Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

3 Maribeth Ave

The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services

    Drain - Proposed construction of a 3-storey semi-detached dwelling and demolition of existing semi-detached dwelling.

    Applied May 3, 2019 · issued May 3, 2019 · completed Sep 24, 2019 · Permit 18 155696 DRN

    Closed
  • Heating and ventilation

    HVAC - Proposed construction of a 3-storey semi-detached dwelling and demolition of existing semi-detached dwelling.

    Applied May 9, 2018 · issued Jul 26, 2018 · completed Nov 7, 2019 · Permit 18 155696 HVA

    Closed
  • Plumbing

    Plumbing - Proposed construction of a 3-storey semi-detached dwelling and demolition of existing semi-detached dwelling.

    Applied May 9, 2018 · issued Jul 26, 2018 · completed Dec 12, 2019 · Permit 18 155696 PLB

    Closed
  • New house · New building

    Proposed construction of a 3-storey semi-detached dwelling and demolition of existing semi-detached dwelling.

    Applied May 9, 2018 · issued Jul 26, 2018 · completed Dec 12, 2019 · 1 home added · Permit 18 155696 BLD

    Closed
  • Demolition

    Proposed construction of a 3-storey semi-detached dwelling and demolition of existing semi-detached dwelling.

    Applied May 9, 2018 · issued Jul 26, 2018 · completed Apr 5, 2019 · 1 home removed · Permit 18 155760 DEM

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new three-storey semi-detached dwelling with a front yard parking space.

    Decision: Approved (hearing Oct 18, 2017)

    Filed Dec 6, 2016 · File A1188/16TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 134 Carlton St · Minor variance

    To alter the existing three-storey apartment building (containing 35 rental dwelling units) by converting the basement level (storage rooms and building management office) and a portion of the ground floor (vacant space) into an additional 11 rental dwelling units. There will be a total of 46 rental dwelling units on this lot.

    170 m away · filed May 13, 2025 · Approved

  • 130 Carlton St · Minor variance

    To permit the reconstruction of the mezzanine in the residential dwelling unit (Penthouse #8), of the 15-storey residential building.

    230 m away · filed Dec 12, 2024 · Approved

  • 169 Carlton St · Minor variance

    To construct a one-storey ancillary structure (carport), in the rear yard, abutting the laneway (Doctor O Lane), for two parking spaces.

    220 m away · filed Oct 10, 2024 · Approved

  • 130 Carlton St · Minor variance

    To alter the existing 15-storey mixed-use building by constructing a new main entrance vestibule.

    230 m away · filed Apr 26, 2022 · Approved

  • 50 Bleecker St · Minor variance

    To construct a third storey addition (enclosed staircase) to provide access to the proposed rooftop deck for Unit 2.

    130 m away · filed Jun 24, 2021 · Refused

  • 96 Bleecker St · Minor variance

    To alter the existing 2½-storey townhouse by constructing a rear third storey addition with a balcony.

    140 m away · filed Jan 4, 2019 · Approved

  • 65 Homewood Ave · Minor variance

    To alter the existing pair of semi-detached single family dwellings by combining them into one building with a total of 16 dwelling units.

    110 m away · filed Mar 29, 2017 · Approved

  • 1 Maribeth Ave · Minor variance

    To construct a new three-storey semi-detached dwelling with a front yard parking space.

    0 m away · filed Dec 6, 2016 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.