Toronto address · Ward 9, Davenport
298 Ossington Ave
The City of Toronto has 2 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
Plumbing - interior alterations to portions of all 3 floors and a proposed deck at rear on second floor
Applied Aug 7, 2012 · issued Aug 7, 2012 · completed Jun 22, 2026 · Permit 12 181468 PLB
- Inspections under way
Small residential project · Multiple projects
interior alterations to portions of all 3 floors and a proposed deck at rear on second floor
Applied May 28, 2012 · issued May 30, 2012 · Permit 12 181468 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
10 storeys · 74 homes · Residential
220 m away · Site plan · Under review · filed Apr 1, 2026
- Under review
- Under appeal
Neighbours’ Committee of Adjustment files within 250 m
350 Ossington Ave · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a new rear one-storey addition (with a second storey rooftop deck above), and a new rear third storey dormer addition. The existing rear third storey dormer, rear one-storey addition, and rear ground floor deck will be demolished.
150 m away · filed Mar 25, 2026 · Approved
1200 Dundas St W · Minor variance
To alter the development standards, as approved under Site Specific Zoning By-law 398-2022, for the eight-storey mixed-use building (which is currently under construction) by reducing the number of three-bedroom dwelling units.
170 m away · filed Jun 21, 2024 · Refused
328 Shaw St · Minor variance
To convert the existing two-storey, two-unit, semi-detached dwelling into a three-storey, four-unit, semi-detached dwelling (fourplex) by constructing a rear second storey addition above the existing rear one-storey brick addition, a complete third storey addition, a front basement walkout, a front second storey balcony, a rear third storey balcony, and new rear outdoor stairs accessing the third storey.
200 m away · filed Jun 17, 2024 · Approved
68 Roxton Rd · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear (west) second storey addition and a rear ground floor deck and stairs. Also, to alter the existing rear one-storey ancillary building (detached garage abutting Harrison Street) by constructing a complete second storey addition for the purpose of accommodating one garden suite. The three existing parking spaces within the garage will be maintained. There will be three dwelling units on this lot (two units within the main dwelling and one unit within the ancillary building).
100 m away · filed Jun 6, 2024 · Approved
22 Lakeview Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition.
170 m away · filed Dec 11, 2023 · Approved
117 Harrison St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition, and a rear ground level addition. Also, to reconstruct the rear ground-level deck and the front porch with stairs.
60 m away · filed Nov 21, 2023 · Approved
15 Churchill Ave · Minor variance
To permit two secondary suites (this dwelling will have a total of one primary unit and two secondary suites) within the existing two-and-one-half-storey detached dwelling.
150 m away · filed Nov 17, 2022 · Approved
1171 Dundas St W · Minor variance
To alter the existing three-storey mixed-use building by constructing a complete fourth storey addition, a rear four-storey addition, second, third and fourth floor balconies, and a rear stairwell. There will be three residential dwelling units and one commercial unit on this lot.
180 m away · filed Oct 19, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.