Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 7, Humber River-Black Creek

3 Arrow Rd

The City of Toronto has 9 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Designated structure · Sign building permit related

    To erect and display two wall signs and an overhanging structure sign, all illuminated and displaying static copy.***THE CHURCH OF PENTECOST CANADA***

    Applied Sep 4, 2019 · issued Feb 12, 2020 · completed Sep 23, 2020 · Permit 19 215491 DST

    Closed
  • Addition or alteration · Multiple projects

    REV01: Revision to issued permit 14-265712 BLD as per bubbled area. Convert existing multi unit industrial building (units 5 -11) to place of worship. Mezzanine addition and interior alterations. Changes to roof. Add structure to roof.

    Applied Apr 4, 2019 · issued Jun 6, 2019 · completed Nov 28, 2019 · Permit 14 265712 BLD (revision 01)

    Closed
  • Addition or alteration · Multiple projects

    Convert existing multi unit industrial building (units 5 -11) to place of worship. Mezzanine addition and interior alterations. Changes to roof. Add structure to roof.

    Applied Dec 18, 2014 · issued Apr 15, 2016 · completed Nov 28, 2019 · Permit 14 265712 BLD

    Closed
  • Plumbing

    Plumbing - Convert existing multi unit industrial building (units 3-11)to place of worship. Demolish unit 3. Mezzanine addition and interior alterations. Changes to roof. Add structure to roof.

    Applied Dec 18, 2014 · issued Apr 15, 2016 · completed Feb 21, 2021 · Permit 14 265712 PLB

    Closed
  • Demolition

    Demo Unit 3 of industrial building

    Applied Dec 18, 2014 · issued Jul 7, 2015 · completed Dec 24, 2025 · Permit 14 265754 DEM

    Closed
  • Drains and site services · Inside and outside drains

    Drain - Convert existing multi unit industrial building (units 3-11)to place of worship. Demolish unit 3. Mezzanine addition and interior alterations. Changes to roof. Add structure to roof.

    Applied Dec 18, 2014 · issued Apr 15, 2016 · Permit 14 265712 STS

    Inspections under way
  • Heating and ventilation

    HVAC - Convert existing multi unit industrial building (units 3-11)to place of worship. Demolish unit 3. Mezzanine addition and interior alterations. Changes to roof. Add structure to roof.

    Applied Dec 18, 2014 · issued Apr 15, 2016 · completed Feb 4, 2020 · Permit 14 265712 HVA

    Closed
  • Addition or alteration · Interior alterations

    Interior alterations to existing retail building

    Applied Jun 3, 2003 · issued Jun 6, 2003 · Permit 03 139565 BLD

    Inspections under way
  • Addition or alteration · Interior demolition

    Interior demolition in existing restaurant.

    Applied Mar 25, 2003 · issued Mar 25, 2003 · completed Jun 8, 2026 · Permit 03 117652 BLD

    Closed (dormant)

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 24 Arrow Rd · Minor variance

    To construct a two-storey south side addition.

    90 m away · filed May 6, 2025 · Approved

Everything planned in Humber River-Black Creek

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.