Toronto address · Ward 19, Beaches-East York
2970 St Clair Ave E
The City of Toronto has 4 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Heating and ventilation
Rev.#1: Changes as per bubbled drawingsHVAC - Proposal to construct second storey addition and interior alterations to existing sfd.
Applied Dec 13, 2018 · issued Dec 24, 2018 · Permit 18 147266 HVA (revision 01)
- Inspections under way
Heating and ventilation
HVAC - Proposal to construct second storey addition and interior alterations to existing sfd.
Applied Aug 14, 2018 · issued Aug 21, 2018 · Permit 18 147266 HVA
- Inspections under way
Small residential project · Multiple projects
Proposal to construct second storey addition and interior alterations to existing sfd.
Applied Apr 23, 2018 · issued May 9, 2018 · Permit 18 147266 BLD
- Inspections under way
Plumbing
Plumbing - Proposal to construct second storey addition and interior alterations to existing sfd.
Applied Apr 23, 2018 · issued May 9, 2018 · Permit 18 147266 PLB
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a partial second-storey rear addition on top of the existing ground floor of a one-storey single family detached dwelling.
Decision: Approved (hearing Mar 21, 2018)
Filed Oct 3, 2017 · File A1071/17TEY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
77 Adair Rd · Minor variance
To legalize and to maintain the existing covered front porch with stairs that was built beyond the limits of the authorized building permit (Permit No. 21 177213 BLD 01 SR).
230 m away · filed May 4, 2026 · Approved
45 Peard Rd · Minor variance
To construct a new two-storey detached dwelling with an integral garage, a front covered porch with stairs, a rear covered ground floor deck with stairs, a rear basement walkout, a rear window well, and a rear second floor box bay window.
150 m away · filed Dec 8, 2025 · Approved
45 Peard Rd · Minor variance
To construct a new two-storey detached dwelling with an integral garage, a front covered porch with stairs, a rear covered ground floor deck with stairs, a rear basement walkout, a rear window well, and a rear second floor box bay window.
150 m away · filed Dec 8, 2025 · Approved
8 Holmstead Ave · Consent
To obtain consent to sever the property into two undersized residential lots and to maintain existing easements/rights-of-way.
200 m away · filed Jun 19, 2025 · Approved
8 Holmstead Ave · Minor variance
To construct a new two-storey detached dwelling (duplex) with a front porch with stairs, a front integral garage, a rear basement walkout, a rear first storey deck with stairs. There will be a total of two residential dwelling units on this lot.
200 m away · filed Feb 14, 2025 · Approved
8 Holmstead Ave · Minor variance
To construct a new two-storey detached dwelling (duplex) with a front porch with stairs, a front integral garage a rear basement walkout, and a rear first storey deck with stairs. There will be a total of two residential dwelling units on this lot.
200 m away · filed Feb 14, 2025 · Approved
2949 St Clair Ave E · Minor variance
To construct a new three-storey detached dwelling with an integrated garage and a rear second storey balcony.
130 m away · filed Jan 4, 2023 · Approved
83 Adair Rd · Minor variance
To construct a new three-storey detached dwelling with a front second storey porch and a rear second storey deck.
250 m away · filed Dec 28, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.