Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

295 Shuter St

The City of Toronto has 6 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Other

    Proposal for interior & exterior repairs for the restoration of the concrete roof of the existing hydro vault, located at & below grade.

    Applied Aug 18, 2022 · issued Oct 24, 2022 · completed Oct 29, 2024 · Permit 22 192367 BLD

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Proposed 2 electromagnetic locks at ground level.

    Applied Dec 5, 2018 · completed Dec 21, 2018 · Permit 18 265013 FSU

    Cancelled
  • Heating and ventilation · HVAC: other group C buildings

    Installation of 250 kW CHeP System

    Applied May 10, 2018 · issued Jun 12, 2018 · completed Sep 17, 2019 · Permit 18 156663 MSA

    Closed
  • Fire and security upgrade · Other

    Applicant proposed to remove and replace the existing fire alarm panel with a new fire alarm panel.

    Applied Dec 6, 2016 · issued Dec 14, 2016 · completed Sep 1, 2017 · Permit 16 260577 FSU

    Closed
  • Heating and ventilation

    HVAC - Interior alteration to the Penthouse level area to provide accessible access to the area and a retrofit of the ground floor washroom.. This proposal also includes the revamping of seven (7) accessible parking spots for the building known as 295 Shuter Street which is a convenience address for 275 Shuter Street., there are seven(7) accessible spots existing on the property.

    Applied Dec 23, 2010 · issued Jan 11, 2011 · completed Jun 8, 2026 · Permit 10 319703 HVA

    Closed (dormant)
  • Plumbing

    Plumbing - Interior alteration to the Penthouse level area to provide accessible access to the area and a retrofit of the ground floor washroom.. This proposal also includes the revamping of seven (7) accessible parking spots for the building known as 295 Shuter Street which is a convenience address for 275 Shuter street., there are seven(7) accessible spots existing on the property.

    Applied Dec 23, 2010 · issued Jan 11, 2011 · completed Jul 24, 2026 · Permit 10 319703 PLB

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 285 Shuter St · Minor variance

    110 m away · filed May 22, 2026 · Postponed

  • 358 Queen St E · Minor variance

    To convert the second and third levels from residential units into commercial use(s).

    130 m away · filed Aug 24, 2023 · Approved

  • 351 Queen St E · Minor variance

    To alter the approved mixed-use development by increasing the height of the building that consists of 10, 12, 13 and 27-storeys, as shown on the Revised Diagram 3. Also, to increase both the total and residential gross floor areas, and to reduce the non-residential gross floor area, the number of vehicular parking spaces, and the residential amenity spaces.

    150 m away · filed Aug 23, 2023 · Approved

  • 238 Berkeley St · Consent

    To obtain consent to sever the lot into six residential lots and to create a new easements/rights-of-way for servicing purposes.

    250 m away · filed Mar 10, 2023 · Approved

  • 238 Berkeley St · Minor variance

    To construct a four-storey townhouse dwelling with a front integral garage, a front fourth floor balcony, a rear second floor deck, and rear Juliet balconies on the third and fourth floors.

    250 m away · filed Mar 10, 2023 · Approved

  • 238 Berkeley St · Minor variance

    To construct a four-storey townhouse dwelling with a front integral garage, a front fourth floor balcony, a rear second floor deck, and rear Juliet balconies on the third and fourth floors.

    250 m away · filed Mar 10, 2023 · Approved

  • 238 Berkeley St · Minor variance

    To construct a four-storey townhouse dwelling with a front integral garage, a front fourth floor balcony, a rear second floor deck, and rear Juliet balconies on the third and fourth floors.

    250 m away · filed Mar 10, 2023 · Approved

  • 238 Berkeley St · Minor variance

    To construct a four-storey townhouse dwelling with a front integral garage, a front fourth floor balcony, a rear second floor deck, and rear Juliet balconies on the third and fourth floors.

    250 m away · filed Mar 10, 2023 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.