Toronto address · Ward 21, Scarborough Centre
3 Fairway Dr
The City of Toronto has 7 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Second suite (New)
Proposal to renovate the basement for a secondary suite
Applied Sep 29, 2022 · issued Nov 25, 2022 · completed Jan 17, 2023 · 1 home added · Permit 22 210933 BLD
- Closed
Heating and ventilation
Revision 01: redesign of the HVAC system
Applied Jul 12, 2021 · issued Jul 28, 2021 · completed Aug 23, 2022 · Permit 20 183376 HVA (revision 01)
- Closed
Small residential project · Multiple projects
Revision - wider void on the second floor
Applied Dec 15, 2020 · issued Dec 31, 2020 · completed Sep 14, 2022 · Permit 20 183376 BLD (revision 01)
- Closed
Drains and site services
Drain - Proposal to constuct a new 2 storey addition to existing single family dwelling
Applied Sep 11, 2020 · issued Sep 11, 2020 · completed Aug 23, 2022 · Permit 20 183376 DRN
- Closed
Heating and ventilation
HVAC - Proposal to constuct a new 2 storey addition to existing single family dwelling
Applied Sep 4, 2020 · issued Sep 22, 2020 · completed Aug 23, 2022 · Permit 20 183376 HVA
- Closed
Small residential project · Multiple projects
Proposal to constuct a new 2 storey addition to existing single family dwelling
Applied Aug 20, 2020 · issued Sep 9, 2020 · completed Sep 14, 2022 · Permit 20 183376 BLD
- Closed
Plumbing
Plumbing - Proposal to constuct a new 2 storey addition to existing single family dwelling
Applied Aug 20, 2020 · issued Sep 9, 2020 · completed Sep 14, 2022 · Permit 20 183376 PLB
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Application withdrawn
Minor variance · R addition
To permit a second suite in the two-storey detached dwelling currently under construction. The proposed second suite will be located in the existing one-storey building with access from the front.
Decision: Deferred
Filed Jun 25, 2021 · File A0226/21SC
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
261 Bellamy Rd N · Minor variance
To construct a new rear second floor deck with railings and privacy screen. NOTE: This application was previously deferred at the Committee of Adjustment hearing on November 13, 2024.
160 m away · filed Sep 13, 2024 · Refused
1 Braeburn Blvd · Minor variance
To maintain the existing one-storey detached dwelling. Cross-reference related applications being considered together #B0008/24SC & #A0053/24SC.
160 m away · filed Feb 26, 2024 · Approved
1 Braeburn Blvd · Consent
Consent to sever the existing lot into 2 parcels. Cross reference related minor variance applications #A0053/24SC & #A0054/24SC.
160 m away · filed Feb 26, 2024 · Approved
1 Braeburn Blvd · Minor variance
To construct a new two-storey detached dwelling. Cross-reference related applications being considered together #B0008/24SC & #A0054/24SC.
160 m away · filed Feb 26, 2024 · Approved
261 Bellamy Rd N · Minor variance
To construct a second storey addition to the exisitng single-storey detached dwelling.
160 m away · filed Dec 12, 2023 · Approved
235 Bellamy Rd N · Minor variance
To construct a rear one storey sunroom to existing dwelling.
200 m away · filed Nov 20, 2023 · Approved
7 Braeburn Blvd · Minor variance
To construct a new two-storey detached dwelling with integral two car garage.
100 m away · filed Jul 23, 2021 · Approved
3 Braeburn Blvd · Consent
Proposal to sever the existing lot into 2 parcels.
140 m away · filed May 5, 2021 · Application withdrawn
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.