Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

283 Lansdowne Ave

The City of Toronto has 1 building permit since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Addition(s)

    Proposal to enclose front porch on existing Single Family Dwelling

    Applied Mar 2, 2022 · issued Apr 1, 2022 · completed Oct 19, 2022 · Permit 22 118761 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To enclose the front porch of the existing two-storey row house.

    Decision: Approved (hearing Oct 20, 2021)

    Filed Jul 9, 2021 · File A0915/21TEY

    Closed

What’s planned nearby

Development sites within 500 m

  • 1280 College Street

    9 storeys · Residential

    170 m away · Rezoning · Approved · filed Jun 16, 2026

    Approved
  • 1280-1286 College Street

    9 storeys · Residential

    170 m away · Rezoning · Approved · filed Mar 23, 2026

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 3 Lumbervale Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition (above the existing first floor addition), and a rear basement walkout.

    180 m away · filed May 1, 2026 · Approved

  • 94 St Clarens Ave · Minor variance

    To construct a new two-storey ancillary building (including a basement walkout with one laneway suite), in the rear yard, abutting the laneway. The second storey will be cantilevered on the south side.

    110 m away · filed Jun 30, 2025 · Refused

  • 163 St Clarens Ave · Minor variance

    To construct a new three-storey detached dwelling (fourplex) with a front ground floor landing with stairs, a side (north) ground floor walkout, two rear ground floor landings with stairs and two third floor side (north) terraces (Unit A and Unit C). Also, to construct a new two-storey laneway suite in the rear yard with a front (west) second floor terrace. There will be a total of five dwelling units on the lot (four units within the main dwelling and one unit within the laneway suite). The existing rear detached garage will be demolished.

    190 m away · filed May 13, 2025 · Approved

  • 66 St Clarens Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a front deck. Also, to construct rear one and three-storey additions with a ground level deck and stairs.

    170 m away · filed Jan 13, 2025 · Approved

  • 27 Northern Pl · Minor variance

    To alter the existing two-storey semi-detached townhouse dwelling by constructing a complete third storey addition.

    250 m away · filed Jun 15, 2023 · Approved

  • 1744 Dundas St W · Minor variance

    To construct a new seven-storey mixed-use building (containing 1 commercial unit and 18 residential units). There will be front (south), side (west), and rear (north) terraces on the fifth and sixth storeys, as well as, a seventh storey rooftop terrace.

    70 m away · filed Feb 8, 2023 · Approved

  • 227 Lansdowne Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a one-storey rear addition and a rear ground floor deck.

    170 m away · filed Aug 18, 2022 · Approved

  • 149 St Clarens Ave · Minor variance

    To alter the existing two-storey dwelling by constructing a complete third storey addition with a front balcony, and new front porch stairs (reducing the existing planter for wider steps).

    150 m away · filed Jun 10, 2022 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.