Toronto address · Ward 19, Beaches-East York
29 Holborne Ave
The City of Toronto has 3 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Selected interior demolition with structural alterations to interior load - bearing elements.New interior fit out with revised plumbing fixtures as noted on plan. Addition of 1 window on the north facade.
Applied Nov 21, 2024 · issued Dec 3, 2024 · completed May 7, 2025 · Permit 24 148686 HVA
- Closed
Plumbing
Plumbing - Selected interior demolition with structural alterations to interior load - bearing elements.New interior fit out with revised plumbing fixtures as noted on plan. Addition of 1 window on the north facade.
Applied May 14, 2024 · issued May 24, 2024 · completed May 7, 2025 · Permit 24 148686 PLB
- Closed
Small residential project · Interior alterations
Selected interior demolition with structural alterations to interior load - bearing elements.New interior fit out with revised plumbing fixtures as noted on plan. Addition of 1 window on the north facade.
Applied May 14, 2024 · issued May 24, 2024 · completed May 7, 2025 · Permit 24 148686 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
23 Fairside Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a partial side (south) ground floor (mudroom) addition.
170 m away · filed May 20, 2026 · Approved
226 Glebemount Ave · Minor variance
To alter the existing two-storey detached dwelling (basement level is considered the first level) by constructing a two-storey addition along the south side wall and rear wall (including a basement extension), a complete third storey addition (with dormers), a front integral garage, a covered front porch with stairs, a rear first floor balcony, and a rear walkout basement. The existing rear one-storey ancillary building (detached garage) will be demolished.
250 m away · filed Jan 21, 2026 · Approved
8 Holborne Ave · Minor variance
To alter the existing three-storey detached dwelling by replacing the rear first level deck with a one-storey addition with a platform and stairs.
100 m away · filed Jan 21, 2026 · Approved
63 Barker Ave · Minor variance
To construct a new three-storey detached building (Place of Worship) with third storey front and rear walkout balconies.
200 m away · filed Mar 6, 2024 · Refused
47 Binswood Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear ground floor addition.
170 m away · filed Apr 20, 2023 · Approved
1 Fairside Ave · Minor variance
To construct a new two-storey detached dwelling with a covered front porch, two-storey front and rear balconies, rear ground floor deck, and a rear basement walkout with stairs.
240 m away · filed Apr 6, 2023 · Approved
688 Cosburn Ave · Minor variance
To construct a new three-storey semi-detached dwelling with rear first, second and third storey terraces, and a rear basement walkout on the retained lot. Also, a parking space will be located in the front yard.
220 m away · filed Jan 31, 2023 · Refused
688 Cosburn Ave · Minor variance
To construct a new three-storey semi-detached dwelling with rear first, second and third storey terraces, and a rear basement walkout on the conveyed lot. Also, a parking space will be located in the front yard.
220 m away · filed Jan 31, 2023 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.