The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
Plumbing - Proposal to construct third storey addition.
Applied Dec 7, 2023 · issued Dec 20, 2023 · completed May 14, 2024 · Permit 23 233535 PLB
- Closed
Small residential project · Addition(s)
Proposal to construct third storey addition.
Applied Dec 7, 2023 · issued Dec 20, 2023 · completed Jun 5, 2024 · Permit 23 233535 BLD
- Closed
Plumbing
Plumbing - Interior Alteration
Applied Jul 28, 2023 · issued Nov 20, 2023 · completed May 14, 2024 · Permit 23 181314 PLB
- Closed
Small residential project · Second suite (New)
Interior Alteration
Applied Jul 28, 2023 · issued Nov 20, 2023 · completed May 14, 2024 · Permit 23 181314 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Approved with conditions
Minor variance · R addition
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a partial front second storey addition, partial front and rear third storey additions (with front second and third storey juliette balconies), and a rear third storey balcony.
Decision: Approved (hearing Oct 25, 2023)
Filed Aug 16, 2023 · File A0720/23TEY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
260 Bain Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a third storey side (west) roof deck. The rear ground floor one-storey addition has been demolished and a new rear ground floor deck with stairs and as well as a rear basement walkout has already been constructed under approved Building Permit No. 24 172386 BLD 02 SR.
220 m away · filed May 23, 2025 · Approved
255 Bain Ave · Minor variance
To construct a new three-storey detached dwelling with a front porch, a third storey terrace (above the second floor at the southwest portion of the dwelling), and a rear ground floor deck. Also, to construct a new one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.
230 m away · filed Dec 27, 2024 · Approved
301 Riverdale Ave · Minor variance
To legalize and to maintain the rear second floor addition, of the existing two-storey semi-detached dwelling, which was constructed beyond the limits of the authorized building permit.
100 m away · filed Nov 5, 2024 · Approved
10 Poucher St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition.
230 m away · filed Jul 26, 2024 · Approved
76 Dingwall Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a partial rear third storey addition.
230 m away · filed Mar 28, 2023 · Approved
515 Pape Ave · Minor variance
To alter the existing one-storey ancillary building by constructing a complete second storey with a roof terrace. This building will be converted into a garden suite.
200 m away · filed Jan 17, 2023 · Approved
42 Dingwall Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition.
220 m away · filed Dec 1, 2022 · Approved
519 Pape Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a rear third storey juliette balcony, and a front basement walkout. Also, to construct one secondary suite within the basement. The existing rear second storey deck will be maintained and unaltered.
230 m away · filed Sep 13, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.