Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

287 Forest Hill Rd

The City of Toronto has 1 building permit since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Addition(s)

    Proposed 1-storey addition to enclose the existing courtyard in the Front Yard of the Existing Single Family Dwelling Detached House.

    Applied Aug 27, 2019 · issued Sep 16, 2019 · completed Aug 10, 2020 · Permit 19 212310 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To enclose the existing front courtyard of a two-storey detached dwelling.

    Decision: Approved (hearing Nov 21, 2018)

    Filed Jul 20, 2018 · File A0703/18TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 649 Spadina Rd · Consent

    To obtain consent to sever the property into two residential lots.

    200 m away · filed Jun 12, 2025 · Approved

  • 649 Spadina Rd · Minor variance

    To construct a new three-storey detached dwelling with an integral garage, a front porch with stairs, a front third storey balcony, a rear ground floor deck with stairs, a rear second storey balcony, and an in-ground swimming pool.

    200 m away · filed Jun 12, 2025 · Approved

  • 649 Spadina Rd · Minor variance

    To construct a new three-storey detached dwelling with a rear ground floor deck with stairs, a front porch, a rear second storey balcony, and a front third storey balcony.

    200 m away · filed Jun 12, 2025 · Approved

  • 301 Chaplin Cres · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition and a rear ground level deck with stairs.

    200 m away · filed Feb 7, 2025 · Approved

  • 263 Forest Hill Rd · Minor variance

    To construct a new three-storey detached dwelling with an integral garage on the upper basement level (accessed by a car lift), an indoor pool on the lower basement level, rear basement walkouts on the upper and lower basement levels, and a rear ground floor deck.

    120 m away · filed Jul 24, 2024 · Approved

  • 12 Ormsby Cres · Minor variance

    To construct a new three-storey detached dwelling with an integral garage, a front porch with a canopy above, a rear ground floor covered terrace with stairs (covered outdoor room), a rear third floor balcony, and a rear yard in-ground swimming pool and hot tub.

    120 m away · filed Apr 19, 2024 · Approved

  • 253 Dunvegan Rd · Minor variance

    To construct a new three-storey detached dwelling with a covered front porch, a front integral garage ramp (which will lead to parking spaces within the basement), a rear yard outdoor room/terrace, a rear second storey balcony, and a west side third storey balcony. Also, to construct a front yard water feature, a rear in-ground swimming pool, and a one-storey ancillary building (cabana).

    120 m away · filed Mar 7, 2024 · Approved

  • 257 Dunvegan Rd · Minor variance

    To construct a new three-storey detached dwelling with a front integral garage, a front covered porch, a rear second storey julliette balcony, and a rear third storey balcony. Also, to construct a new one-storey ancillary building (cabana), and an in-ground swimming pool, in the rear yard.

    140 m away · filed Mar 4, 2024 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.