Toronto address · Ward 9, Davenport
299 Lauder Ave
The City of Toronto has 2 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
Plumbing - Proposal to construct third storey addition (10.56m2), and interior alterations (40.21m2) to existing single family detached dwelling. See related Zoning Certificate 18-219571.
Applied Nov 23, 2018 · issued Nov 29, 2018 · completed Dec 13, 2019 · Permit 18 260102 PLB
- Closed
Small residential project · Multiple projects
Proposal to construct third storey addition (10.56m2), and interior alterations (40.21m2) to existing single family detached dwelling. See related Zoning Certificate 18-219571.
Applied Nov 23, 2018 · issued Nov 29, 2018 · completed Dec 13, 2019 · Permit 18 260102 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
247 Lauder Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear three-storey addition, a third storey addition with a rear rooftop deck (above a portion of the second floor addition), new front porch (the existing front porch and the cantilevered portion of the front second floor above will be demolished), a rear ground floor deck with stairs, and a side (south) undersized parking pad on the existing driveway. Also, to construct a new one-storey detached ancillary building (shed with storage and hobby room) in the rear yard (the existing ancillary building (garage) in t…
220 m away · filed Sep 30, 2025 · Approved
247 Westmount Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a complete second storey addition (including a window projection at the north side). Also, to reconstruct the existing rear deck with stairs. There will be two residential dwelling units on this lot.
210 m away · filed Apr 3, 2025 · Approved
240 Glenholme Ave · Minor variance
To construct a one-storey ancillary building containing a garden suite (with rear (north facing) roof dormer) in the rear yard. The existing garage will be demolished.
50 m away · filed Jun 12, 2023 · Approved
173 Northcliffe Blvd · Minor variance
To construct a new two-storey ancillary building (containing one parking space on the ground level and one garden suite on the second storey) in the rear yard of the existing two-storey detached dwelling. The existing garage in the rear yard will be demolished.
250 m away · filed Jun 1, 2023 · Approved
249 Westmount Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a front one-storey addition with a porch, a complete second storey addition, a rear two-storey addition, a rear second storey balcony, a rear ground floor deck, and a basement secondary suite.
200 m away · filed Jan 9, 2023 · Approved
216 Glenholme Ave · Minor variance
To convert the existing three-storey detached dwelling from two units (Duplex) into four units (Fourplex).
140 m away · filed Jul 12, 2022 · Refused
305 Lauder Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition.
30 m away · filed May 19, 2022 · Approved
266 Glenholme Ave · Minor variance
To alter the existing three-storey detached dwelling by constructing a rear three-storey addition, a rear basement walkout and by extending the front canopy above the existing front porch.
90 m away · filed Jan 5, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.