall surrounding existing ductsFIRE DAMAGE: INTERIOR REPAIRS TO FIRE DAMAGED FINISH COMPONENTS OF THE 23RD LEVEL LANDING AT THE WEST STAIRCASE SHAFT AND THE MID-LANDING BETWEEN 29TH AND 30TH LEVEL OF THE NORTH STAIRCASE. SMOKE & SOOT MIGRATION REMEDIATION IN SELECT SHAFTS BEHIND THE PARTITION WALLS INCLUDING ABOVE THE DROPPED FALSE CEILING IN THE CORRIDORS.

    Applied May 14, 2021 · issued Jun 18, 2021 · completed Oct 23, 2025 · Permit 21 118128 HVA

    Closed
  • Addition or alteration · Interior alterations

    Fire damage: interior repairs to fire damaged finish components of the 23rd level landing at the west staircase shaft and the mid-landing between 29th and 30th level of the north staircase. Smoke & soot migration remediation in select shafts behind the partition walls including above the dropped false ceiling in the corridors.

    Applied Feb 19, 2021 · issued Mar 1, 2021 · Permit 21 118128 BLD

    Inspections under way
  • Addition or alteration · Other

    To reconstruct the existing below grade hydro vault.

    Applied Jan 9, 2014 · issued Feb 4, 2014 · Permit 14 102749 BLD

    Inspections under way
  • Addition or alteration · Balcony/Guard repairs

    Replacement of balcony railings for the North Portion of the apartment building. Phase 1 of Building 13.

    Applied Mar 17, 2010 · issued Apr 12, 2010 · Permit 10 133837 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 603 1/2 Parliament St · Minor variance

    To legalize and to maintain the existing three-storey non-residential building, which was converted from a residential building, without an authorized building permit. The existing non-residential use (law office) will be maintained.

    110 m away · filed Jul 18, 2024 · Approved

  • 41 Rose Ave · Consent

    To obtain consent for a technical severance to re-establish two residential lots which merged on title.

    120 m away · filed Dec 22, 2022 · Approved

  • 340 Wellesley St E · Minor variance

    To alter the existing three-storey townhouse dwelling by constructing a two-storey rear addition, a rear ground floor deck, a rear stepped window well, and a front basement walkout.

    230 m away · filed Nov 21, 2022 · Approved

  • 18 Laurier Ave · Minor variance

    To alter the existing two-and-one-half-storey townhouse by constructing a rear third storey addition (dormer) with a rear third storey deck.

    170 m away · filed Aug 11, 2021 · Approved

  • 8 Amelia St · Minor variance

    To alter the existing two-storey mixed-use building by constructing a complete third storey addition.

    160 m away · filed Aug 6, 2021 · Approved

  • 19 Amelia St · Minor variance

    To remove the detached garage in the rear yard of the existing one-storey detached dwelling.

    220 m away · filed May 11, 2021 · Approved

  • 600 Parliament St · Minor variance

    To construct new rear exterior stairs and add the use "Rooming House".

    40 m away · filed Feb 24, 2021 · Approved

  • 8 Amelia St · Minor variance

    To alter the existing two-storey mixed-use building by constructing a second-storey addition.

    160 m away · filed Mar 12, 2020 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.