Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

29 Lascelles Blvd

The City of Toronto has 13 building permits since 2017 (6 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposed construction of a new panelized women's washroom facility within the existing Davisville Carhouse building, including washroom facilities, change area, and lockers. The new facility will be constructed on site within the existing Materials and Procurement space, along the west side of the carhouse, along with associated architectural, structural, mechanical, and electrical works as required.

    Applied Aug 24, 2026 · Permit 26 224896 HVA

    Not started
  • Plumbing

    Plumbing - Proposed construction of a new panelized women's washroom facility within the existing Davisville Carhouse building, including washroom facilities, change area, and lockers. The new facility will be constructed on site within the existing Materials and Procurement space, along the west side of the carhouse, along with associated architectural, structural, mechanical, and electrical works as required.

    Applied Aug 24, 2026 · Permit 26 224896 PLB

    Not started
  • Addition or alteration · Addition(s)

    Proposed construction of a new panelized women's washroom facility within the existing Davisville Carhouse building, including washroom facilities, change area, and lockers. The new facility will be constructed on site within the existing Materials and Procurement space, along the west side of the carhouse, along with associated architectural, structural, mechanical, and electrical works as required.

    Applied Aug 24, 2026 · Permit 26 224896 BLD

    Not started
  • Drains and site services · Site service

    Addition of 44 m of underground sanitary pipe and one man hole to existing underground utilities to connect a temporay locker room washroom trailer.

    Applied May 26, 2022 · issued Jul 12, 2022 · completed Dec 6, 2022 · Permit 22 151772 STS

    Closed
  • Addition or alteration · Other

    Revision 01: rather than provide a full renovation of the basement washroom and locker facility in the basement of the Davisville Carhouse building, as per the original building permit, the proposed revision is focused on reinstating one set of washroom stall and one shower, with locker spaces similar to the original facility before demolition. All plumbing fixtures will be utilizing existing connections. Lighting, exhaust, and sprinklers have been adjusted to the revised layout.

    Applied Jun 7, 2021 · issued Jun 30, 2021 · completed Aug 9, 2022 · Permit 19 137146 BLD (revision 01)

    Closed
  • Heating and ventilation

    Revision 01: rather than provide a full renovation of the basement washroom and locker facility in the basement of the Davisville Carhouse building, as per the original building permit, the proposed revision is focused on reinstating one set of washroom stall and one shower, with locker spaces similar to the original facility before demolition. All plumbing fixtures will be utilizing existing connections. Lighting, exhaust, and sprinklers have been adjusted to the revised layout.

    Applied Jun 7, 2021 · issued Jul 7, 2021 · completed Aug 9, 2022 · Permit 19 137146 HVA (revision 01)

    Closed
  • Plumbing

    Revision 01: rather than provide a full renovation of the basement washroom and locker facility in the basement of the Davisville Carhouse building, as per the original building permit, the proposed revision is focused on reinstating one set of washroom stall and one shower, with locker spaces similar to the original facility before demolition. All plumbing fixtures will be utilizing existing connections. Lighting, exhaust, and sprinklers have been adjusted to the revised layout.

    Applied Jun 7, 2021 · issued Jul 7, 2021 · completed Aug 9, 2022 · Permit 19 137146 PLB (revision 01)

    Closed
  • Addition or alteration · Other

    Proposed interior alterations to expand the Woman's Locker Room and replacement of the existing DC Power Supply System for an existing Transit Station/subway car repair and storage.

    Applied Apr 8, 2019 · issued Oct 8, 2019 · completed Aug 9, 2022 · Permit 19 137146 BLD

    Closed
  • Plumbing

    Plumbing - Proposed interior alterations to expand the Woman's Locker Room and replacement of the existing DC Power Supply System for an existing Transit Station/subway car repair and storage.

    Applied Apr 8, 2019 · issued Oct 8, 2019 · completed Aug 9, 2022 · Permit 19 137146 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposed interior alterations to expand the Woman's Locker Room and replacement of the existing DC Power Supply System for an existing Transit Station/subway car repair and storage.

    Applied Apr 8, 2019 · issued Oct 8, 2019 · completed Aug 9, 2022 · Permit 19 137146 HVA

    Closed
  • Plumbing

    PERMIT FOR TRENCH DRAIN FOR EXISTING BUILDING PERMIT - Plumbing - Reconstruct Track 4 slab with new trench drain to Davisville Car House -Service Depot

    Applied Mar 2, 2009 · issued Mar 11, 2009 · Permit 08 162516 PLB

    Inspections under way
  • Addition or alteration · Other

    Reconstruct Track 4 slab with new trench drain to Davisville Car House -Service Depot

    Applied May 26, 2008 · issued Jun 2, 2008 · Permit 08 162516 BLD

    Permit issued
Show 1 more permit
  • Drains and site services · Site service

    Repair of fire main services

    Applied Apr 13, 2007 · issued Apr 24, 2007 · Permit 07 151802 STS

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 10 Lascelles Blvd · Minor variance

    To construct a new rear two-storey detached ancillary building (containing one garden suite) with basement below, and a side (east) covered porch. Also, to reconstruct the parking pad, abutting Lascelles Boulveard. There will be a total of four residential dwelling units on this lot (three units occupying the main dwelling, and one unit occupying the ancillary dwelling).

    180 m away · filed Feb 11, 2026 · Approved

  • 9 Colin Ave · Minor variance

    To permit the new two-storey detached dwelling with a covered front porch and a covered rear deck.

    240 m away · filed Oct 29, 2024 · Approved

  • 32 Gormley Ave · Minor variance

    To alter the existing two-storey, semi-detached dwelling by constructing a rear yard parking pad abutting Brentdale Drive. The existing one-storey ancillary building (detached garage), in the rear yard, will be maintained and unaltered.

    230 m away · filed Jul 11, 2024 · Approved

  • 20 Gormley Ave · Minor variance

    To construct a new three-storey semi-detached dwelling with a front porch and a rear ground floor deck. Also, to construct a new one-storey ancillary building (semi-detached garage) in the rear yard, abutting Brentdale Drive.

    230 m away · filed Aug 17, 2023 · Approved

  • 20 Gormley Ave · Consent

    To obtain consent to sever the property into two undersized residential lots.

    230 m away · filed Aug 17, 2023 · Approved

  • 20 Gormley Ave · Minor variance

    To construct a new three-storey semi-detached dwelling with a front porch and a rear ground floor deck. Also, to construct a new one-storey ancillary building (semi-detached garage) in the rear yard, abutting Brentdale Drive.

    230 m away · filed Aug 17, 2023 · Approved

  • 9 Colin Ave · Minor variance

    To construct a new two-storey detached dwelling with a covered front porch and a covered rear deck.

    240 m away · filed Jun 15, 2023 · Approved

  • 18 Wilberton Rd · Minor variance

    To construct an in-ground swimming pool and spa (with a pool fence enclosure) in the rear yard.

    200 m away · filed Oct 25, 2022 · Refused

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.