Toronto address · Ward 12, Toronto-St. Paul's
287 Macpherson Ave
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing · Backflow prevention devices (Water only)
Install a 1" premise isolation backflow prevention device.
Applied Aug 15, 2016 · issued Sep 12, 2016 · completed Nov 8, 2021 · Permit 16 207226 PSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
9 storeys · 23 homes · Residential
280 m away · Condominium · Under review · filed Oct 28, 2021
- Approved
- Approved
141-145 Bedford Road and 287 Davenport Road
13 storeys · 63 homes · Mixed use
370 m away · Site plan · Approved · filed Dec 14, 2021
- Under review
220-234 Davenport Road and 148-158 Avenue Road
38 storeys · 110 homes · Mixed use
410 m away · Site plan · Under review · filed Jul 2, 2021
- Under review
183-189 Avenue Road and 109-111 Pears Avenue
11 storeys · 18 homes · Mixed use
420 m away · Site plan · Under review · filed Oct 25, 2021
- Under appeal
18 storeys · 121 homes · Residential
440 m away · Rezoning · Under appeal · filed Jan 8, 2025
Neighbours’ Committee of Adjustment files within 250 m
21 Dupont St · Minor variance
To permit and to maintain the existing conversion of the rear two-car integral garage of the existing two-and-one-half-storey semi-detached dwelling into a one-car garage with a separate habitable space (kitchen extension). Also, to permit and to maintain the existing rear ground floor covered (awning) deck with stairs and the rear ancillary building (shed). Also, to reconstruct the existing rear second storey roof deck above the garage and the existing third storey roof deck.
240 m away · filed Dec 3, 2025 · Approved
247 Bedford Rd · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a rear third floor balcony.
130 m away · filed Oct 1, 2025 · Approved
249 Bedford Rd · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a rear third floor balcony.
120 m away · filed Oct 1, 2025 · Approved
115 Dupont St · Minor variance
To construct a new three-and-one-half-storey semi-detached dwelling with an integral garage (three-car garage), an office space on the ground floor, a rear third storey balcony, and a front rooftop patio (which will be accessed from the mezzanine floor).This is currently being reviewed under Site Plan Control (File 15 268295 STE 20 SA).
150 m away · filed Sep 24, 2025 · Postponed
19 Mc Master Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by reconstructing the front covered porch and stairs.
210 m away · filed May 10, 2024 · Approved
115 Dupont St · Minor variance
To alter the five-storey office building, abutting the laneway, approved in OMB Decision MM160069 (Case No. PL170944) by reducing the height of the first storey.
150 m away · filed Sep 12, 2023 · Approved
225 Cottingham St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear basement addition that will be below a ground floor deck. This deck already has an authorized building permit.
200 m away · filed Jun 9, 2023 · Approved
254 Cottingham St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a one-storey rear addition with a basement, a third floor side dormer and a new second storey deck over the one-storey addition. Also, to construct a rear ground floor patio and a basement level patio in the front yard. The existing one-storey rear addition will be demolished.
240 m away · filed May 9, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.