Toronto address · Ward 14, Toronto-Danforth
287 Booth Ave
The City of Toronto has 9 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
Plumbing - Proposal for basement walkout, new deck in the rear yard and sump pump.
Applied Sep 2, 2025 · issued Sep 12, 2025 · completed Jun 23, 2026 · Permit 25 219117 PLB
- Closed
Small residential project · Multiple projects
Proposal for basement walkout, new deck in the rear yard and sump pump.
Applied Sep 2, 2025 · issued Sep 12, 2025 · completed Jun 23, 2026 · Permit 25 219117 BLD
- Closed
Drains and site services
Drain - Proposal for basement walkout, new deck in the rear yard and sump pump.
Applied Sep 2, 2025 · issued Sep 12, 2025 · completed Jun 19, 2026 · Permit 25 219117 DRN
- Cancelled
Plumbing
Plumbing - Proposal for basement walkout with new sump and rear yard deck
Applied Aug 26, 2025 · completed Aug 29, 2025 · Permit 25 216378 PLB
- Cancelled
Small residential project · Multiple projects
Proposal for basement walkout with new sump and rear yard deck
Applied Aug 26, 2025 · completed Aug 29, 2025 · Permit 25 216378 BLD
- Cancelled
Drains and site services
Drain - Proposal for basement walkout with new sump and rear yard deck
Applied Aug 26, 2025 · completed Aug 29, 2025 · Permit 25 216378 DRN
- Cancelled
Plumbing
Plumbing - Proposal for basement walkout with new sump and rear yard deck
Applied Aug 18, 2025 · completed Aug 21, 2025 · Permit 25 211823 PLB
- Cancelled
Drains and site services
Drain - Proposal for basement walkout with new sump and rear yard deck
Applied Aug 18, 2025 · completed Aug 21, 2025 · Permit 25 211823 DRN
- Cancelled
Small residential project · Multiple projects
Proposal for basement walkout with new sump and rear yard deck
Applied Aug 18, 2025 · completed Aug 21, 2025 · Permit 25 211823 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
9 storeys · 78 homes · Mixed use
390 m away · Site plan · Approved · filed May 3, 2023
- Approved
6 storeys · 15 homes · Mixed use
430 m away · Site plan · Approved · filed Apr 28, 2023
Neighbours’ Committee of Adjustment files within 250 m
307 Logan Ave · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing a rear one-storey addition with a deck, and a rear second storey deck partially on the roof of the new one-storey addition.
130 m away · filed Apr 22, 2024 · Approved
1000 Dundas St E · Minor variance
To alter the existing two-and-a-half storey townhouse by constructing a front third storey addition.
240 m away · filed Sep 15, 2023 · Approved
42 Natalie Pl · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing a rear one-storey addition, with a rear ground floor deck, and a rear second storey rooftop deck.
130 m away · filed Mar 1, 2023 · Approved
290 Logan Ave · Minor variance
To alter the existing two-storey rowhouse end unit by constructing a third-storey addition with a front third-floor deck.
140 m away · filed Apr 13, 2022 · Approved
309 Logan Ave · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing a rear third storey addition.
130 m away · filed Sep 15, 2021 · Approved
43 Colgate Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a rooftop deck above, a complete third storey addition, and a rear ground floor deck.
210 m away · filed Sep 13, 2021 · Approved
31 Cummings St · Minor variance
To construct a new three-storey detached dwelling with a rear basement walkout, a rear deck, a front AC unit, and a rear third storey deck.
180 m away · filed Jul 30, 2021 · Approved
69 De Grassi St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a third storey addition and altering the interior of the second floor.
200 m away · filed Mar 19, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.