Toronto address · Ward 5, York South-Weston
29 Ray Ave
The City of Toronto has 5 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Addition(s)
Revision 01: Revision of previous permit - Main level height and 2nd level height, location of one main level beam, roof joist size, main staircase and 2nd level rooms allocation change, add bathroom window and basement windows size change.Proposed rear addition (140 sq ft ) and interior alterations (934 sq ft), and creation of secondary suite
Applied Jan 20, 2023 · issued Feb 3, 2023 · completed Aug 2, 2024 · Permit 21 119813 BLD (revision 01)
- Closed
Small residential project · Addition(s)
Proposed rear addition (140 sq ft ) and interior alterations (934 sq ft), and creation of secondary suite
Applied Feb 24, 2021 · issued Aug 9, 2021 · completed Aug 2, 2024 · Permit 21 119813 BLD
- Inspections under way
Small residential project · Multiple projects
Proposal for underpinning and beam column replacement in existing basement . Existing crawl space to be converted to basement & match new basment height.
Applied May 5, 2020 · issued Jul 30, 2020 · Permit 20 142640 BLD
- Inspections under way
Plumbing
Plumbing - PROPOSAL FOR UNDERPINNING AND BEAM COLUMN REPLACEMENT IN EXISTING BASEMENT . EXISTING CRAWL SPACE TO BE CONVERTED TO BASEMENT & MATCH NEW BASMENT HEIGHT.
Applied May 5, 2020 · issued Jul 30, 2020 · Permit 20 142640 PLB
- Inspections under way
Drains and site services
Drain - ONE SUMP PUMP. PROPOSAL FOR UNDERPINNING AND BEAM COLUMN REPLACEMENT IN EXISTING BASEMENT . EXISTING CRAWL SPACE TO BE CONVERTED TO BASEMENT & MATCH NEW BASMENT HEIGHT.
Applied May 5, 2020 · issued Jul 30, 2020 · Permit 20 142640 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
39 storeys · 531 homes · Residential
110 m away · Site plan · Under review · filed Jul 14, 2023
- Under review
43 storeys · 521 homes · Residential
130 m away · Site plan · Under review · filed Jul 14, 2023
- Submitted
14 storeys · 149 homes · Mixed use
200 m away · Site plan · Submitted · filed Apr 24, 2026
- Under appeal
26 storeys · Not stated in the file
220 m away · Rezoning · Under appeal · filed Feb 14, 2022
- Approved
8-16 Locust Street and 15 Oxford Drive
37 storeys · Residential
260 m away · Site plan · Approved · filed May 17, 2021
- Under appeal
48 storeys · 517 homes · Residential
300 m away · Site plan · Under appeal · filed Jan 22, 2024
Neighbours’ Committee of Adjustment files within 250 m
1284 Weston Rd · Minor variance
To convert the existing mixed-use building into a medical office.
220 m away · filed Mar 28, 2023 · Approved
1 Ray Ave · Minor variance
To construct a third storey addition above the existing dwelling and a three-storey rear addition.
110 m away · filed Feb 23, 2022 · Approved
45 Victoria Blvd · Minor variance
To construct a new detached garage.
70 m away · filed Jan 12, 2022 · Approved
15 Oxford Dr · Minor variance
To maintain the existing ten-storey apartment building.
190 m away · filed Jan 4, 2022 · Approved
15 Oxford Dr · Consent
To obtain consent to sever the property into two lots.
190 m away · filed May 6, 2021 · Approved
1 Victoria Blvd · Minor variance
To construct a second storey addition above the existing dwelling and garage.
210 m away · filed Dec 17, 2020 · Approved
3 Victoria Blvd · Minor variance
To maintain the existing detached garage.
200 m away · filed Aug 26, 2020 · Approved
19 Rutherford Ave · Minor variance
To construct a two-storey addition above the existing dwelling, a two-storey front addition, a new covered front porch and a south side addition to the existing detached garage.
250 m away · filed Nov 25, 2019 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.