Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 19, Beaches-East York

3 Welby Crcl

The City of Toronto has 5 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • New house · New building - by renovation

    PROPOSED 2ND FLOOR OVER EXISTING, NEW 2 STY REAR ADDITION & INTERIOR ALTERSNew House by Renovation

    Applied Jan 24, 2024 · issued Feb 7, 2024 · 1 home added · Permit 24 107786 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - PROPOSED 2ND FLOOR OVER EXISTING, NEW 2 STY REAR ADDITION & INTERIOR ALTERSNew House by Renovation

    Applied Jan 24, 2024 · issued Feb 16, 2024 · Permit 24 107786 HVA

    Inspections under way
  • Plumbing

    Plumbing - PROPOSED 2ND FLOOR OVER EXISTING, NEW 2 STY REAR ADDITION & INTERIOR ALTERSNew House by Renovation

    Applied Jan 24, 2024 · issued Feb 7, 2024 · Permit 24 107786 PLB

    Inspections under way
  • Drains and site services

    Drain - PROPOSED 2ND FLOOR OVER EXISTING, NEW 2 STY REAR ADDITION & INTERIOR ALTERSNew House by Renovation

    Applied Jan 24, 2024 · issued Feb 7, 2024 · Permit 24 107786 DRN

    Inspections under way
  • Demolition

    New House by Renovation

    Applied Jan 24, 2024 · issued Feb 7, 2024 · completed Aug 21, 2024 · 1 home removed · Permit 24 107825 DEM

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new two-storey detached dwelling with an integral garage, a front covered porch, two front second storey balconies, a side basement walkout, and to install a new roof over the existing rear deck.

    Decision: Approved (hearing Jan 25, 2023)

    Filed Oct 16, 2022 · File A1117/22TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 98 Parkview Hill Cres · Minor variance

    To legalize and to maintain the basement addition (lowering of the garage level) and the conversion of the area above the garage into habitable space (for an additional bedroom on the ground floor level), at the southeast corner of the dwelling, that was constructed beyond the limits of an authorized building permit (No. 25 236754 BLD 00 SR).

    100 m away · filed Jun 22, 2026 · Approved

  • 98 Parkview Hill Cres · Minor variance

    To alter the existing one-storey detached dwelling by constructing a front and side (east) two-storey addition, a covered front porch with stairs, an integral garage for one undersized parking space (the existing attached garage will be demolished), and a raised roof at the rear portion of the dwelling.

    100 m away · filed Jun 24, 2025 · Approved

  • 2 Stinson Crcl · Minor variance

    To alter the existing one-storey detached dwelling by constructing two-storey additions at the rear and east side of the dwelling, a complete second storey addition with a rear balcony, raised ground floor decks at the rear and west side of the dwelling, a covered front porch, an integral garage, and an oversized driveway.

    170 m away · filed Feb 22, 2023 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.