Toronto address · Ward 2, Etobicoke Centre
3 Orkney Cres
The City of Toronto has 5 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
New house · New building
To demolish existing dwelling and construct a new two storey dwelling with finished basement and integral garage
Applied Jun 4, 2019 · issued Jul 17, 2019 · 1 home added · Permit 19 165367 BLD
- Inspections under way
Demolition
To demolish existing dwelling and construct a new two storey dwelling with finished basement and integral garage
Applied Jun 4, 2019 · issued Jul 17, 2019 · 1 home removed · Permit 19 165389 DEM
- Inspections under way
Heating and ventilation
HVAC - To demolish existing dwelling and construct a new two storey dwelling with finished basement and integral garage
Applied Jun 4, 2019 · issued Jul 17, 2019 · Permit 19 165367 HVA
- Inspections under way
Plumbing
Plumbing - To demolish existing dwelling and construct a new two storey dwelling with finished basement and integral garage
Applied Jun 4, 2019 · issued Jul 17, 2019 · Permit 19 165367 PLB
- Inspections under way
Drains and site services
Drain - To demolish existing dwelling and construct a new two storey dwelling with finished basement and integral garage
Applied Jun 4, 2019 · issued Jul 17, 2019 · Permit 19 165367 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To construct a new detached dwelling with an attached garage.
Decision: Approved (hearing Nov 22, 2018)
Filed Jun 15, 2018 · File A0516/18EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
464 The Kingsway · Minor variance
To construct a second storey platform at the rear of the new dwelling currently under construction, and to convert the ancillary building currently under construction in the rear yard into a garden suite.
220 m away · filed Aug 7, 2026 · Refused
15 Ashwood Cres · Minor variance
To construct a one-storey rear addition, a covered front porch, and a covered rear patio that will connect to an accessory structure in the rear yard.
250 m away · filed May 9, 2024 · Approved
462 The Kingsway · Minor variance
To construct a new detached dwelling with an attached garage. A previous Committee of Adjustment application (A0357/23EYK) approved variances related to lot coverage, floor space index, front yard setback, side yard setback, roof eaves, location of ancillary structure and driveway width.
250 m away · filed Mar 28, 2024 · Approved
8 Grimsby Crt · Minor variance
To construct a new detached dwelling with an attached garage.
200 m away · filed Jan 15, 2024 · Approved
490 The Kingsway · Minor variance
To construct a new detached dwelling with an attached garage and an inground pool in the rear yard.
120 m away · filed Dec 20, 2023 · Approved
77 Abilene Dr · Minor variance
To construct a new detached dwelling with an attached garage.
230 m away · filed Oct 5, 2023 · Approved
462 The Kingsway · Minor variance
To construct a new detached dwelling with an attached garage.
250 m away · filed Aug 24, 2023 · Approved
26 Orkney Cres · Minor variance
To constructed a new detached dwelling with an integral garage.
250 m away · filed Sep 29, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.