2899 Steeles Ave W
The City of Toronto has 7 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Not started
Heating and ventilation · Special ventilation system
Hvac permit for small kitchen venting
Applied Sep 24, 2026 · Permit 26 243388 MSA
- Inspections under way
Addition or alteration · Interior alterations
Interior alterations to existing repair garage, waxing and detailing of cars, oil lube and filter and tire changes with minor repairs, installation of hoist - Carmate
Applied Jun 27, 2018 · issued Aug 8, 2018 · Permit 18 185339 BLD
- Closed
Heating and ventilation
HVAC - Interior alterations to existing repair garage, waxing and detailing of cars, oil lube and filter and tire changes with minor repairs, installation of hoist - Carmate
Applied Jun 27, 2018 · issued Aug 17, 2018 · completed Jan 25, 2019 · Permit 18 185339 HVA
- Closed
Plumbing
Plumbing - Interior alterations to existing repair garage, waxing and detailing of cars, oil lube and filter and tire changes with minor repairs, installation of hoist - Carmate
Applied Jun 27, 2018 · issued Aug 17, 2018 · completed Jan 31, 2019 · Permit 18 185339 PLB
- Permit issued
Addition or alteration · Interior alterations
Installation of new sunken slab (18m2) on grade for new scissor lift installation.
Applied May 26, 2017 · issued Jun 14, 2017 · Permit 17 166689 BLD
- Permit issued
Plumbing
Plumbing - Installation of new sunken slab (18m2) on grade for new scissor lift installation.
Applied May 26, 2017 · issued Jun 22, 2017 · Permit 17 166689 PLB
- Closed
Plumbing · Backflow prevention devices (Water only)
Installation of Premise Isolation Backflow Preventer with Thermal Expansion to a existing Commercial Plaza
Applied Oct 8, 2015 · issued Jan 8, 2016 · completed Jul 21, 2025 · Permit 15 235040 PSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
None on file since 2017.
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.