Toronto address · Ward 24, Scarborough-Guildwood
29 Willsteven Dr
The City of Toronto has 5 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Small residential project · Multiple projects
REVISION 02: proposed second floor wall revised locationRevision 01: Revision to permit#23129975 BLD 00 SR to use the nu-excavated space under the side porch with the basement.PROPOSED: Addition to an existing one storey back split from north side (Two storey, without basement) and addition one room on existing rear one storey building, Also redesign existing interior layout in ground floor
Applied Dec 13, 2024 · issued Dec 30, 2024 · Permit 23 129975 BLD (revision 02)
- Inspections under way
Heating and ventilation
HVAC - Revision 01: Revision to permit#23129975 BLD 00 SR to use the nu-excavated space under the side porch with the basement.PROPOSED: Addition to an existing one storey back split from north side (Two storey, without basement) and addition one room on existing rear one storey building, Also redesign existing interior layout in ground floor
Applied Jul 31, 2024 · issued Aug 13, 2024 · Permit 23 129975 HVA
- Revision issued
Small residential project · Multiple projects
Revision 01: Revision to permit#23129975 BLD 00 SR to use the nu-excavated space under the side porch with the basement.PROPOSED: Addition to an existing one storey back split from north side (Two storey, without basement) and addition one room on existing rear one storey building, Also redesign existing interior layout in ground floor
Applied Jun 7, 2024 · issued Oct 1, 2024 · Permit 23 129975 BLD (revision 01)
- Inspections under way
Small residential project · Multiple projects
PROPOSED: Addition to an existing one storey back split from north side (Two storey, without basement) and addition one room on existing rear one storey building, Also redesign existing interior layout in ground floor
Applied Apr 3, 2023 · issued Aug 10, 2023 · Permit 23 129975 BLD
- Closed
Plumbing
Plumbing - PROPOSED: Addition to an existing one storey back split from north side (Two storey, without basement) and addition one room on existing rear one storey building, Also redesign existing interior layout in ground floor
Applied Apr 3, 2023 · issued Aug 10, 2023 · completed Oct 10, 2025 · Permit 23 129975 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
3583-3585 Lawrence Avenue East
35 storeys · 661 homes · Residential
380 m away · Rezoning · Approved · filed Feb 24, 2026
- Approved
3583-3585 Lawrence Avenue East
35 storeys · 661 homes · Residential
380 m away · Rezoning · Approved · filed Mar 7, 2025
Neighbours’ Committee of Adjustment files within 250 m
525 Markham Rd · Minor variance
To construct a 6 storey, 62 unit infill affordable rental apartment building.
240 m away · filed Nov 24, 2022 · Approved
1 Van Allan Rd · Consent
Section 57(1) of the Planning Act allows the assignment of authority to the Secretary-Treasurer, Committee of Adjustment or his/her designate to approve a Validation of Title. 1 Van Allan Road and 3 Van Allan Road were merged under one title and ownership. Title to 1 Van Allan Road is considered not valid.
100 m away · filed Jan 17, 2022 · Approved
25 Van Allan Rd · Minor variance
To construct a new uncovered porch at the front of the existing dwelling. The April 22, 2021 hearing has been postponed due to an unforeseen notification issue. This revised notice is to advise you the hearing for this application has been rescheduled to May 12, 2021.
70 m away · filed Feb 11, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.