Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

29 Colgate Ave

The City of Toronto has 2 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal to construct interior alterations in the basement and underpinning.

    Applied Aug 27, 2024 · issued Aug 27, 2024 · Permit 23 196296 PLB

    Inspections under way
  • Small residential project · Multiple projects

    Proposal to construct interior alterations in the basement and underpinning.

    Applied Aug 31, 2023 · issued Sep 7, 2023 · Permit 23 196296 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 929 Queen St E · Minor variance

    To alter the development standards for the 9-storey mixed-use building (35 m in height to the top of the mechanical penthouse) containing commercial uses on the ground and mezzanine floors with side (west) second-floor terraces and a side (east) rooftop amenity terrace (approved under Site Specific Zoning By-Law 291-2024), by increasing the metric height of the first, second, sixth, and eighth storeys (by 0.7 m, 2.45 m, 0.5 m, and 0.4 m respectively), with a maximum building height of 35 m to the top of the ninth storey (excluding the mechanical penthouse). Also, to increase the total gross f…

    240 m away · filed Apr 15, 2026 · Approved

  • 307 Logan Ave · Minor variance

    To alter the existing three-storey semi-detached dwelling by constructing a rear one-storey addition with a deck, and a rear second storey deck partially on the roof of the new one-storey addition.

    90 m away · filed Apr 22, 2024 · Approved

  • 42 Natalie Pl · Minor variance

    To alter the existing three-storey semi-detached dwelling by constructing a rear one-storey addition, with a rear ground floor deck, and a rear second storey rooftop deck.

    160 m away · filed Mar 1, 2023 · Approved

  • 163 Booth Ave · Minor variance

    To construct a new three-storey detached dwelling with a sunken front walkout, a rear lower courtyard, and a second storey rear deck. Also, to permit the construction of a two-storey ancillary building (laneway suite), currently under a separate building permit, in the rear yard, abutting the laneway.

    250 m away · filed Jul 8, 2022 · Approved

  • 290 Logan Ave · Minor variance

    To alter the existing two-storey rowhouse end unit by constructing a third-storey addition with a front third-floor deck.

    30 m away · filed Apr 13, 2022 · Approved

  • 213 Logan Ave · Minor variance

    To alter the existing two-storey townhouse by constructing a rear third storey addition.

    250 m away · filed Dec 24, 2021 · Approved

  • 309 Logan Ave · Minor variance

    To alter the existing three-storey semi-detached dwelling by constructing a rear third storey addition.

    90 m away · filed Sep 15, 2021 · Approved

  • 43 Colgate Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a rooftop deck above, a complete third storey addition, and a rear ground floor deck.

    80 m away · filed Sep 13, 2021 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.