The City of Toronto has 378 building permits since 2017 (168 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Fire and security upgrade · Sprinklers

    Revision 04: revised drawings. REV 02: Revision to sprinkler system.Proposal for a new Fire Sprinkler System in an existing hospital - Shuter Tower (levels B3 to L3) and in the Cardinal Carter Wing renovation area L1

    Applied Jul 22, 2026 · issued Sep 9, 2026 · Permit 25 106503 FSU (revision 04)

    Revision issued
  • Plumbing

    Rev 05 - Interior updates to peri-operative and Anesthesia classroom. Extended DW5C fit up.REVISION 4 - minor alterations at DW5C levelPlumbing - Proposal for interior alterations to on 5th floor - Donnelly Wing Central and North Peri Operative. areas in existing hospital.

    Applied Jun 26, 2026 · issued Jul 15, 2026 · Permit 16 175348 PLB (revision 05)

    Revision issued
  • Heating and ventilation

    Rev 05 - Interior updates to peri-operative and Anesthesia classroom. Extended DW5C fit up.REVISION 4 - minor alterations at DW5C levelHVAC - Proposal for interior alterations to on 5th floor - Donnelly Wing Central and North Peri Operative. areas in existing hospital.

    Applied Jun 26, 2026 · issued Jul 15, 2026 · Permit 16 175348 HVA (revision 05)

    Revision issued
  • Addition or alteration · Interior alterations

    Rev 05 - Interior updates to peri-operative and Anesthesia classroom. Extended DW5C fit up.REVISION 4 - minor alterations at DW5C levelProposal for interior alterations to on 5th floor - Donnelly Wing Central and North Peri Operative. areas in existing hospital.

    Applied Jun 26, 2026 · issued Jul 15, 2026 · completed Aug 28, 2026 · Permit 16 175348 BLD (revision 05)

    Closed
  • Plumbing

    Plumbing - Convert Rm 4 072B, Donnelly Wing of St. Michael's Hospital into an accessible washroom to support on¿call staff.

    Applied Jun 3, 2026 · issued Jul 21, 2026 · Permit 26 176665 PLB

    Permit issued
  • Addition or alteration · Interior alterations

    Convert Rm 4 072B, Donnelly Wing of St. Michael's Hospital into an accessible washroom to support on call staff.

    Applied Jun 3, 2026 · issued Jun 25, 2026 · Permit 26 176665 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Convert Rm 4 072B, Donnelly Wing of St. Michael's Hospital into an accessible washroom to support on¿call staff.

    Applied Jun 3, 2026 · issued Jul 21, 2026 · Permit 26 176665 HVA

    Permit issued
  • Designated structure · Sign building permit related

    A sign permit to erect and display 1 overhanging structure sign + 4 wall signs, all displaying static copy.**THE SLAIGHT FAMILY EMERGENCY DEPARTMENT**

    Applied Apr 17, 2026 · issued May 8, 2026 · Permit 26 145551 DST

    Permit issued
  • Fire and security upgrade · Electromagnetic locks

    REVISION 3 - Revision to permit to remove the maglock from Door CN-L-B2AAdd 32 electromagnetic locks in Shuter Tower (levels B3 to L3) and in the Cardinal Carter Wing renovation area L1. Building permit: 16-260971

    Applied Apr 10, 2026 · issued Apr 13, 2026 · Permit 24 203445 FSU (revision 03)

    Revision issued
  • Fire and security upgrade · Sprinklers

    Proposal to provide F-K-5-1-12 Clean Agent System to Serve Hub Rooms and Electrical Rooms, and to provide fire alarm devices in 10th floor Existing Data Centre 10-183 and UPS room 10-184 and connect to existing building fire alarm control network.

    Applied Apr 2, 2026 · issued May 19, 2026 · Permit 26 138390 FSU

    Permit issued
  • Addition or alteration · Addition(s)

    Rev 02: see cover letterRev 01: see cover letterProposal to construct a 2-storey addition to existing hospital. Scope of work includes demolishing existing 6 storey Shuter Wing and constructing new Shuter Wing. See STE 16-148963.

    Applied Mar 20, 2026 · issued May 6, 2026 · Permit 16 260971 BLD (revision 02)

    Revision issued
  • Heating and ventilation

    Rev 03: see cover letterRev 02: see cover letterREV 01: as per Builidng Inspector Deficiency request, see cover letter for scope HVAC - Proposal to construct a 2-storey addition to existing hospital. Scope of work includes demolishing existing 6 storey Shuter Wing and constructing new Shuter Wing) See STE 16-148963.

    Applied Mar 20, 2026 · issued May 4, 2026 · Permit 16 260971 HVA (revision 03)

    Revision issued
Show 366 more permits
  • Plumbing

    Rev 02: see cover letterRev 01: see cover letterPlumbing - Proposal to construct a 2-storey addition to existing hospital. Scope of work includes demolishing existing 6 storey Shuter Wing and constructing new Shuter Wing) See STE 16-148963.

    Applied Mar 20, 2026 · completed Apr 29, 2026 · Permit 16 260971 PLB (revision 02)

    Cancelled
  • Fire and security upgrade · Electromagnetic locks

    Revision 02: Revision to permit to remove the maglock from Door CN-L-B2AAdd 32 electromagnetic locks in Shuter Tower (levels B3 to L3) and in the Cardinal Carter Wing renovation area L1. Building permit: 16-260971

    Applied Mar 11, 2026 · completed Mar 24, 2026 · Permit 24 203445 FSU (revision 02)

    Cancelled
  • Fire and security upgrade · Sprinklers

    REV 02: Revision to sprinkler system.Proposal for a new Fire Sprinkler System in an existing hospital - Shuter Tower (levels B3 to L3) and in the Cardinal Carter Wing renovation area L1

    Applied Feb 5, 2026 · issued Feb 19, 2026 · Permit 25 106503 FSU (revision 03)

    Revision issued
  • Fire and security upgrade · Sprinklers

    REVISION 02 - revised sprinkler layoutREVISION 01 - revised permit setProposal for a new Fire Sprinkler System in an existing hospital - Shuter Tower (levels B3 to L3) and in the Cardinal Carter Wing renovation area L1

    Applied Dec 22, 2025 · completed Jan 9, 2026 · Permit 25 106503 FSU (revision 02)

    Cancelled
  • Plumbing

    Rev 01: see cover letterPlumbing - Proposal to construct a 2-storey addition to existing hospital. Scope of work includes demolishing existing 6 storey Shuter Wing and constructing new Shuter Wing) See STE 16-148963.

    Applied Dec 9, 2025 · issued Jan 14, 2026 · Permit 16 260971 PLB (revision 01)

    Revision issued
  • Heating and ventilation

    Rev 02: see cover letterREV 01: as per Builidng Inspector Deficiency request, see cover letter for scope HVAC - Proposal to construct a 2-storey addition to existing hospital. Scope of work includes demolishing existing 6 storey Shuter Wing and constructing new Shuter Wing) See STE 16-148963.

    Applied Dec 9, 2025 · issued Jan 14, 2026 · Permit 16 260971 HVA (revision 02)

    Revision issued
  • Addition or alteration · Addition(s)

    Rev 01: see cover letterProposal to construct a 2-storey addition to existing hospital. Scope of work includes demolishing existing 6 storey Shuter Wing and constructing new Shuter Wing. See STE 16-148963.

    Applied Dec 9, 2025 · issued Jan 26, 2026 · Permit 16 260971 BLD (revision 01)

    Revision issued
  • Plumbing

    Revision 03: Revision to PLB - Donnelly Wing Flr 2 - Interior RenovationsREV 01 - Revision to PLB- Description in attachedPlumbing - Proposed scope of work involves demolition of interior partition walls and ceilings, and redesign and resinstallation of interior layout on the second floor of St. Michael's Hospital, Donnelly Wing.

    Applied Nov 20, 2025 · issued Jan 6, 2026 · completed Mar 30, 2026 · Permit 23 129063 PLB (revision 03)

    Closed
  • Heating and ventilation

    Revision 03: Revision to HVAC - Donnelly Wing Flr 2 - Interior RenovationsREV 01 - Revision to HVAC - Description in attachedHVAC - Proposed scope of work involves demolition of interior partition walls and ceilings, and redesign and reinstallation of interior layout on the second floor of St. Michael's Hospital, Donnelly Wing.

    Applied Nov 20, 2025 · issued Dec 31, 2025 · completed Apr 2, 2026 · Permit 23 129063 HVA (revision 03)

    Closed
  • Fire and security upgrade · Electromagnetic locks

    REVISION - to revise the Maglock Permit, based on the attached updated listAdd 32 electromagnetic locks in Shuter Tower (levels B3 to L3) and in the Cardinal Carter Wing renovation area L1. Building permit: 16-260971

    Applied Oct 21, 2025 · issued Nov 21, 2025 · Permit 24 203445 FSU (revision 01)

    Revision issued
  • Plumbing

    Plumbing - Proposal for interior alterations for Palliative Care unit refrece - level 4 Donnelly Wing

    Applied Sep 30, 2025 · issued Nov 14, 2025 · Permit 25 232908 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for interior alterations for Palliative Care unit refresh - level 4 Donnelly Wing

    Applied Sep 30, 2025 · issued Nov 14, 2025 · Permit 25 232908 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for interior alterations for Palliative Care unit refrece - level 4 Donnelly Wing

    Applied Sep 30, 2025 · issued Nov 14, 2025 · Permit 25 232908 HVA

    Permit issued
  • Addition or alteration · Interior alterations

    Revision 02: Revision to main BLD - Description in attachedREV 01 - Revision to main BLD - Description in attachedProposed scope of work involves demolition of interior partition walls and ceilings, and redesign and resinstallation of interior layout on the second floor of St. Michael's Hospital, Donnelly Wing.

    Applied Sep 19, 2025 · issued Oct 30, 2025 · completed Mar 12, 2026 · Permit 23 129063 BLD (revision 02)

    Closed
  • Plumbing

    Revision 02: Revision to PLB- Description in attachedREV 01 - Revision to PLB- Description in attachedPlumbing - Proposed scope of work involves demolition of interior partition walls and ceilings, and redesign and resinstallation of interior layout on the second floor of St. Michael's Hospital, Donnelly Wing.

    Applied Sep 19, 2025 · completed Nov 3, 2025 · Permit 23 129063 PLB (revision 02)

    Cancelled
  • Heating and ventilation

    Revision 02: Revision to HVAC - Description in attachedREV 01 - Revision to HVAC - Description in attachedHVAC - Proposed scope of work involves demolition of interior partition walls and ceilings, and redesign and resinstallation of interior layout on the second floor of St. Michael's Hospital, Donnelly Wing.

    Applied Sep 19, 2025 · completed Nov 3, 2025 · Permit 23 129063 HVA (revision 02)

    Cancelled
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to upgrade MRI rooms 1 & 4, also level B2 Cardinal Carter Wing.

    Applied Sep 9, 2025 · issued Oct 23, 2025 · Permit 25 222408 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for interior alterations to upgrade MRI rooms 1 & 4, also level B2 Cardinal Carter Wing.

    Applied Sep 9, 2025 · issued Oct 23, 2025 · Permit 25 222408 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for interior alterations to upgrade MRI rooms 1 & 4, also level B2 Cardinal Carter Wing.

    Applied Sep 9, 2025 · issued Oct 23, 2025 · Permit 25 222408 HVA

    Inspections under way
  • Fire and security upgrade · Electromagnetic locks

    REVISION 01: Add one electromagnetic lock to DW5A Revision to have the installation of two (2) electromagnetic locks instead of 3. See permit24 -221198.

    Applied Aug 28, 2025 · issued Sep 3, 2025 · completed Oct 1, 2025 · Permit 25 192081 FSU (revision 01)

    Closed
  • Addition or alteration · Addition(s)

    Rev 01 - Proposed sprinkler & fire standpipe alterations.Proposal to enclose/convert existing ADD-4 courtyard space into a double height corridor space - St. Michaels Hospital

    Applied Aug 26, 2025 · completed Oct 22, 2025 · Permit 24 100070 BLD (revision 01)

    Cancelled
  • Heating and ventilation

    HVAC - Proposed interior alteration on Level 15 to relocate NICU. Proposed work includes a new air handling unit (AHU) in the roof, complete with service stair and platform.

    Applied Jul 22, 2025 · issued Feb 19, 2026 · Permit 25 195702 HVA

    Permit issued
  • Plumbing

    Plumbing - Proposed interior alteration on Level 15 to relocate NICU. Proposed work includes a new air handling unit (AHU) in the roof, complete with service stair and platform.

    Applied Jul 22, 2025 · issued Feb 19, 2026 · Permit 25 195702 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposed interior alteration on Level 15 to relocate NICU. Proposed work includes a new air handling unit (AHU) in the roof, complete with service stair and platform.

    Applied Jul 17, 2025 · issued Feb 24, 2026 · Permit 25 195702 BLD

    Inspections under way
  • Fire and security upgrade · Electromagnetic locks

    Revision to have the installation of two (2) electromagnetic locks instead of 3. See permit24 -221198.

    Applied Jul 11, 2025 · issued Jul 22, 2025 · completed Oct 1, 2025 · Permit 25 192081 FSU

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations for the upgrading of finishes and doors of the existing mental health rooms on the 17th floor - St. Michael's Hospital

    Applied Jul 11, 2025 · issued Aug 27, 2025 · completed Mar 23, 2026 · Permit 25 192058 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations for the upgrading of finishes and doors of the existing mental health rooms on the 17th floor - St. Michael's Hospital

    Applied Jul 11, 2025 · issued Aug 27, 2025 · completed Mar 23, 2026 · Permit 25 192058 BLD

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations for the upgrading of finishes and doors of the existing mental health rooms on the 17th floor - St. Michael's Hospital

    Applied Jul 11, 2025 · issued Aug 27, 2025 · completed Mar 27, 2026 · Permit 25 192058 PLB

    Closed
  • Plumbing

    REV 04: revise Sanitary drainage now running to under sink sump pump, pumping it to high level to connect to an alternate drainage on level 1.This is an alternate approach being pursued due to structural interferences and EMF shielding in the electrical room below..Plumbing - Proposal for interior alterations of existing lounge and office into United Health Indigenous Centre, demolition of a bathroom, addition of a servery.-DONNELLY WING - Unit 1-611

    Applied Jul 9, 2025 · completed Jul 10, 2025 · Permit 24 231019 PLB (revision 04)

    Cancelled
  • Fire and security upgrade · Electromagnetic locks

    REV 01 : Proposal to add two electromagnetic locks in DW(L2,L5) Proposal to Add Three electromagnetic locks in DW(L2,L5) & CCW L4.

    Applied Jun 10, 2025 · completed Jun 19, 2025 · Permit 24 221198 FSU (revision 01)

    Cancelled
  • Fire and security upgrade · Sprinklers

    REVISION - revised permit setProposal for a new Fire Sprinkler System in an existing hospital - Shuter Tower (levels B3 to L3) and in the Cardinal Carter Wing renovation area L1

    Applied May 13, 2025 · issued Jun 18, 2025 · Permit 25 106503 FSU (revision 01)

    Revision issued
  • Heating and ventilation

    REV 01: as per Builidng Inspector Deficiency request, see cover letter for scope HVAC - Proposal to construct a 2-storey addition to existing hospital. Scope of work includes demolishing existing 6 storey Shuter Wing and constructing new Shuter Wing) See STE 16-148963.

    Applied May 9, 2025 · issued Aug 26, 2025 · Permit 16 260971 HVA (revision 01)

    Revision issued
  • Plumbing

    REVISION 02: Revision to correspond with approved Alternative Solution Decision: 24 218907 ALT 00 AS (30 BOND ST) and Approved BLD & HVAC Revscorrespond with approved Alternative Solution Decision: 24 218907 ALT 00 AS (30 BOND ST)REVISION :01 interior alterations to the 4th floor of the Cardinal Carter Wing, St. Michael's Hospital. Scope of work involves demolition of interior partition walls and ceilings, and redesign and reinstallation of the interior layoutPlumbing - Proposal for interior alterations to area of CCW floors 4, 7, 8, 9, 14 abutting the Patient Care Tower (PCT)

    Applied Apr 29, 2025 · issued Jun 13, 2025 · Permit 16 134765 PLB (revision 03)

    Revision issued
  • Plumbing

    REV 03: Revised drainage and sump pump addition.Plumbing - Proposal for interior alterations of existing lounge and office into United Health Indigenous Centre, demolition of a bathroom, addition of a servery.-DONNELLY WING - Unit 1-611

    Applied Apr 9, 2025 · issued Apr 15, 2025 · completed Aug 19, 2025 · Permit 24 231019 PLB (revision 03)

    Closed
  • Addition or alteration · Interior alterations

    REV01: Proposed revision to add handwash sink and delete new HVAC rooftop unit (existing system to remain).Proposal for interior alterations of existing lounge and office into United Health Indigenous Centre, demolition of a bathroom, addition of a servery.-DONNELLY WING - Unit 1-611

    Applied Feb 21, 2025 · issued Jul 23, 2025 · completed Aug 19, 2025 · Permit 24 231019 BLD (revision 01)

    Closed
  • Plumbing

    REV01: Proposed revision to add handwash sink and delete new HVAC rooftop unit (existing system to remain).Plumbing - Proposal for interior alterations of existing lounge and office into United Health Indigenous Centre, demolition of a bathroom, addition of a servery.-DONNELLY WING - Unit 1-611

    Applied Feb 21, 2025 · issued Mar 13, 2025 · completed Aug 19, 2025 · Permit 24 231019 PLB (revision 01)

    Closed
  • Heating and ventilation

    REV01: Proposed revision to add handwash sink and delete new HVAC rooftop unit (existing system to remain).HVAC - Proposal for interior alterations of existing lounge and office into United Health Indigenous Centre, demolition of a bathroom, addition of a servery.-DONNELLY WING - Unit 1-611

    Applied Feb 21, 2025 · issued Mar 13, 2025 · completed Aug 26, 2025 · Permit 24 231019 HVA (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    REVISION 02: o correspond with approved Alternative Solution Decision: 24 218907 ALT 00 AS (30 BOND ST)REVISION :01 interior alterations to the 4th floor of the Cardinal Carter Wing, St. Michael's Hospital. Scope of work involves demolition of interior partition walls and ceilings, and redesign and reinstallation of the interior layout.Proposal for interior alterations to area of CCW floors 4, 7, 8, 9, 14 abutting the Patient Care Tower (PCT)

    Applied Feb 20, 2025 · issued Mar 17, 2025 · completed Aug 28, 2026 · Permit 16 134765 BLD (revision 02)

    Closed
  • Plumbing

    REVISION 02: o correspond with approved Alternative Solution Decision: 24 218907 ALT 00 AS (30 BOND ST)REVISION :01 interior alterations to the 4th floor of the Cardinal Carter Wing, St. Michael's Hospital. Scope of work involves demolition of interior partition walls and ceilings, and redesign and reinstallation of the interior layoutPlumbing - Proposal for interior alterations to area of CCW floors 4, 7, 8, 9, 14 abutting the Patient Care Tower (PCT)

    Applied Feb 20, 2025 · completed Mar 14, 2025 · Permit 16 134765 PLB (revision 02)

    Cancelled
  • Heating and ventilation

    REVISION 02: o correspond with approved Alternative Solution Decision: 24 218907 ALT 00 AS (30 BOND ST)REVISION :01 interior alterations to the 4th floor of the Cardinal Carter Wing, St. Michael's Hospital. Scope of work involves demolition of interior partition walls and ceilings, and redesign and reinstallation of the interior layout.HVAC - Proposal for interior alterations to area of CCW floors 4, 7, 8, 9, 14 abutting the Patient Care Tower (PCT)

    Applied Feb 20, 2025 · issued Apr 14, 2025 · Permit 16 134765 HVA (revision 02)

    Revision issued
  • Fire and security upgrade · Sprinklers

    Proposal for a new Fire Sprinkler System in an existing hospital - Shuter Tower (levels B3 to L3) and in the Cardinal Carter Wing renovation area L1

    Applied Jan 20, 2025 · issued Apr 9, 2025 · Permit 25 106503 FSU

    Inspections under way
  • Plumbing

    REVISION 4 - minor alterations at DW5C levelPlumbing - Proposal for interior alterations to on 5th floor - Donnelly Wing Central and North Peri Operative. areas in existing hospital.

    Applied Jan 13, 2025 · issued Feb 26, 2025 · Permit 16 175348 PLB (revision 04)

    Revision issued
  • Addition or alteration · Interior alterations

    REVISION 4 - minor alterations at DW5C levelProposal for interior alterations to on 5th floor - Donnelly Wing Central and North Peri Operative. areas in existing hospital.

    Applied Jan 13, 2025 · issued Feb 26, 2025 · completed Aug 28, 2026 · Permit 16 175348 BLD (revision 04)

    Closed
  • Heating and ventilation

    REVISION 4 - minor alterations at DW5C levelHVAC - Proposal for interior alterations to on 5th floor - Donnelly Wing Central and North Peri Operative. areas in existing hospital.

    Applied Jan 13, 2025 · issued Feb 26, 2025 · Permit 16 175348 HVA (revision 04)

    Revision issued
  • Conditional permit · Addition(s)

    Conditional Permit - Proposal to construct a 2-storey addition to existing hospital. Scope of work includes demolishing existing 6 storey Shuter Wing and constructing new Shuter Wing. See STE 16-148963.

    Applied Jan 9, 2025 · issued Aug 26, 2025 · completed Nov 24, 2025 · Permit 16 260971 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations of existing lounge and office into United Health Indigenous Centre, demolition of a bathroom, addition of a servery.-DONNELLY WING - Unit 1-611

    Applied Oct 25, 2024 · issued Dec 6, 2024 · completed Aug 26, 2025 · Permit 24 231019 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations of existing lounge and office into United Health Indigenous Centre, demolition of a bathroom, addition of a servery.-DONNELLY WING - Unit 1-611

    Applied Oct 25, 2024 · issued Dec 6, 2024 · completed Aug 19, 2025 · Permit 24 231019 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations of existing lounge and office into United Health Indigenous Centre, demolition of a bathroom, addition of a servery.-DONNELLY WING - Unit 1-611

    Applied Oct 25, 2024 · issued Dec 6, 2024 · completed Aug 19, 2025 · Permit 24 231019 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposed interior alterations for Fluroscopy suite.

    Applied Oct 23, 2024 · issued Nov 28, 2024 · completed Jul 7, 2025 · Permit 24 230130 HVA

    Closed
  • Plumbing

    Plumbing - Proposed interior alterations for Fluroscopy suite.

    Applied Oct 23, 2024 · issued Nov 28, 2024 · completed Jun 23, 2025 · Permit 24 230130 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposed interior alterations for Fluroscopy suite.

    Applied Oct 23, 2024 · issued Nov 27, 2024 · completed Jun 20, 2025 · Permit 24 230130 BLD

    Closed
  • Addition or alteration · Interior alterations

    Renovation of existing lounge and office into United Health Indigenous Centre, demolition of a bathroom, addition of a servery.

    Applied Oct 17, 2024 · completed Oct 22, 2024 · Permit 24 227588 BLD

    Cancelled
  • Plumbing

    Plumbing - Renovation of existing lounge and office into United Health Indigenous Centre, demolition of a bathroom, addition of a servery.

    Applied Oct 17, 2024 · completed Oct 22, 2024 · Permit 24 227588 PLB

    Cancelled
  • Heating and ventilation

    HVAC - Renovation of existing lounge and office into United Health Indigenous Centre, demolition of a bathroom, addition of a servery.

    Applied Oct 17, 2024 · completed Oct 22, 2024 · Permit 24 227588 HVA

    Cancelled
  • Fire and security upgrade · Electromagnetic locks

    Proposal to Add Three electromagnetic locks in DW(L2,L5) & CCW L4.

    Applied Oct 2, 2024 · issued Oct 23, 2024 · completed Oct 1, 2025 · Permit 24 221198 FSU

    Closed
  • Alternative solution

    Alternative Solution to address an interior patient room 4-036 which is located on Level 4 of Cardinal Carter Wing CCW4A of the St. Michael's Hospital Associated with BP # 16-134765

    Applied Sep 27, 2024 · completed Jan 30, 2025 · Permit 24 218907 ALT

    Approved
  • Addition or alteration · Interior alterations

    REVISION 3 - demolition of interior partition walls and ceilings, and redesign and reinstall interior layout (including sprinklers) within the 5th Floor of Donnelly WingProposal for interior alterations to on 5th floor - Donnelly Wing Central and North Peri Operative. areas in existing hospital.

    Applied Sep 12, 2024 · issued Nov 14, 2024 · completed Aug 28, 2026 · Permit 16 175348 BLD (revision 03)

    Closed
  • Heating and ventilation

    REVISION 3 - demolition of interior partition walls and ceilings, and redesign and reinstall interior layout within the 5th Floor of Donnelly WingHVAC - Proposal for interior alterations to on 5th floor - Donnelly Wing Central and North Peri Operative. areas in existing hospital.

    Applied Sep 12, 2024 · issued Dec 13, 2024 · Permit 16 175348 HVA (revision 03)

    Revision issued
  • Plumbing

    REVISION 3 - demolition of interior partition walls and ceilings, and redesign and reinstall interior layout within the 5th Floor of Donnelly WingPlumbing - Proposal for interior alterations to on 5th floor - Donnelly Wing Central and North Peri Operative. areas in existing hospital.

    Applied Sep 12, 2024 · issued Nov 19, 2024 · Permit 16 175348 PLB (revision 03)

    Revision issued
  • Addition or alteration · Addition(s)

    Proposal to enclose the ambulance bay of an existing hospital - St. Michaels Hospital

    Applied Sep 4, 2024 · issued Nov 6, 2024 · Permit 24 207862 BLD

    Inspections under way
  • Fire and security upgrade · Electromagnetic locks

    Add 32 electromagnetic locks in Shuter Tower (levels B3 to L3) and in the Cardinal Carter Wing renovation area L1. Building permit: 16-260971

    Applied Aug 26, 2024 · issued Sep 4, 2024 · Permit 24 203445 FSU

    Inspections under way
  • Partial permit · Partial permit - structural framing

    Part Permit - Proposal to construct a 2-storey addition to existing hospital. Scope of work includes demolishing existing 6 storey Shuter Wing and constructing new Shuter Wing. See STE 16-148963.

    Applied Jul 23, 2024 · completed Feb 11, 2025 · Permit 16 260971 STR

    Superseded
  • Plumbing

    REV 01 - Revision to PLB- Description in attachedPlumbing - Proposed scope of work involves demolition of interior partition walls and ceilings, and redesign and resinstallation of interior layout on the second floor of St. Michael's Hospital, Donnelly Wing.

    Applied Jul 19, 2024 · issued Oct 24, 2024 · completed Mar 30, 2026 · Permit 23 129063 PLB (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    REV 01 - Revision to main BLD - Description in attachedProposed scope of work involves demolition of interior partition walls and ceilings, and redesign and resinstallation of interior layout on the second floor of St. Michael's Hospital, Donnelly Wing.

    Applied Jul 19, 2024 · issued Sep 5, 2024 · completed Mar 12, 2026 · Permit 23 129063 BLD (revision 01)

    Closed
  • Heating and ventilation

    REV 01 - Revision to HVAC - Description in attachedHVAC - Proposed scope of work involves demolition of interior partition walls and ceilings, and redesign and resinstallation of interior layout on the second floor of St. Michael's Hospital, Donnelly Wing.

    Applied Jul 19, 2024 · issued Sep 27, 2024 · completed Apr 2, 2026 · Permit 23 129063 HVA (revision 01)

    Closed
  • Heating and ventilation · Other

    Chemical line replacement, second floor for St. Michael's Hospital

    Applied Jul 11, 2024 · issued Jul 24, 2024 · completed Feb 21, 2025 · Permit 24 178419 MSA

    Closed
  • Plumbing · Other

    Chemical line replacement, second floor for St. Michael's Hospital

    Applied Jul 11, 2024 · issued Jul 25, 2024 · completed Feb 20, 2025 · Permit 24 178416 PSA

    Closed
  • Addition or alteration · Interior alterations

    Level 8 Donnley WingProposal for Roof Repair & Interior Corridor renovation

    Applied Jun 21, 2024 · completed May 27, 2026 · Permit 24 168582 BLD

    Cancelled
  • Heating and ventilation

    HVAC - Level8 Donnley WingProposal for Roof Repair & Interior Corridor renovation

    Applied Jun 21, 2024 · completed May 27, 2026 · Permit 24 168582 HVA

    Cancelled
  • Fire and security upgrade · Electromagnetic locks

    Proposed installation 2 new Electromagnetic Locks: Double doors 3-101C and 3-101D

    Applied Jun 19, 2024 · issued Jul 31, 2024 · completed Apr 10, 2025 · Permit 24 167165 FSU

    Closed
  • Fire and security upgrade · Sprinklers

    Proposed intallation of additional sprinklers in an existing wet sprinkler system and new pre-action system for the CT scan room on level 3 of an existing hospital.

    Applied Apr 27, 2024 · issued Jun 27, 2024 · completed May 27, 2025 · Permit 24 141234 FSU

    Closed
  • Plumbing

    Plumbing - Proposal to enclose/convert existing ADD-4 courtyard space into a double height corridor space - St. Michaels Hospital

    Applied Jan 2, 2024 · issued Oct 7, 2024 · Permit 24 100070 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to enclose/convert existing ADD-4 courtyard space into a double height corridor space - St. Michaels Hospital

    Applied Jan 2, 2024 · issued Oct 7, 2024 · Permit 24 100070 HVA

    Inspections under way
  • Addition or alteration · Addition(s)

    Proposal to enclose/convert existing ADD-4 courtyard space into a double height corridor space - St. Michaels Hospital

    Applied Jan 2, 2024 · issued Oct 7, 2024 · Permit 24 100070 BLD

    Inspections under way
  • Drains and site services

    Drain - Proposal to construct a 2-storey addition to existing hospital. Scope of work includes demolishing existing 6 storey Shuter Wing and constructing new Shuter Wing. See STE 16-148963.

    Applied Jul 20, 2023 · issued Aug 26, 2024 · Permit 16 260971 DRN

    Inspections under way
  • Partial permit · Partial permit - foundation

    Part Permit - Proposal to construct a 2-storey addition to existing hospital. Scope of work includes demolishing existing 6 storey Shuter Wing and constructing new Shuter Wing. See STE 16-148963.

    Applied Jul 6, 2023 · completed Sep 24, 2024 · Permit 16 260971 FND

    Superseded
  • Conditional permit · Partial permit - shoring

    Conditional Permit - Part Permit - Proposal to construct a 2-storey addition to existing hospital with 3 level below grade . Scope of work includes demolishing existing 6 storey Shuter Wing and constructing new Shuter Wing. See STE 16-148963.

    Applied Jul 5, 2023 · issued Jul 21, 2023 · completed Feb 1, 2024 · Permit 16 260971 SHO

    Cancelled
  • Fire and security upgrade · Sprinklers

    Proposal for Fire Protection Sprinklers - St Michael's Hospital

    Applied Jul 4, 2023 · completed Sep 8, 2023 · Permit 23 169561 FSU

    Cancelled
  • Addition or alteration · Interior alterations

    REVISION 02 - demolition of interior partition walls and ceilings, and redesign and reinstall interior layout within the 5th Floor of Donnelly WingProposal for interior alterations to on 5th floor - Donnelly Wing Central and North Peri Operative. areas in existing hospital.

    Applied Jun 26, 2023 · issued Aug 18, 2023 · completed Aug 28, 2026 · Permit 16 175348 BLD (revision 02)

    Closed
  • Plumbing

    REVISION 02 - demolition of interior partition walls and ceilings, and redesign and reinstall interior layout within the 5th Floor of Donnelly WingPlumbing - Proposal for interior alterations to on 5th floor - Donnelly Wing Central and North Peri Operative. areas in existing hospital.

    Applied Jun 26, 2023 · issued Aug 11, 2023 · Permit 16 175348 PLB (revision 02)

    Revision issued
  • Heating and ventilation

    REVISION 02 - demolition of interior partition walls and ceilings, and redesign and reinstall interior layout within the 5th Floor of Donnelly WingHVAC - Proposal for interior alterations to on 5th floor - Donnelly Wing Central and North Peri Operative. areas in existing hospital.

    Applied Jun 26, 2023 · issued Aug 10, 2023 · Permit 16 175348 HVA (revision 02)

    Revision issued
  • Plumbing · Other

    Replacement of Chilled Water Pumps( Heating and Cooling) on 12th floor of St. Michael's Hospital.

    Applied Jun 23, 2023 · issued Aug 28, 2023 · Permit 23 165413 PSA

    Permit issued
  • Addition or alteration · Interior alterations

    Fit-out and renovation of existing partially shelled space to create new conference room, AV control room, storage and accessible washroom

    Applied Jun 5, 2023 · issued Aug 15, 2023 · Permit 23 156422 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Fit-out and renovation of existing partially shelled space to create new conference room, AV control room, storage and accessible washroom

    Applied Jun 5, 2023 · issued Aug 15, 2023 · Permit 23 156422 HVA

    Permit issued
  • Plumbing

    Plumbing - Fit-out and renovation of existing partially shelled space to create new conference room, AV control room, storage and accessible washroom

    Applied Jun 5, 2023 · issued Aug 15, 2023 · Permit 23 156422 PLB

    Permit issued
  • Drains and site services · Site service

    Site Services - Proposal to construct a 2-storey addition to existing hospital. Scope of work includes demolishing existing 6 storey Shuter Wing and constructing new Shuter Wing. See STE 16-148963.

    Applied Apr 19, 2023 · issued Feb 1, 2024 · Permit 16 260971 STS

    Inspections under way
  • Addition or alteration · Interior alterations

    REVISION - Existing partitions will be partially removed and reinstalled and update life safetyProposal for interior alterations for fire stops and slab penetration related to permit 15-130301 PSA - St Michael's Hospital

    Applied Apr 14, 2023 · issued Jun 12, 2023 · Permit 15 240684 BLD (revision 01)

    Revision issued
  • Plumbing

    Plumbing - Proposal for interior alterations for fire stops and slab penetration related to permit 15-130301 PSA - St Michael's Hospital

    Applied Apr 14, 2023 · issued Jun 6, 2023 · Permit 15 240684 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    Infill of Level 1, 2 and 3 existing elevator shafts with concrete slab, with alteration to B1 elevator shaft. Structural scope involves framing concrete and B1 slab on grade. Infilled elevator shaft will be used to house mechanical equipment.

    Applied Apr 14, 2023 · issued May 30, 2023 · completed Oct 29, 2024 · Permit 23 134112 BLD

    Closed
  • Heating and ventilation

    HVAC - Infill of Level 1, 2 and 3 existing elevator shafts with concrete slab, with alteration to B1 elevator shaft. Structural scope involves framing concrete and B1 slab on grade. Infilled elevator shaft will be used to house mechanical equipment.

    Applied Apr 14, 2023 · issued Jun 8, 2023 · completed Aug 1, 2025 · Permit 23 134112 HVA

    Closed
  • Plumbing

    Plumbing - Infill of Level 1, 2 and 3 existing elevator shafts with concrete slab, with alteration to B1 elevator shaft. Structural scope involves framing concrete and B1 slab on grade. Infilled elevator shaft will be used to house mechanical equipment.

    Applied Apr 14, 2023 · issued Jun 8, 2023 · completed Jul 18, 2025 · Permit 23 134112 PLB

    Closed
  • Plumbing

    Plumbing - Partial demolition of interior partition walls and cailings, and redesign and reinstallation of interior layout on the 9th floor of the Cardinal Carter Wing, St. Michael's Hospital.

    Applied Apr 4, 2023 · issued Jun 12, 2023 · Permit 23 130531 PLB

    Permit issued
  • Heating and ventilation

    HVAC - Partial demolition of interior partition walls and cailings, and redesign and reinstallation of interior layout on the 9th floor of the Cardinal Carter Wing, St. Michael's Hospital.

    Applied Apr 4, 2023 · issued Jun 12, 2023 · Permit 23 130531 HVA

    Permit issued
  • Addition or alteration · Interior alterations

    Partial demolition of interior partition walls and cailings, and redesign and reinstallation of interior layout on the 9th floor of the Cardinal Carter Wing, St. Michael's Hospital.

    Applied Apr 4, 2023 · issued May 31, 2023 · Permit 23 130531 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Proposed scope of work involves demolition of interior partition walls and ceilings, and redesign and resinstallation of interior layout on the second floor of St. Michael's Hospital, Donnelly Wing.

    Applied Mar 30, 2023 · issued Jun 8, 2023 · completed Apr 2, 2026 · Permit 23 129063 HVA

    Closed
  • Plumbing

    Plumbing - Proposed scope of work involves demolition of interior partition walls and ceilings, and redesign and resinstallation of interior layout on the second floor of St. Michael's Hospital, Donnelly Wing.

    Applied Mar 30, 2023 · issued Jun 8, 2023 · completed Mar 30, 2026 · Permit 23 129063 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposed scope of work involves demolition of interior partition walls and ceilings, and redesign and resinstallation of interior layout on the second floor of St. Michael's Hospital, Donnelly Wing.

    Applied Mar 30, 2023 · issued May 30, 2023 · completed Mar 12, 2026 · Permit 23 129063 BLD

    Closed
  • Plumbing

    REVISION :01 5th floor of the Donnelly Wing, St. Michael's Hospital. Scope of work involves demolition of interior partition walls and ceilings, and redesign and reinstallation of interior layout.Plumbing - Proposal for interior alterations to on 5th floor - Donnelly Wing Central and North Peri Operative. areas in existing hospital.

    Applied Mar 29, 2023 · issued Jul 12, 2023 · Permit 16 175348 PLB (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    REVISION :01 5th floor of the Donnelly Wing, St. Michael's Hospital. Scope of work involves demolition of interior partition walls and ceilings, and redesign and reinstallation of interior layout.Proposal for interior alterations to on 5th floor - Donnelly Wing Central and North Peri Operative. areas in existing hospital.

    Applied Mar 29, 2023 · issued Jun 27, 2023 · completed Aug 28, 2026 · Permit 16 175348 BLD (revision 01)

    Closed
  • Heating and ventilation

    REVISION :01 interior alterations to the 4th floor of the Cardinal Carter Wing, St. Michael's Hospital. Scope of work involves demolition of interior partition walls and ceilings, and redesign and reinstallation of the interior layout.HVAC - Proposal for interior alterations to area of CCW floors 4, 7, 8, 9, 14 abutting the Patient Care Tower (PCT)

    Applied Mar 29, 2023 · issued Jun 6, 2023 · Permit 16 134765 HVA (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    REVISION :01 interior alterations to the 4th floor of the Cardinal Carter Wing, St. Michael's Hospital. Scope of work involves demolition of interior partition walls and ceilings, and redesign and reinstallation of the interior layout.Proposal for interior alterations to area of CCW floors 4, 7, 8, 9, 14 abutting the Patient Care Tower (PCT)

    Applied Mar 29, 2023 · issued Aug 21, 2023 · completed Aug 28, 2026 · Permit 16 134765 BLD (revision 01)

    Closed
  • Plumbing

    REVISION :01 interior alterations to the 4th floor of the Cardinal Carter Wing, St. Michael's Hospital. Scope of work involves demolition of interior partition walls and ceilings, and redesign and reinstallation of the interior layoutPlumbing - Proposal for interior alterations to area of CCW floors 4, 7, 8, 9, 14 abutting the Patient Care Tower (PCT)

    Applied Mar 29, 2023 · issued Jun 7, 2023 · Permit 16 134765 PLB (revision 01)

    Revision issued
  • Heating and ventilation

    REVISION :01 5th floor of the Donnelly Wing, St. Michael's Hospital. Scope of work involves demolition of interior partition walls and ceilings, and redesign and reinstallation of interior layout.HVAC - Proposal for interior alterations to on 5th floor - Donnelly Wing Central and North Peri Operative. areas in existing hospital.

    Applied Mar 29, 2023 · issued Jun 7, 2023 · Permit 16 175348 HVA (revision 01)

    Revision issued
  • Fire and security upgrade · Sprinklers

    Addition of Fire Systems and Sprinklers to unsprinklered areas of Bond and Donnelly Wings, St. Michael's Hospital. Permit is for addition of fire systems and removal and replacement of ceiling areas to facilitate fire system installation.

    Applied Mar 20, 2023 · issued Jun 7, 2024 · completed Sep 15, 2025 · Permit 23 124777 FSU

    Closed
  • Addition or alteration · Interior alterations

    revision: interior alteration and infrastructure upgrades

    Applied Mar 14, 2023 · issued Jun 23, 2023 · Permit 15 249219 BLD (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    interior modifications MEDICAL IMAGING PET CT LEVEL 3, PATIENT CARE TOWER

    Applied Feb 28, 2023 · issued Apr 12, 2023 · completed May 27, 2025 · Permit 23 118392 BLD

    Closed
  • Heating and ventilation

    HVAC - interior modifications MEDICAL IMAGING PET CT LEVEL 3, PATIENT CARE TOWER

    Applied Feb 28, 2023 · issued Apr 18, 2023 · Permit 23 118392 HVA

    Inspections under way
  • Plumbing

    Plumbing - interior modifications MEDICAL IMAGING PET CT LEVEL 3, PATIENT CARE TOWER

    Applied Feb 28, 2023 · issued Apr 18, 2023 · Permit 23 118392 PLB

    Inspections under way
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - St Michael's Hospital - Renovation of Hybrid OR Suite to accommodate new Bi-Plane equipment

    Applied Jan 4, 2023 · issued May 2, 2023 · completed May 2, 2023 · Permit 22 242806 FSU

    Closed
  • Heating and ventilation

    HVAC - St Michael's Hospital - Renovation of Hybrid OR Suite to accommodate new Bi-Plane equipment

    Applied Dec 28, 2022 · issued Feb 7, 2023 · completed Oct 5, 2023 · Permit 22 242806 HVA

    Closed
  • Plumbing

    Plumbing - St Michael's Hospital - Renovation of Hybrid OR Suite to accommodate new Bi-Plane equipment

    Applied Dec 28, 2022 · issued Feb 7, 2023 · Permit 22 242806 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    St Michael's Hospital - Renovation of Hybrid OR Suite to accommodate new Bi-Plane equipment

    Applied Dec 28, 2022 · issued Feb 7, 2023 · completed Aug 25, 2026 · Permit 22 242806 BLD

    Closed
  • Alternative solution

    Application of Spray-Applied Fire-Rated Material to existing archaic structure to achieve 2-hour fire resistance rating

    Applied Dec 12, 2022 · completed Jan 25, 2023 · Permit 22 238553 ALT

    Approved
  • Addition or alteration · Interior alterations

    REV #1-REVISE LAYOUTAbatement and Interior Demolition Permit for St. Michael's Hospital Shuter Wing ***** NO STRUCTURAL WORK - ALL EXITS TO BE MAINTAINED AS PART OF SCOPE*****

    Applied Sep 2, 2022 · issued Nov 4, 2022 · completed Apr 18, 2023 · Permit 22 132587 BLD (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior structural repairs to a portion of the existing third floor level concrete framing of the Bond Wing (Bond Higgings Conference room) at St. Michael's Hospital.

    Applied Aug 10, 2022 · issued Jan 26, 2023 · completed May 31, 2023 · Permit 22 188672 BLD

    Closed
  • Plumbing

    Plumbing - Proposal to construct interior alterations to the shower area on level 7.

    Applied Jul 29, 2022 · issued Nov 1, 2022 · completed Sep 12, 2023 · Permit 22 183764 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to room #7-105 located on the 7th floor level, to renovate the shower room. [St. Michael's Hospital - Walter & Maria Schroeder Brain & Heart Centre - Cardinal Carter / North Wing]

    Applied Jul 29, 2022 · issued Sep 8, 2022 · completed Sep 1, 2023 · Permit 22 183764 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct interior alterations to the shower area on level 7.

    Applied Jul 29, 2022 · issued Nov 1, 2022 · completed Sep 1, 2023 · Permit 22 183764 HVA

    Closed
  • Fire and security upgrade · Fire alarm

    Fire alarm modifications for real time patient locators system and fire alarm upgrade - St Michael;s Hospital

    Applied Jun 20, 2022 · issued Jul 13, 2022 · completed Aug 1, 2023 · Permit 22 164725 FSU

    Closed
  • Plumbing

    Plumbing - Proposal for interior modifications at Cardinal Carter Wing on level 17 of existing patient rooms.

    Applied Jun 15, 2022 · issued Jul 29, 2022 · completed Jun 18, 2026 · Permit 22 162613 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior modifications at Cardinal Carter Wing on level 17 of existing patient rooms.

    Applied Jun 15, 2022 · issued Jul 29, 2022 · completed Jun 11, 2026 · Permit 22 162613 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior modifications at Cardinal Carter Wing on level 17 of existing patient rooms.

    Applied Jun 15, 2022 · issued Jun 30, 2022 · completed Oct 3, 2023 · Permit 22 162613 BLD

    Closed
  • Plumbing

    Plumbing - Bond Wing a new rooftop unit mounted on a new raised steel platform & access stair, rooftop mods & new mechanical ducts into existing sleep lab

    Applied Jun 10, 2022 · issued Aug 5, 2022 · completed May 3, 2023 · Permit 22 159997 PLB

    Closed
  • Heating and ventilation

    HVAC - Bond Wing a new rooftop unit mounted on a new raised steel platform & access stair, rooftop mods & new mechanical ducts into existing sleep lab

    Applied Jun 10, 2022 · issued Aug 5, 2022 · completed Mar 28, 2023 · Permit 22 159997 HVA

    Closed
  • Addition or alteration · Multiple projects

    Bond Wing a new rooftop unit mounted on a new raised steel platform & access stair, rooftop mods & new mechanical ducts into existing sleep lab

    Applied Jun 10, 2022 · issued Aug 5, 2022 · completed May 19, 2023 · Permit 22 159997 BLD

    Closed
  • Heating and ventilation

    HVAC - Abatement and Interior Demolition Permit¿ for St. Michael¿s Hospital Shuter Wing

    Applied Apr 11, 2022 · issued Oct 25, 2022 · completed May 17, 2023 · Permit 22 132587 HVA

    Closed
  • Addition or alteration · Interior alterations

    Abatement and Interior Demolition Permit for St. Michael's Hospital Shuter Wing ***** NO STRUCTURAL WORK - ALL EXITS TO BE MAINTAINED AS PART OF SCOPE*****

    Applied Apr 8, 2022 · issued Apr 14, 2022 · completed Apr 18, 2023 · Permit 22 132587 BLD

    Closed
  • Addition or alteration · Interior alterations

    Rev 06: Interior layout modifications at Cardinal Carter Wing , fire hose cabinet illustrated and then demolished removed to reflect site condition. Revision 05 - interior layout modfication - Health build new walls and revise ceiling accordingly to create a staff safe room in the reception area and a secondary staff only exit corridorPermit 15 259181 Update Modification of Cardinal Carter Wing on level 1 EMERGENCY DEPT Temp Triage & Mental Health

    Applied Mar 2, 2022 · issued May 2, 2022 · completed Aug 11, 2026 · Permit 15 259181 BLD (revision 06)

    Closed
  • Heating and ventilation

    HVAC - Proposal for new interior alterations for new restaurant (Quesada)

    Applied Feb 24, 2022 · issued Apr 7, 2022 · completed Nov 22, 2022 · Permit 22 117165 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for new interior alterations for new restaurant (Quesada)

    Applied Feb 24, 2022 · issued Mar 24, 2022 · Permit 22 117165 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for new interior alterations for new restaurant (Quesada)

    Applied Feb 24, 2022 · issued Mar 2, 2022 · completed Dec 16, 2022 · Permit 22 117165 BLD

    Closed
  • Plumbing · Other

    Replacement of washer / sterilizer, addition of (1) floor drain and addition of (2) backflow preventers

    Applied Jan 3, 2022 · issued Feb 9, 2022 · completed Jan 26, 2023 · Permit 22 100238 PSA

    Closed
  • Addition or alteration · Interior alterations

    Revision 05 - interior layout modfication - Health build new walls and revise ceiling accordingly to create a staff safe room in the reception area and a secondary staff only exit corridorPermit 15 259181 Update Modification of Cardinal Carter Wing on level 1 EMERGENCY DEPT Temp Triage & Mental Health

    Applied Nov 10, 2021 · issued Dec 22, 2021 · completed Aug 11, 2026 · Permit 15 259181 BLD (revision 05)

    Closed
  • Addition or alteration · Interior alterations

    REV 01: Revision to washroom WR7-031 in respect of buried conditions discovered on site.Proposal for interior alterations on the 7th floor of St. Michael's Hospital to create a diagnostic clinic (Structural Heart) for the Structural Health Program. Work outside of this zone is on the 6th floor in respect to plumbing and drainage. Work on the 9th floor (roof level) and 8th floor is to accommodate related air handling equipment and shaft construction to reach the area of renovation.

    Applied Oct 23, 2021 · issued Nov 30, 2021 · completed Sep 10, 2022 · Permit 20 157862 BLD (revision 01)

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to restaurant under 30 "Tim Hortons" Donnelly Wing 1B

    Applied Sep 29, 2021 · issued Oct 28, 2021 · Permit 21 219556 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to restaurant under 30 "Tim Hortons" Donnelly Wing 1B

    Applied Sep 29, 2021 · issued Oct 15, 2021 · completed Jun 15, 2022 · Permit 21 219556 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to restaurant under 30 "Tim Hortons" Donnelly Wing 1B

    Applied Sep 29, 2021 · issued Dec 15, 2021 · Permit 21 219556 HVA

    Inspections under way
  • Fire and security upgrade · Electromagnetic locks

    Proposal to install 1 maglock on level one CCW Building

    Applied Sep 28, 2021 · issued Sep 30, 2021 · completed Jun 15, 2022 · Permit 21 218967 FSU

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations on the 3rd floor, Cardinal Carter Wing, to accommodate new diagnostic imaging equipment.

    Applied Sep 27, 2021 · issued Nov 1, 2021 · Permit 21 217966 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for interior alterations on the 3rd floor, Cardinal Carter Wing, to accommodate new diagnostic imaging equipment.

    Applied Sep 27, 2021 · issued Oct 21, 2021 · completed Jun 11, 2026 · Permit 21 217966 BLD

    Closed
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Proposal for interior alterations to parts of Level 1, Level 2 and Level B1 for exisitng hospital. St Michaels Hospital

    Applied Jul 21, 2021 · issued Dec 14, 2021 · completed Dec 14, 2021 · Permit 21 163235 FSU

    Closed
  • Heating and ventilation · Other

    New generator exhaust vent, diesel fuel oil system upgrade

    Applied Jun 16, 2021 · issued Jul 13, 2021 · Permit 21 171306 MSA

    Permit issued
  • Heating and ventilation

    HVAC - Proposal for interior alterations to parts of Level 1, Level 2 and Level B1 for exisitng hospital. St Michaels Hospital

    Applied May 31, 2021 · issued Jul 21, 2021 · completed Jan 20, 2023 · Permit 21 163235 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to parts of Level 1, Level 2 and Level B1 for exisitng hospital. St Michaels Hospital

    Applied May 31, 2021 · issued Jul 21, 2021 · completed Apr 14, 2023 · Permit 21 163235 BLD

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to parts of Level 1, Level 2 and Level B1 for exisitng hospital. St Michaels Hospital

    Applied May 31, 2021 · issued Jul 21, 2021 · completed May 12, 2023 · Permit 21 163235 PLB

    Closed
  • Addition or alteration · Interior alterations

    Revision 01 - add 2 and modify 2 electronmagnetic locking devices on levels 16 and 17 for Ante and Clean room doors and south stair doors.Proposal for interior alterationson level 16 & 17 of existing hospital

    Applied May 12, 2021 · completed Jun 1, 2021 · Permit 20 122130 BLD (revision 01)

    Cancelled
  • Fire and security upgrade · Electromagnetic locks

    Revision 01: added maglocks to level 17 on doors D17-730 & D17-740

    Applied May 12, 2021 · issued Jun 1, 2021 · completed Dec 14, 2021 · Permit 20 204631 FSU (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    REV 03: Updates Interior Modification of Donnelly Wing on level 1B Health Records.REV - 02 - revised work boundary - removal of future retail shell space

    Applied Apr 29, 2021 · issued Jul 21, 2021 · completed Sep 1, 2023 · Permit 15 171941 BLD (revision 03)

    Closed
  • Heating and ventilation

    REV 02: Updates Interior Modification of Donnelly Wing on level 1B Health RecordsHVAC REV - 01 Interior alteration to the health and records centre for future tenant fit up on level 1 of the Donnelly Wing. Removal and upgrades to the building envelope and re cladding on the walls facing Queen Street.

    Applied Apr 29, 2021 · issued May 26, 2021 · Permit 15 171941 HVA (revision 02)

    Revision issued
  • Plumbing

    REV 02 : Updates Interior Modification of Donnelly Wing on level 1B Health RecordsREV - 01 Interior alteration to the health and records centre for future tenant fit up on level 1 of the Donnelly Wing. Removal and upgrades to the building envelope and re cladding on the walls facing Queen Street.

    Applied Apr 29, 2021 · issued May 26, 2021 · Permit 15 171941 PLB (revision 02)

    Revision issued
  • Heating and ventilation

    Permit 15 259181 Update Modification of Cardinal Carter Wing on level 1 EMERGENCY DEPT Temp Triage & Mental HealthHVAC - Applicant proposed interior alteration to the ground floor of the Cardinal Carter Wing converting it to a Emergency Dept space. interior renovation to level B1.

    Applied Apr 26, 2021 · issued Jun 17, 2021 · Permit 15 259181 HVA (revision 01)

    Revision issued
  • Plumbing

    Permit 15 259181 Update Modification of Cardinal Carter Wing on level 1 EMERGENCY DEPT Temp Triage & Mental HealthPlumbing - Applicant proposed interior alteration to the ground floor of the Cardinal Carter Wing converting it to a Emergency Dept space. interior renovation to level B1.

    Applied Apr 26, 2021 · issued Jun 17, 2021 · Permit 15 259181 PLB (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    Permit 15 259181 Update Modification of Cardinal Carter Wing on level 1 EMERGENCY DEPT Temp Triage & Mental Health

    Applied Apr 24, 2021 · issued Oct 15, 2021 · completed Aug 11, 2026 · Permit 15 259181 BLD (revision 04)

    Closed
  • Plumbing · Other

    Proposal to re-open existing reserved wall opening for the installation of addition pass-through sterilizer in MDRD. Relocate an existing primer line and an emergency eyewash to facilitate sterilizer installation. Connect existing rough-in services (domestic cold water, domestic hot water, RO water, compressed air, steam and electricity) to new sterilizer.

    Applied Apr 7, 2021 · issued Apr 26, 2021 · completed Feb 7, 2023 · Permit 21 137015 PSA

    Closed
  • Addition or alteration · Interior alterations

    REV01: Sprinkler & Standpipe Alterations

    Applied Mar 31, 2021 · issued May 14, 2021 · completed Sep 1, 2023 · Permit 16 248494 BLD (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    REV 03-Sprinkler & Standpipe Alterations

    Applied Mar 31, 2021 · issued May 19, 2021 · completed Aug 11, 2026 · Permit 15 259181 BLD (revision 03)

    Closed
  • Heating and ventilation

    HVAC - Proposal for renovations to the existing operating room to install new equipment.

    Applied Mar 29, 2021 · issued May 7, 2021 · completed Apr 25, 2022 · Permit 21 133388 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for renovations to the existing operating room to install new equipment.

    Applied Mar 29, 2021 · issued May 7, 2021 · completed Apr 20, 2022 · Permit 21 133388 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal for renovations to the existing operating room to install new equipment.

    Applied Mar 29, 2021 · issued Apr 1, 2021 · completed Jun 11, 2026 · Permit 21 133388 BLD

    Closed
  • Addition or alteration · Interior alterations

    REVISION - revise Vital Lighting within Cardiac Catherization Suite #1 (7th Floor) Cardinal Carter WingProposal for interior alteration for existing hospital to improve and create new interventional radiology procedure spaces and clinical support, including some ambulatory clinic spaces. Floor areas within the Cath Lab suite at Level 7, Prep/Recovery at Level 7 and procedure rooms within the Bi-Plane suite at Level 3 will include Special Care and Treatment areas. Other areas, Structural Heart and Echocardiogram will constitute Ambulatory Care spaces (Group D).

    Applied Mar 22, 2021 · issued May 10, 2021 · completed Aug 25, 2026 · Permit 19 264166 BLD (revision 01)

    Closed
  • Fire and security upgrade · Sprinklers

    REV #1-REVISE LAYOUTProposed sprinkler installation to the 16th and 17th floors of an existing hosptial. *St. Michael's Hospital*

    Applied Feb 16, 2021 · issued Mar 22, 2021 · completed Jul 2, 2021 · Permit 20 192533 FSU (revision 01)

    Closed
  • Fire and security upgrade · Sprinklers

    Fire sprinkler system

    Applied Feb 11, 2021 · issued Mar 8, 2021 · completed Sep 10, 2022 · Permit 21 115571 FSU

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations on the 7th floor of St. Michael's Hospital to create a diagnostic clinic (Structural Heart) for the Structural Health Program. Work outside of this zone is on the 6th floor in respect to plumbing and drainage. Work on the 9th floor (roof level) and 8th floor is to accommodate related air handling equipment and shaft construction to reach the area of renovation.

    Applied Jan 7, 2021 · issued Jan 7, 2021 · completed Sep 23, 2022 · Permit 20 157862 PLB

    Closed
  • Alternative solution

    Fire shutters will be used as closures in the fire separation around the convenience stair opening. The alternative solution is intended to address exceeding the maximum size limits per obc 3.1.8.6.(2) for openings protected by closures (fire shutters) by proposing to install closely spaced sprinklers on the floor side of the fire shutters as a compensatory measure.

    Applied Dec 15, 2020 · completed Dec 17, 2020 · Permit 20 229280 ALT

    Approved
  • Plumbing

    Revision # 03 - To the Plumbing layout in the existing Hospital.Revision #02 - Changes to add an East side addition.Revise 01- Plumbing - PLB and HVAC Permit Update to new patient care tower of St Mike's Hospital as per inspector's request

    Applied Dec 14, 2020 · issued Jan 29, 2021 · completed May 18, 2022 · Permit 15 113674 PLB (revision 03)

    Closed
  • Addition or alteration · Multiple projects

    Revision # 05 - Is to incorporate changes to the 16th & 17th floors of the existing Hospital approved under AS for oversized fire shutters 20-229280-AS

    Applied Dec 14, 2020 · issued Dec 18, 2020 · completed Aug 1, 2024 · Permit 15 113674 BLD (revision 05)

    Closed
  • Heating and ventilation

    Revision # 04 - To the HVAC layout in the existing Hospital.Revision to 04 - SPRINKLER PERMIT REVISION (15 - 113674)HVAC - Proposal to construct a 17 storey tower addition to St Michael's Hospital (corner of Queen St and Victoria St)

    Applied Dec 14, 2020 · issued Jan 25, 2021 · completed May 16, 2022 · Permit 15 113674 HVA (revision 05)

    Closed
  • Addition or alteration · Interior alterations

    Proposed renovations to existing laboratory space for hvac upgrdes and spce planning.

    Applied Nov 16, 2020 · issued Dec 3, 2020 · completed Aug 19, 2026 · Permit 20 218824 BLD

    Closed
  • Plumbing

    Plumbing - Proposed renovations to existing laboratory space for hvac upgrdes and spce planning.

    Applied Nov 16, 2020 · issued Dec 11, 2020 · Permit 20 218824 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposed renovations to existing laboratory space for hvac upgrdes and spce planning.

    Applied Nov 16, 2020 · issued Jan 27, 2021 · Permit 20 218824 HVA

    Inspections under way
  • Fire and security upgrade · Sprinklers

    Proposed sprinkler installation on the 3rd and 7th floor of the existing hospital building. *St Michael's Hospital*

    Applied Oct 16, 2020 · issued Oct 21, 2020 · completed Aug 12, 2025 · Permit 20 207600 FSU

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Proposal to add (2) and modify (2) Electromagnetic Locking Devices on Levels 16 and 17 for Ante Room and Clean Room doors and South Stair doors. These are part of Existing Building Permit 20-122130 BLD 00 BA.

    Applied Oct 8, 2020 · issued Oct 30, 2020 · completed Dec 14, 2021 · Permit 20 204631 FSU

    Closed
  • Fire and security upgrade · Sprinklers

    Proposed sprinkler installation to the 16th and 17th floors of an existing hosptial. *St. Michael's Hospital*

    Applied Sep 11, 2020 · issued Oct 19, 2020 · completed Jul 2, 2021 · Permit 20 192533 FSU

    Closed
  • Addition or alteration · Interior alterations

    REVISION 4 - to include structural details for hvac suport and new buildng openingsProposal for interior alterations to 2nd floor rooms 2-041 & 2-081 and level 5 rooms 5-046 in existing hospital - 'St Michaels Hospital"

    Applied Jul 23, 2020 · issued Sep 21, 2020 · completed Aug 11, 2025 · Permit 17 111173 BLD (revision 04)

    Closed
  • Fire and security upgrade · Sprinklers

    Revision 01Sprinklers - Treatment and research center for MS Levels 16 and 17

    Applied Jul 7, 2020 · issued Jul 10, 2020 · completed May 12, 2021 · Permit 20 155212 FSU (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposed interior alterations on 6th floor.

    Applied Jun 18, 2020 · issued Dec 22, 2020 · completed Mar 28, 2023 · Permit 20 157862 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations on the 7th floor of St. Michael's Hospital to create a diagnostic clinic (Structural Heart) for the Structural Health Program. Work outside of this zone is on the 6th floor in respect to plumbing and drainage. Work on the 9th floor (roof level) and 8th floor is to accommodate related air handling equipment and shaft construction to reach the area of renovation.

    Applied Jun 18, 2020 · issued Dec 22, 2020 · completed Sep 10, 2022 · Permit 20 157862 BLD

    Closed
  • Fire and security upgrade · Sprinklers

    Sprinklers - Treatment and research center for MS Levels 16 and 17

    Applied Jun 11, 2020 · issued Jun 19, 2020 · completed May 12, 2021 · Permit 20 155212 FSU

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterationson level 16 & 17 of existing hospital

    Applied Mar 4, 2020 · issued Jun 18, 2020 · completed Dec 16, 2021 · Permit 20 122130 BLD

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterationson levvel 16 & 17 of existing hospital

    Applied Mar 4, 2020 · issued Jun 18, 2020 · completed Sep 22, 2021 · Permit 20 122130 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterationson levvel 16 & 17 of existing hospital

    Applied Mar 4, 2020 · issued Jun 18, 2020 · completed Dec 16, 2021 · Permit 20 122130 HVA

    Closed
  • Addition or alteration · Interior alterations

    REVISION 3 - reissued electrical drawingsProposed interior alterations to renovate services required for Cardiac Catheterization Lab located in west wing.

    Applied Mar 3, 2020 · issued Apr 17, 2020 · completed Aug 6, 2026 · Permit 18 272559 BLD (revision 03)

    Closed
  • Heating and ventilation

    HVAC - RENOVATION OF EXISTING PROCEDURE ROOM No.5-086 TO ACCOMMODATE NEW MEDICAL EQUIPMENT (REPLACEMENT OF SIMILAR EQUIPMENT) AND NEW FAN COIL IN ELECTRICAL ROOM 5-106A

    Applied Feb 24, 2020 · issued Apr 16, 2020 · completed Dec 23, 2020 · Permit 20 118306 HVA

    Closed
  • Addition or alteration · Interior alterations

    RENOVATION OF EXISTING PROCEDURE ROOM No.5-086 TO ACCOMMODATE NEW MEDICAL EQUIPMENT (REPLACEMENT OF SIMILAR EQUIPMENT) AND NEW FAN COIL IN ELECTRICAL ROOM 5-106A

    Applied Feb 24, 2020 · issued Mar 23, 2020 · completed Jan 26, 2021 · Permit 20 118306 BLD

    Closed
  • Plumbing

    Plumbing - PROPOSAL TO REMOVIE ONE SINK. RENOVATION OF EXISTING PROCEDURE ROOM No.5-086 TO ACCOMMODATE NEW MEDICAL EQUIPMENT (REPLACEMENT OF SIMILAR EQUIPMENT) AND NEW FAN COIL IN ELECTRICAL ROOM 5-106A

    Applied Feb 24, 2020 · issued Apr 16, 2020 · completed Dec 14, 2020 · Permit 20 118306 PLB

    Closed
  • Addition or alteration · Multiple projects

    REV04: changes to sprinklers

    Applied Feb 20, 2020 · issued Mar 3, 2020 · completed Aug 1, 2024 · Permit 15 113674 BLD (revision 04)

    Closed
  • Heating and ventilation

    Revision to 04 - SPRINKLER PERMIT REVISION (15 - 113674)HVAC - Proposal to construct a 17 storey tower addition to St Michael's Hospital (corner of Queen St and Victoria St)

    Applied Jan 22, 2020 · completed Feb 21, 2020 · Permit 15 113674 HVA (revision 04)

    Cancelled
  • Plumbing

    Plumbing - Proposal for interior alterations to portions of level 1 and 2 at St. Michael's hospital.

    Applied Dec 27, 2019 · issued Feb 13, 2020 · Permit 19 265000 PLB

    Permit issued
  • Heating and ventilation

    HVAC - Proposal for interior alterations to portions of level 1 and 2 at St. Michael's hospital.

    Applied Dec 27, 2019 · issued Feb 13, 2020 · Permit 19 265000 HVA

    Permit issued
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to portions of level 1 and 2 at St. Michael's hospital. To access areas with asbestos to be abated.

    Applied Dec 27, 2019 · issued Feb 13, 2020 · completed Aug 11, 2025 · Permit 19 265000 BLD

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alteration for existing hospital to improve and create new interventional radiology procedure spaces and clinical support, including some ambulatory clinic spaces. Floor areas within the Cath Lab suite at Level 7, Prep/Recovery at Level 7 and procedure rooms within the Bi-Plane suite at Level 3 will include Special Care and Treatment areas. Other areas, Structural Heart and Echocardiogram will constitute Ambulatory Care spaces (Group D).

    Applied Dec 23, 2019 · issued Feb 26, 2020 · completed Aug 25, 2026 · Permit 19 264166 BLD

    Closed
  • Plumbing

    Plumbing - Proposal for interior alteration for existing hospital to improve and create new interventional radiology procedure spaces and clinical support, including some ambulatory clinic spaces. Floor areas within the Cath Lab suite at Level 7, Prep/Recovery at Level 7 and procedure rooms within the Bi-Plane suite at Level 3 will include Special Care and Treatment areas. Other areas, Structural Heart and Echocardiogram will constitute Ambulatory Care spaces (Group D).

    Applied Dec 23, 2019 · issued Feb 26, 2020 · Permit 19 264166 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for interior alteration for existing hospital to improve and create new interventional radiology procedure spaces and clinical support, including some ambulatory clinic spaces. Floor areas within the Cath Lab suite at Level 7, Prep/Recovery at Level 7 and procedure rooms within the Bi-Plane suite at Level 3 will include Special Care and Treatment areas. Other areas, Structural Heart and Echocardiogram will constitute Ambulatory Care spaces (Group D).

    Applied Dec 23, 2019 · issued Feb 26, 2020 · Permit 19 264166 HVA

    Inspections under way
  • Heating and ventilation

    (Related to 19 - 250 241 BLD 00 BA)- DIVIDE EXISTING CARBON DIOXIDE STORAGE ROOM INTO TWO LAB GAS STORAGE ROOMS:ONE FOR LAB OXYGEN STORAGE, THE OTHER ONE FOR CARBON DIOXIDE AND NITROGEN.- REVISE VENTILATION, FIRE PROTECTION TO SUITE.- PROVIDE NEW LAB GAS STORAGE AND DISTRIBUTION SYSTEMS TO SERVE EXISTING LAB.

    Applied Nov 18, 2019 · issued Jan 2, 2020 · Permit 19 250261 HVA

    Permit issued
  • Addition or alteration · Interior alterations

    - divide existing carbon dioxide storage room into two lab gas storage rooms:one for lab oxygen storage, the other one for carbon dioxide and nitrogen.- revise ventilation, fire protection to suite.- provide new lab gas storage and distribution systems to serve existing lab.

    Applied Nov 18, 2019 · issued Nov 26, 2019 · Permit 19 250241 BLD

    Permit issued
  • Heating and ventilation

    REV 01 - Changes to scope of work on CCW level 8

    Applied Nov 15, 2019 · issued Nov 22, 2019 · Permit 16 216013 HVA (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    REV 01 - Changes to scope of work on CCW level 8

    Applied Nov 15, 2019 · issued Nov 29, 2019 · Permit 16 216013 BLD (revision 01)

    Revision issued
  • Addition or alteration · Multiple projects

    Revision #03 - changes to B1 loading dock/garbage Rm

    Applied Nov 15, 2019 · issued Dec 12, 2019 · completed Aug 1, 2024 · Permit 15 113674 BLD (revision 03)

    Closed
  • Addition or alteration · Interior alterations

    Revision 02: Revision to permit 18-272559 BLD 01 to alter existing fire sprinkler system.Revision 01Proposed interior alterations to renovate services required for Cardiac Catherterization Lab located in west wing.

    Applied Oct 24, 2019 · issued Dec 11, 2019 · completed Aug 6, 2026 · Permit 18 272559 BLD (revision 02)

    Closed
  • Heating and ventilation

    Revision to HVAC Permit Update to new patient care tower of St Mike's Hospital as per inspector's requestHVAC - Proposal to construct a 17 storey tower addition to St Michael's Hospital (corner of Queen St and Victoria St)

    Applied Oct 18, 2019 · issued Nov 22, 2019 · completed May 16, 2022 · Permit 15 113674 HVA (revision 03)

    Closed
  • Addition or alteration · Interior alterations

    Revision # 04 - Interior renovation ramp addition as per inspector request 7th floor Donnelly Wing . ARCHITECTURAL revision only.Interior renovation layout change to 8th floor Donnelly Wing to reinstate previously demolished pre-fabricated construction office trailers

    Applied Jul 23, 2019 · issued Aug 6, 2019 · completed Jul 30, 2026 · Permit 15 117112 BLD (revision 04)

    Closed
  • Addition or alteration · Interior alterations

    Revision 01Proposed interior alterations to renovate services required for Cardiac Catherterization Lab located in west wing.

    Applied Jul 16, 2019 · issued Aug 28, 2019 · completed Aug 6, 2026 · Permit 18 272559 BLD (revision 01)

    Closed
  • Heating and ventilation

    Revision 01 - HVAC - Proposed interior alterations to renovate services required for Cardiac Catherterization Lab located in west wing.

    Applied Jul 16, 2019 · issued Aug 21, 2019 · completed Feb 28, 2020 · Permit 18 272559 HVA (revision 01)

    Closed
  • Plumbing

    Revision 01Plumbing - Proposed interior alterations to renovate services required for Cardiac Catherterization Lab located in west wing.

    Applied Jul 16, 2019 · issued Aug 21, 2019 · Permit 18 272559 PLB (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    Revision 03 to permit 17-111173 BLD 02 to include structural details for new masonry openings. Revision 02 for the Renovation of existing spaces on Levels 2 and 5 of the hospital including new partitions and finishes, new and relocated lab equipment, modified and new mechanical and electrical systems, new roof-mounted exhaust fan. Fire Protection Sprinkler SystemProposal for interior alterations to 2nd floor rooms 2-041 & 2-081 and level 5 rooms 5-046 in existing hospital - 'St Michaels Hospital"

    Applied Jun 4, 2019 · issued Jul 19, 2019 · completed Aug 11, 2025 · Permit 17 111173 BLD (revision 03)

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Proposal to install 122 mag locks on various floors in existing hospital.

    Applied May 13, 2019 · issued Dec 13, 2019 · completed Jul 16, 2025 · Permit 19 153372 FSU

    Closed
  • Plumbing

    Revision #02 - Changes to add an East side addition.Revise 01- Plumbing - PLB and HVAC Permit Update to new patient care tower of St Mike's Hospital as per inspector's request

    Applied Apr 5, 2019 · issued May 23, 2019 · completed May 18, 2022 · Permit 15 113674 PLB (revision 02)

    Closed
  • Addition or alteration · Multiple projects

    Revision #02 - Changes to add an East side addition.Revision to plans.Proposal to construct a 17 storey tower addition to St Michael's Hospital (corner of Queen St and Victoria St)

    Applied Apr 5, 2019 · issued Jun 24, 2019 · completed Aug 1, 2024 · Permit 15 113674 BLD (revision 02)

    Closed
  • Plumbing

    Plumbing - Proposed interior alterations to renovate services required for Cardiac Catherterization Lab located in west wing.

    Applied Dec 28, 2018 · issued May 23, 2019 · Permit 18 272559 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposed interior alterations to renovate services required for Cardiac Catherterization Lab located in west wing.

    Applied Dec 28, 2018 · issued May 23, 2019 · completed Feb 28, 2020 · Permit 18 272559 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposed interior alterations to renovate services required for Cardiac Catherterization Lab located in west wing.

    Applied Dec 28, 2018 · issued Apr 24, 2019 · completed Aug 6, 2026 · Permit 18 272559 BLD

    Closed
  • Designated structure · Sign building permit related

    Proposal to erect and display two non-illuminated projecting signs on the westerly elevation, each measuring 4.06 metres by 0.76 metres at a height of 8.50 metres. See associated sign variance application No. 18-211942 (FP-18-00140) **ST MICHAEL'S HOSPITAL**

    Applied Dec 12, 2018 · issued Dec 18, 2018 · completed Jul 26, 2019 · Permit 18 267743 DST

    Closed
  • Designated structure · Sign building permit related

    To erect and display two overhanging structure signs and two wall signs, all of which are non-illuminated and displaying static copy. The two overhanging structure signs are to be erected on the southerly elevation, along with the one of the wall signs that is erected on a westerly facing wall of the same elevation. The other wall sign is to be erected on the fifth storey of the westerly elevation, and was the subject of sign variance application No. 17-229299). ***ST MICHAEL'S HOSPITAL***

    Applied Sep 21, 2018 · issued Nov 19, 2018 · completed Dec 30, 2021 · Permit 18 229751 DST

    Closed
  • Heating and ventilation

    HVAC - Proposed interior alterations to the existing imaging suite with changerooms to create a new multi-purpose suite with control room within an existing hospital. *St. Michael's Hospital*

    Applied Aug 31, 2018 · issued Nov 7, 2018 · Permit 18 218376 HVA

    Permit issued
  • Addition or alteration · Interior alterations

    Proposed interior alterations to the existing imaging suite with changerooms to create a new multi-purpose suite with control room within an existing hospital. *St. Michael's Hospital*

    Applied Aug 31, 2018 · issued Sep 20, 2018 · Permit 18 218376 BLD

    Permit issued
  • Plumbing

    Revise 01- Plumbing - PLB and HVAC Permit Update to new patient care tower of St Mike's Hospital as per inspector's request

    Applied Jul 17, 2018 · issued Feb 7, 2019 · completed May 18, 2022 · Permit 15 113674 PLB (revision 01)

    Closed
  • Heating and ventilation

    Revision to PLB and HVAC Permit Update to new patient care tower of St Mike's Hospital as per inspector's requestHVAC - Proposal to construct a 17 storey tower addition to St Michael's Hospital (corner of Queen St and Victoria St)

    Applied Jul 17, 2018 · completed Aug 9, 2018 · Permit 15 113674 HVA (revision 02)

    Cancelled
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to levels 1, 2, and 6 within existing hospital "St Michael's Hospital"

    Applied Jul 9, 2018 · completed Nov 2, 2020 · Permit 18 191122 BLD

    Cancelled
  • Plumbing

    Plumbing - Proposal for interior alterations to levels 1, 2, and 6 within existing hospital "St Michael's Hospital"

    Applied Jul 9, 2018 · completed Nov 2, 2020 · Permit 18 191122 PLB

    Cancelled
  • Heating and ventilation

    HVAC - Proposal for interior alterations to levels 1, 2, and 6 within existing hospital "St Michael's Hospital"

    Applied Jul 9, 2018 · completed Nov 2, 2020 · Permit 18 191122 HVA

    Cancelled
  • Fire and security upgrade · Electromagnetic locks

    REV 03: As per request of inspector drawing cleanup, no changes since last revision.

    Applied Apr 6, 2018 · issued May 28, 2018 · completed Jun 5, 2026 · Permit 15 259215 FSU (revision 03)

    Closed
  • Addition or alteration · Interior alterations

    Revision 02 for the Renovation of existing spaces on Levels 2 and 5 of the hospital including new partitions and finishes, new and relocated lab equipment, modified and new mechanical and electrical systems, new roof-mounted exhaust fan. Fire Protection Sprinkler SystemProposal for interior alterations to 2nd floor rooms 2-041 & 2-081 and level 5 rooms 5-046 in existing hospital - 'St Michaels Hospital"

    Applied Mar 15, 2018 · issued May 16, 2018 · completed Aug 11, 2025 · Permit 17 111173 BLD (revision 02)

    Closed
  • Heating and ventilation

    HVAC Revise -01 Renovation of existing spaces on Levels 2 and 5 of the hospital including new partitions and finishes, new and relocated lab equipment, modified and new mechanical and electrical systems, new roof-mounted exhaust fan. Proposal for interior alterations to 2nd floor rooms 2-041 & 2-081 and level 5 rooms 5-046 in existing hospital - 'St Michaels Hospital"

    Applied Mar 15, 2018 · issued Jun 27, 2018 · Permit 17 111173 HVA (revision 01)

    Revision issued
  • Addition or alteration · Multiple projects

    Revision to plans.Proposal to construct a 17 storey tower addition to St Michael's Hospital (corner of Queen St and Victoria St)

    Applied Sep 29, 2017 · issued May 28, 2018 · completed Aug 1, 2024 · Permit 15 113674 BLD (revision 01)

    Closed
  • Heating and ventilation

    Revision to plans.HVAC - Proposal to construct a 17 storey tower addition to St Michael's Hospital (corner of Queen St and Victoria St)

    Applied Sep 29, 2017 · issued Apr 10, 2018 · completed May 16, 2022 · Permit 15 113674 HVA (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    Revision 02: Revised light fixtures and exit signs at central stair exit and North elevator lobby. Updated exit direction and travel distance from North elevator lobby. Updated fire rating to 1hr at East and South walls of Detergent Storage Rm B1-002B East and South walls.Revision 1: changes to sprinkler layoutInterior alterations to the ground floor (LEVEL 1) and basement (B1) of existing Hospital (Cardinal Carter Wing) converting area to an Emergency Dept space. Removal of existing exterior ramp and addition along the west lot line in conjunction with interior alterations.

    Applied Sep 18, 2017 · issued Nov 2, 2017 · completed Aug 11, 2026 · Permit 15 259181 BLD (revision 02)

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Revision # 02 - By inspector request, co-ordination issued not reflected on all previous drawings. 1 new Mag lock in Cardinal Carter Wing on level 1, Door: B1-043 A&CRevision # 01 - To change the location of maglocks.Electromagnetic Locks for Hospital. Applicant proposed interior alteration to the ground floor of the Cardinal Carter Wing converting it to a Emergency Dept space. interior renovation to level B1.

    Applied Aug 28, 2017 · issued Oct 2, 2017 · completed Jun 5, 2026 · Permit 15 259215 FSU (revision 02)

    Closed
  • Addition or alteration · Interior alterations

    Revision 01: Fire Protection Sprinkler SystemProposal for interior alterations to 2nd floor rooms 2-041 & 2-081 and level 5 rooms 5-046 in existing hospital - 'St Michaels Hospital"

    Applied Aug 25, 2017 · issued Aug 30, 2017 · completed Aug 11, 2025 · Permit 17 111173 BLD (revision 01)

    Closed
  • Demolition

    Proposal to demolish 6 storey Shuter Wing of existing hospital - "St Michaels Hospital"See related building permit 16 260971 BLD.

    Applied Aug 10, 2017 · issued Nov 9, 2022 · completed Sep 1, 2023 · Permit 17 214244 DEM

    Closed
  • Designated structure · Sign building permit related

    In conjunction with a multi-storey hospital on the premises, proposal to erect and display one illuminated overhanging structure sign displaying static copy, located on the first storey south elevation. The proposed sign is 0.78 metres vertically by 9.588 metres horizontally at a height of 4.3 metres above grade.**ST. MICHAEL'S HOSPITAL**

    Applied Jul 31, 2017 · issued Sep 28, 2017 · completed Oct 2, 2019 · Permit 17 208453 DST

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Scope of Permit:Installation of 2 maglocks and associated devices (pull stations, sigange, card readers as highlighted in accordance with Sentence 3.4.6.16.(4) of Division B o the 2012 Ontario Building Code.Construction of temporary doors and partitions subject to separate permit 17 163056 BLD 00 BA.

    Applied May 24, 2017 · issued Aug 24, 2017 · completed Sep 20, 2017 · Permit 17 165220 FSU

    Closed
  • Addition or alteration · Interior alterations

    Proposal to construct a new wall and door in the Cardinal Carter Wing on level 1 in the existing hospital.

    Applied May 19, 2017 · issued Aug 1, 2017 · Permit 17 163056 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - proposal for interior alterations to b1 and b2 level.

    Applied Apr 28, 2017 · issued Jul 11, 2017 · Permit 17 150933 HVA

    Permit issued
  • Addition or alteration · Interior alterations

    proposal for interior alterations to b1 and b2 level.

    Applied Apr 28, 2017 · issued Jul 11, 2017 · Permit 17 150933 BLD

    Permit issued
  • Addition or alteration · Interior alterations

    Rev 01 - Rooftop structural AHU fram & fire separation updateProposal for interior alterations to Level 5, Bond Wing in existing hospital - "St Michael's Hospital"

    Applied Feb 17, 2017 · issued Mar 16, 2017 · completed Jul 5, 2017 · Permit 16 124274 BLD (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to 2nd floor rooms 2-041 & 2-081 and level 5 rooms 5-046 in existing hospital - 'St Michaels Hospital"

    Applied Jan 31, 2017 · issued Mar 10, 2017 · completed Aug 11, 2025 · Permit 17 111173 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to 2nd floor rooms 2-041 & 2-081 and level 5 rooms 5-046 in existing hospital - 'St Michaels Hospital"

    Applied Jan 31, 2017 · issued Jun 13, 2017 · Permit 17 111173 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal for interior alterations to 2nd floor rooms 2-041 & 2-081 and level 5 rooms 5-046 in existing hospital - 'St Michaels Hospital"

    Applied Jan 31, 2017 · issued Jun 13, 2017 · Permit 17 111173 PLB

    Inspections under way
  • Fire and security upgrade · Electromagnetic locks

    Installation of ONE (1) New MAG LOCK on the 16th floor at the Cardinal Carter Wing - PCT interface.

    Applied Jan 18, 2017 · issued Feb 3, 2017 · Permit 17 105928 FSU

    Permit issued
  • Alternative solution

    Alternative solution for operation doors to have a clearance of less than 300mm as per OBC Clause 3.8.3.3

    Applied Dec 20, 2016 · completed Mar 8, 2017 · Permit 16 269080 ALT

    Approved
  • Plumbing

    Plumbing - Proposal to construct a 2-storey addition to existing hospital. Scope of work includes demolishing existing 6 storey Shuter Wing and constructing new Shuter Wing) See STE 16-148963.

    Applied Dec 6, 2016 · issued Aug 26, 2024 · Permit 16 260971 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to construct a 2-storey addition to existing hospital. Scope of work includes demolishing existing 6 storey Shuter Wing and constructing new Shuter Wing) See STE 16-148963.

    Applied Dec 6, 2016 · issued Mar 18, 2024 · Permit 16 260971 HVA

    Inspections under way
  • Fire and security upgrade · Electromagnetic locks

    Proposal to instal 5 new maglocks

    Applied Nov 15, 2016 · issued Dec 1, 2016 · completed Mar 16, 2020 · Permit 16 251284 FSU

    Closed
  • Addition or alteration · Interior alterations

    Revision 1: changes to sprinkler layoutInterior alterations to the ground floor (LEVEL 1) and basement (B1) of existing Hospital (Cardinal Carter Wing) converting area to an Emergency Dept space. Removal of existing exterior ramp and addition along the west lot line in conjunction with interior alterations.

    Applied Nov 15, 2016 · issued Nov 28, 2016 · completed Aug 11, 2026 · Permit 15 259181 BLD (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations on level 1 Donnelley wing for fit up of public washrooms, universal washrooms, open interaction area and shelled future tenant spaces.

    Applied Nov 8, 2016 · issued Dec 21, 2016 · completed Sep 1, 2023 · Permit 16 248494 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations on level 1 Donnelley wing for fit up of public washrooms, universal washrooms, open interaction area and shelled future tenant spaces.

    Applied Nov 8, 2016 · issued Dec 21, 2016 · completed Sep 23, 2025 · Permit 16 248494 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations on level 1 Donnelley wing for fit up of public washrooms, universal washrooms, open interaction area and shelled future tenant spaces.

    Applied Nov 8, 2016 · issued Dec 21, 2016 · Permit 16 248494 PLB

    Inspections under way
  • Fire and security upgrade · Electromagnetic locks

    REV03- Relocation of electromagnetic lock on 8th floor - Donnelley Wing. Revision # 02 - For 2 additional mag locks on the 7ths floor of the existing hospital.REV01- Mag lock revisions.

    Applied Oct 21, 2016 · issued Nov 16, 2016 · completed Jun 4, 2026 · Permit 15 117144 FSU (revision 04)

    Closed
  • Addition or alteration · Interior alterations

    REV - 02 - revised work boundary - removal of future retail shell space

    Applied Oct 17, 2016 · issued Oct 31, 2016 · completed Sep 1, 2023 · Permit 15 171941 BLD (revision 02)

    Closed
  • Addition or alteration · Interior alterations

    Revision 1: Revision to remove the exterior stairsInterior alteration on level 1 Shuter Wing east to facilitate temporary fit - up for the accommodation of medical equipments and storage MDRD operations.

    Applied Oct 3, 2016 · issued Oct 17, 2016 · completed Mar 29, 2017 · Permit 16 143485 BLD (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    Revision # 03 - Interior renovation layout change to 8th floor Donnelly Wing to reinstate previously demolished pre-fabricated construction office trailers

    Applied Sep 29, 2016 · issued Nov 23, 2016 · completed Jul 30, 2026 · Permit 15 117112 BLD (revision 03)

    Closed
  • Addition or alteration · Interior alterations

    Proposed interior alterations to the hospital on floors 7,8,9,14

    Applied Aug 31, 2016 · issued Sep 22, 2016 · Permit 16 216013 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposed interior alterations to the hospital on floors 7,8,9,14

    Applied Aug 31, 2016 · issued Oct 11, 2016 · Permit 16 216013 HVA

    Permit issued
  • Plumbing

    Plumbing - Proposed interior alterations to the hospital on floors 7,8,9,14

    Applied Aug 31, 2016 · issued Oct 11, 2016 · Permit 16 216013 PLB

    Inspections under way
  • Fire and security upgrade · Electromagnetic locks

    Proposal to install 2 electromagnetic locks on the 5th floor, Bond Wing Inpatient Clinic. 'St. Michael's Hospital'

    Applied Jun 27, 2016 · issued Aug 29, 2016 · completed Jul 5, 2017 · Permit 16 180922 FSU

    Closed
  • Heating and ventilation

    HVAC - Applicant proposed interior alteration on the 2nd floor of the existing building

    Applied Jun 17, 2016 · issued Apr 24, 2025 · Permit 16 176334 HVA

    Permit issued
  • Plumbing

    Plumbing - Applicant proposed interior alteration on the 2nd floor of the existing building

    Applied Jun 17, 2016 · issued Apr 24, 2025 · Permit 16 176334 PLB

    Permit issued
  • Heating and ventilation

    HVAC - Applicant proposed interior alteration on the Donnelly Wing B1

    Applied Jun 17, 2016 · issued Sep 23, 2016 · Permit 16 176293 HVA

    Permit issued
  • Addition or alteration · Interior alterations

    Applicant proposed interior alteration on the Donnelly Wing B1

    Applied Jun 17, 2016 · issued Sep 1, 2016 · Permit 16 176293 BLD

    Permit issued
  • Addition or alteration · Interior alterations

    Applicant proposed interior alteration on the 2nd floor of the existing building

    Applied Jun 17, 2016 · issued Apr 24, 2025 · Permit 16 176334 BLD

    Permit issued
  • Fire and security upgrade · Electromagnetic locks

    Proposal to install 1 maglock on the 2nd floor.

    Applied Jun 17, 2016 · Permit 16 176270 FSU

    Application acceptable
  • Plumbing

    Plumbing - Applicant proposed interior alteration on the Donnelly Wing B1

    Applied Jun 17, 2016 · issued Sep 23, 2016 · Permit 16 176293 PLB

    Permit issued
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to on 5th floor - Donnelly Wing Central and North Peri Operative. areas in existing hospital.

    Applied Jun 16, 2016 · issued Jul 28, 2016 · Permit 16 175348 BLD

    Inspections under way
  • Fire and security upgrade · Electromagnetic locks

    Proposal to install 4 maglocks on the 5th floor.

    Applied Jun 16, 2016 · issued Jul 20, 2016 · completed Jun 11, 2026 · Permit 16 175350 FSU

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to on 5th floor - Donnelly Wing Central and North Peri Operative. areas in existing hospital.

    Applied Jun 16, 2016 · issued Jul 28, 2016 · Permit 16 175348 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal for interior alterations to on 5th floor - Donnelly Wing Central and North Peri Operative. areas in existing hospital.

    Applied Jun 16, 2016 · issued Jul 28, 2016 · Permit 16 175348 PLB

    Inspections under way
  • Heating and ventilation

    Revision # 02 - for fit up of the 7th floor of the Donnelly Wing South including minor renovations on Level 7 Bond Wing West.HVAC Revision to interior layout from floors 6 - 11.

    Applied May 3, 2016 · issued Jun 22, 2016 · Permit 15 117112 HVA (revision 02)

    Revision issued
  • Addition or alteration · Interior alterations

    Revision # 02 - for fit up of the 7th floor of the Donnelly Wing South including minor renovations on Level 7 Bond Wing West.Revision to interior layout from floors 6 - 11. This revision also includes revised sprinkler plans.

    Applied May 3, 2016 · issued Jun 27, 2016 · completed Jul 30, 2026 · Permit 15 117112 BLD (revision 02)

    Closed
  • Plumbing

    Revision # 02 - for fit up of the 7th floor of the Donnelly Wing South including minor renovations on Level 7 Bond Wing West.Plumbing Revision to interior layout from floors 6 - 11.

    Applied May 3, 2016 · issued Jun 22, 2016 · Permit 15 117112 PLB (revision 02)

    Revision issued
  • Fire and security upgrade · Electromagnetic locks

    Revision # 02 - For 2 additional mag locks on the 7ths floor of the existing hospital.REV01- Mag lock revisions.

    Applied May 3, 2016 · issued Jun 8, 2016 · completed Jun 4, 2026 · Permit 15 117144 FSU (revision 02)

    Closed
  • Addition or alteration · Interior alterations

    Interior alteration on level 1 Shuter Wing east to facilitate temporary fit - up for the accommodation of medical equipments and storage MDRD operations.

    Applied Apr 20, 2016 · issued Jun 21, 2016 · completed Mar 29, 2017 · Permit 16 143485 BLD

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to area of CCW floors 4, 7, 8, 9, 14 abutting the Patient Care Tower (PCT)

    Applied Apr 1, 2016 · issued Jun 2, 2016 · completed Aug 28, 2026 · Permit 16 134765 BLD

    Closed
  • Plumbing

    REVISION :01 interior alterations to the 4th floor of the Cardinal Carter Wing, St. Michael's Hospital. Scope of work involves demolition of interior partition walls and ceilings, and redesign and reinstallation of the interior layoutPlumbing - Proposal for interior alterations to area of CCW floors 4, 7, 8, 9, 14 abutting the Patient Care Tower (PCT)

    Applied Apr 1, 2016 · issued Jun 2, 2016 · Permit 16 134765 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for interior alterations to area of CCW floors 4, 7, 8, 9, 14 abutting the Patient Care Tower (PCT)

    Applied Apr 1, 2016 · issued Jun 2, 2016 · Permit 16 134765 HVA

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for interior alterations to Level 5, Bond Wing in existing hospital - "St Michael's Hospital"

    Applied Mar 7, 2016 · issued Apr 19, 2016 · completed Jun 27, 2017 · Permit 16 124274 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to Level 5, Bond Wing in existing hospital - "St Michael's Hospital"

    Applied Mar 7, 2016 · issued Apr 12, 2016 · completed Jul 7, 2017 · Permit 16 124274 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to Level 5, Bond Wing in existing hospital - "St Michael's Hospital"

    Applied Mar 7, 2016 · issued Apr 12, 2016 · completed Jul 5, 2017 · Permit 16 124274 BLD

    Closed
  • Heating and ventilation

    see attachment for list fo revisions

    Applied Feb 26, 2016 · issued Apr 7, 2016 · Permit 14 266878 HVA (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    see attachment for list of revisions.

    Applied Feb 26, 2016 · issued Apr 4, 2016 · Permit 14 266878 BLD (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    REV - 01 Interior alteration to the health and records centre for future tenant fit up on level 1 of the Donnelly Wing. Removal and upgrades to the building envelope and re cladding on the walls facing Queen Street.

    Applied Jan 15, 2016 · issued Feb 11, 2016 · completed Sep 1, 2023 · Permit 15 171941 BLD (revision 01)

    Closed
  • Plumbing

    REV - 01 Interior alteration to the health and records centre for future tenant fit up on level 1 of the Donnelly Wing. Removal and upgrades to the building envelope and re cladding on the walls facing Queen Street.

    Applied Jan 15, 2016 · issued Feb 12, 2016 · Permit 15 171941 PLB (revision 01)

    Application acceptable
  • Heating and ventilation

    HVAC REV - 01 Interior alteration to the health and records centre for future tenant fit up on level 1 of the Donnelly Wing. Removal and upgrades to the building envelope and re cladding on the walls facing Queen Street.

    Applied Jan 15, 2016 · issued Feb 18, 2016 · Permit 15 171941 HVA (revision 01)

    Revision issued
  • Fire and security upgrade · Electromagnetic locks

    Electromagnetic Locks for Hospital. Applicant proposed interior alteration to the ground floor of the Cardinal Carter Wing converting it to a Emergency Dept space. interior renovation to level B1.

    Applied Dec 1, 2015 · issued Jan 25, 2016 · completed Jun 5, 2026 · Permit 15 259215 FSU

    Closed
  • Addition or alteration · Interior alterations

    Interior alterations to the ground floor (LEVEL 1) and basement (B1) of existing Hospital (Cardinal Carter Wing) converting area to an Emergency Dept space. Removal of existing exterior ramp and addition along the west lot line in conjunction with interior alterations.

    Applied Dec 1, 2015 · issued Mar 18, 2016 · completed Aug 11, 2026 · Permit 15 259181 BLD

    Closed
  • Plumbing

    Plumbing - Applicant proposed interior alteration to the ground floor of the Cardinal Carter Wing converting it to a Emergency Dept space. interior renovation to level B1.

    Applied Dec 1, 2015 · issued Mar 18, 2016 · Permit 15 259181 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Applicant proposed interior alteration to the ground floor of the Cardinal Carter Wing converting it to a Emergency Dept space. interior renovation to level B1.

    Applied Dec 1, 2015 · issued Mar 18, 2016 · Permit 15 259181 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Revision to interior layout from floors 6 - 11. This revision also includes revised sprinkler plans.

    Applied Nov 12, 2015 · issued Dec 18, 2015 · completed Jul 30, 2026 · Permit 15 117112 BLD (revision 01)

    Closed
  • Fire and security upgrade · Electromagnetic locks

    REV01- Maglock revisions.

    Applied Nov 12, 2015 · issued Dec 17, 2015 · completed Jun 4, 2026 · Permit 15 117144 FSU (revision 01)

    Closed
  • Heating and ventilation

    HVAC Revision to interior layout from floors 6 - 11.

    Applied Nov 12, 2015 · issued Dec 15, 2015 · Permit 15 117112 HVA (revision 01)

    Revision issued
  • Plumbing

    Plumbing Revision to interior layout from floors 6 - 11.

    Applied Nov 12, 2015 · issued Dec 15, 2015 · Permit 15 117112 PLB (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to accompany already issued permit #15 193514 FSU 00 FS (as per inspector's request). There is no change to life safety, fire rating or exiting requirements. The area is not being renovated beyond this scope of installation/replacement of NEW FIRE SENSORS (and panel) and FIRE STOP in penetrations throughout the existing hospital.

    Applied Nov 9, 2015 · issued Dec 15, 2015 · Permit 15 249219 BLD

    Inspections under way
  • Addition or alteration · Other

    Proposal for BLD permit to accompany 5 228658 FSU 00 FS (as per inspector's request). There is no change to life safety, fire rating or exiting requirements. The area is not being renovated beyond this scope of installation of new sprinklers to a previousely un-sprinklered space. BOND WING ONLY

    Applied Nov 4, 2015 · issued Dec 9, 2015 · Permit 15 246867 BLD

    Permit issued
  • Addition or alteration · Interior alterations

    Proposal for interior alterations for fire stops and slab penetration related to permit 15-130301 PSA - St Michael's Hospital

    Applied Oct 21, 2015 · issued Oct 26, 2015 · Permit 15 240684 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal to construct a 17 storey tower addition to St Michael's Hospital (corner of Queen St and Victoria St)

    Applied Sep 25, 2015 · issued Jan 20, 2016 · completed May 18, 2022 · Permit 15 113674 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct a 17 storey tower addition to St Michael's Hospital (corner of Queen St and Victoria St)

    Applied Sep 25, 2015 · issued Jan 20, 2016 · completed May 16, 2022 · Permit 15 113674 HVA

    Closed
  • Fire and security upgrade · Sprinklers

    Proposal to install sprinklers on floors 1,3,4 and 8 of an existing hospital - Bond Wing, St Michaels Hospital

    Applied Sep 25, 2015 · issued Oct 23, 2015 · Permit 15 228658 FSU

    Permit issued
  • Plumbing

    Plumbing - Proposal for interior alterations on B1 the main floor, Level 1 and Level 2 as well as the enclosure of the front lobby. - St Michael's Hospital

    Applied Aug 6, 2015 · issued Nov 25, 2015 · Permit 15 202732 PLB

    Permit issued
  • Addition or alteration · Multiple projects

    Proposal for interior alterations and addition on B1 the main floor, Level 1 and Level 2 to infill an existing courtyard - St Michael's Hospital

    Applied Aug 6, 2015 · issued Apr 25, 2016 · Permit 15 202732 BLD

    Permit issued
  • Heating and ventilation

    HVAC -Proposal for interior alterations on B1 the main floor, Level 1 and Level 2 as well as the enclosure of the front lobby. - St Michael's Hospital

    Applied Aug 6, 2015 · issued Nov 25, 2015 · Permit 15 202732 HVA

    Permit issued
  • Fire and security upgrade · Fire alarm

    Proposal to replace fire alarm panel and sensors throughout existing hospital - "St Michaels Hospital'

    Applied Jul 20, 2015 · issued Aug 17, 2015 · Permit 15 193514 FSU

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to the Records Room of an existing hospital - Level 1, Donnelly Wing, St Michaels Hospital

    Applied Jun 10, 2015 · issued Jul 15, 2015 · completed Sep 1, 2023 · Permit 15 171941 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to the Records Room of an existing hospital - Level 1, Donnelly Wing, St Michaels Hospital

    Applied Jun 10, 2015 · issued Jul 15, 2015 · Permit 15 171941 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal for interior alterations to the Records Room of an existing hospital - Level 1, Donnelly Wing, St Michaels Hospital

    Applied Jun 10, 2015 · issued Jul 15, 2015 · Permit 15 171941 PLB

    Inspections under way
  • Drains and site services

    Drain - Proposal to construct a 17 storey tower addition to St Michael's Hospital (corner of Queen St and Victoria St)

    Applied Apr 2, 2015 · issued Jun 5, 2015 · completed May 15, 2022 · Permit 15 113674 DRN

    Closed
  • Plumbing · Other

    Proposal to replace the existing plumbing stack risers on floors B2 through 10 - Donnelly Wing, St Michael's Hospital. No change to plumbing fixtures.

    Applied Mar 20, 2015 · issued Mar 24, 2015 · Permit 15 130301 PSA

    Inspections under way
  • Addition or alteration · Underpinning

    Proposal to underpin the north and east wall (Cardinal Carter and Donnelly Wing) in existing hospital - "St Michaels Hospital"

    Applied Feb 24, 2015 · issued Apr 20, 2015 · completed Aug 28, 2026 · Permit 15 120725 BLD

    Closed
  • Plumbing

    Plumbing - Proposal for interior fit-up on 6th, 7th, 8th, 9th and 10th floors to accomodate the relocated programs within Donnelly Wing: Regional Anesthesia, Opthamology and Ambulatroy Clinics.

    Applied Feb 17, 2015 · issued Jun 4, 2015 · Permit 15 117112 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for interior fit-up on 6th, 7th, 8th, 9th and 10th floors to accomodate the relocated programs within Donnelly Wing: Regional Anesthesia, Opthamology and Ambulatroy Clinics.

    Applied Feb 17, 2015 · issued Jun 4, 2015 · Permit 15 117112 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for interior fit-up on 6th, 7th, 8th, 9th and 10th floors to accomodate the relocated programs within Donnelly Wing: Regional Anesthesia, Opthamology and Ambulatroy Clinics.

    Applied Feb 12, 2015 · issued Jun 4, 2015 · completed Jul 30, 2026 · Permit 15 117112 BLD

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Proposal to add 12 maglocks 6th, 7th, 8th, 9th and 10th floors, in existing hospital.

    Applied Feb 12, 2015 · issued Mar 9, 2015 · completed Jun 4, 2026 · Permit 15 117144 FSU

    Closed
  • Addition or alteration · Multiple projects

    Proposal to construct a 17 storey tower addition to St Michael's Hospital (corner of Queen St and Victoria St)

    Applied Feb 9, 2015 · issued Jul 7, 2016 · completed Aug 1, 2024 · Permit 15 113674 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal to relocate CACF room located on level B1 in existing "St Michael's" hospital.

    Applied Dec 22, 2014 · issued Mar 3, 2015 · Permit 14 266878 HVA

    Permit issued
  • Addition or alteration · Interior alterations

    Proposal to relocate CACF room located on level B1 in existing "St Michael's" hospital.

    Applied Dec 22, 2014 · issued Mar 3, 2015 · Permit 14 266878 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for interior alterations to Level 3 Shuter Wing (MS Clinic) of existing hospital - "St Michaels Hospital"

    Applied Aug 13, 2013 · issued Sep 12, 2013 · Permit 13 219540 PLB

    Permit issued
  • Fire and security upgrade · Electromagnetic locks

    Proposal to install 1 maglock on Level 3 Shuter Wing (MS Clinic) of existing hospital - "St Michaels Hospital"

    Applied Aug 13, 2013 · issued Aug 21, 2013 · Permit 13 219554 FSU

    Permit issued
  • Heating and ventilation

    HVAC - Proposal for interior alterations to Level 3 Shuter Wing (MS Clinic) of existing hospital - "St Michaels Hospital"

    Applied Aug 13, 2013 · issued Sep 12, 2013 · Permit 13 219540 HVA

    Permit issued
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to Level 3 Shuter Wing (MS Clinic) of existing hospital - "St Michaels Hospital"

    Applied Aug 13, 2013 · issued Sep 12, 2013 · Permit 13 219540 BLD

    Permit issued
  • Fire and security upgrade · Sprinklers

    Proposal for partial 5th floor sprinkler modification (in 5 Shuter Wing)

    Applied Nov 28, 2012 · issued Nov 30, 2012 · Permit 12 285792 FSU

    Permit issued
  • Fire and security upgrade · Electromagnetic locks

    Proposal to install 2 maglocks on the 17th floor

    Applied Nov 1, 2012 · issued Nov 6, 2012 · completed Jun 9, 2025 · Permit 12 272118 FSU

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Revision: Proposal to install one addition expansion tank.Proposal to install nine back flow preventors to hospital. St. Michael's Hospital.

    Applied May 17, 2011 · issued May 30, 2011 · Permit 11 106306 PSA (revision 01)

    Revision issued
  • Plumbing · Other

    Proposal to relocate two sinks in Second Cup restaurant. Restaurant located in ST. MICHAEL'S HOSPITAL.

    Applied Mar 23, 2011 · issued Apr 1, 2011 · Permit 11 152399 PSA

    Permit issued
  • Fire and security upgrade · Sprinklers

    Sprinkler permit for new sprinkler permit for 5th floor on 5 Shuter / 50 Bond for St Michaels Hospital.Sprinkler permit associated with Mechanical permit 10 321029 MSA

    Applied Mar 11, 2011 · issued Mar 18, 2011 · Permit 11 142749 FSU

    Inspections under way
  • Addition or alteration · Interior alterations

    This is for interior alterations to the basement level of "ST. MICHAEL'S HOSPITAL". This is for new rooms including an MRI room. This proposal includes HVAC and Plumbing.

    Applied Feb 16, 2011 · issued Feb 25, 2011 · completed Aug 11, 2025 · Permit 11 127376 BLD

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install nine back flow preventors to hospital. St. Michael's Hospital.

    Applied Jan 13, 2011 · issued Mar 10, 2011 · Permit 11 106306 PSA

    Inspections under way
  • Heating and ventilation

    HVAC - Permit for interior alterations to existing hospital building - Floor 7 - (Cardinal Carter) - Room 7-0018 - Existing CATH LAB

    Applied Nov 26, 2010 · issued Dec 8, 2010 · completed Sep 15, 2025 · Permit 10 303908 HVA

    Closed
  • Addition or alteration · Interior alterations

    Permit for interior alterations to existing hospital building - Floor 7 - (Cardinal Carter) - Room 7-0018 - Existing CATH LAB

    Applied Nov 26, 2010 · issued Dec 8, 2010 · completed Jun 9, 2025 · Permit 10 303908 BLD

    Closed
  • Addition or alteration · Interior alterations

    Proposal to construct new opening in existing wall for new bridge to connect 30 Bond St and 209 Victoria St (See BLD 09 190866 for bridge permit at 209 Victoria St).

    Applied Apr 23, 2010 · issued Apr 30, 2010 · completed Aug 24, 2026 · Permit 10 162728 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to relocate existing duct work.

    Applied Dec 22, 2009 · issued Jan 8, 2010 · Permit 09 199186 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to relocate existing duct work.

    Applied Dec 22, 2009 · issued Dec 30, 2009 · completed Jun 8, 2026 · Permit 09 199186 BLD

    Closed (dormant)
  • Heating and ventilation

    HVAC - Proposal for interior alterations to enlargen existing 5th floor examination room (Endo Vascular room).St. Michael's Hospital.

    Applied Jun 9, 2009 · issued Jun 18, 2009 · Permit 09 147313 HVA

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to construct a new mech penthouse on the roof level of F-Wing (St. Michaels Hospital) to accomodate 2 new generators which will replace old units in Queen Wing Basement.

    Applied May 28, 2009 · issued Aug 10, 2009 · Permit 09 143052 HVA

    Inspections under way
  • Addition or alteration · Other

    Proposal to construct a new mech penthouse on the roof level of F-Wing (St. Michaels Hospital) to accomodate 2 new generators which will replace old units in Queen Wing Basement.

    Applied May 28, 2009 · issued Aug 10, 2009 · Permit 09 143052 BLD

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior alterations to expand existing GF Queen Street lobby ( remove existing Storage Room), new exterior glazing. St. Michaels Hospital

    Applied Sep 16, 2008 · issued Sep 19, 2008 · Permit 08 203940 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Interior alterations to existing hospital on the 2nd floor (medical day care, oncology, and cancer clinic). "2 Queen Wing Central"

    Applied Aug 19, 2008 · issued Aug 27, 2008 · Permit 08 195166 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior alterations to existing hospital on the 2nd floor (medical day care, oncology, and cancer clinic). "2 Queen Wing Central"

    Applied Aug 19, 2008 · issued Aug 27, 2008 · Permit 08 195166 BLD

    Inspections under way
  • Fire and security upgrade · Sprinklers

    Sprinkler permit for ADDRESS 30 BOND STREET / 2 QUEEN STREET SOUTH WINGinterior alterations to existing office space - physicians office. Floor 2. Medical Daycare

    Applied Apr 14, 2008 · issued May 23, 2008 · completed Jun 8, 2026 · Permit 08 147028 FSU

    Closed (dormant)
  • Addition or alteration · Interior alterations

    ADDRESS 30 BOND STREET / 2 QUEEN STREET SOUTH WINGinterior alterations to existing office space - physicians office. Floor 2. Medical Daycare

    Applied Apr 14, 2008 · issued Apr 21, 2008 · completed Sep 16, 2026 · Permit 08 146991 BLD

    Closed
  • Addition or alteration · Other

    Revised for new storage tank location and civil room - St. Michaels Hospital. New Diesel storage room in BSMT and new opening to exterior on 11th floor.

    Applied Jun 29, 2007 · issued Aug 20, 2007 · Permit 06 132532 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    HVAC - Make interior alterations to 7th floor equipment room(s).

    Applied May 25, 2007 · issued May 29, 2007 · completed Jun 8, 2026 · Permit 07 219462 HVA

    Closed (dormant)
  • Plumbing

    Plumbing - Make interior alterations to 7th floor equipment room(s).

    Applied May 18, 2007 · issued May 28, 2007 · completed Jun 8, 2026 · Permit 07 219462 PLB

    Closed (dormant)
  • Addition or alteration · Interior alterations

    Make interior alterations to 3rd floor for CT equipment; Cardinal Carter Wing South, St Michael's Hospital.

    Applied May 18, 2007 · issued May 28, 2007 · completed Sep 12, 2025 · Permit 07 219453 BLD

    Closed
  • Addition or alteration · Interior alterations

    Make interior alterations to 7th floor equipment room(s).

    Applied May 18, 2007 · issued May 28, 2007 · Permit 07 219462 BLD

    Inspections under way
  • Heating and ventilation · Alter: Boiler/Furnace/AC replacement

    Proposal to add 1 a/c unit in computer room. Queen Building - F Building (basement).

    Applied May 1, 2007 · issued May 7, 2007 · completed Jun 8, 2026 · Permit 07 185538 MSA

    Closed (dormant)
  • Heating and ventilation

    HVAC - Proposal to construct interior alterations to 3rd fl (Queen wing) for MRI Clinic.

    Applied Dec 20, 2006 · issued Dec 28, 2006 · Permit 06 149332 HVA

    Inspections under way
  • Heating and ventilation

    HVAC - St. Michaels Hospital. New Diesel storage room in BSMT and new opening to exterior on 11th floor.Examiner to verify fee.

    Applied Jun 21, 2006 · issued Sep 5, 2006 · Permit 06 132532 HVA

    Inspections under way
  • Addition or alteration · Other

    St. Michaels Hospital. New Diesel storage room in BSMT and new opening to exterior on 11th floor.Examiner to verify fee. -- Additional permit fee of $373.44 to be paid prior to permit issuance

    Applied May 8, 2006 · issued Sep 5, 2006 · Permit 06 132532 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to replace 2 new Air Handling Units and temp. remove a portion of an exterior wall for access. - Other(BA)

    Applied Apr 10, 2006 · issued Apr 20, 2006 · Permit 06 124635 HVA

    Inspections under way
  • Addition or alteration · Other

    Proposal to replace 2 new Air Handling Units and temp. remove a portion of an exterior wall for access.

    Applied Apr 10, 2006 · issued Apr 12, 2006 · completed Jun 8, 2026 · Permit 06 124635 BLD

    Closed (dormant)
  • Heating and ventilation

    HVAC - Interior alterations to existing heamodialysis (8cc) and neurotrama ICU (9cc) areas. - Interior Alterations

    Applied Dec 20, 2005 · issued Mar 24, 2006 · Permit 05 108561 HVA

    Inspections under way
  • Heating and ventilation

    HVAC - Install partitions on portion of the 7th floor (Queen Central Wing & North Wing) for Heart Health Centre. - Interior Alterations

    Applied Dec 8, 2005 · issued Dec 14, 2005 · Permit 05 170206 HVA

    Inspections under way
  • Heating and ventilation

    HVAC - Interior alterations to create a new Tim Horton's kiosk on main floor. (St. Michaels Hospital) - Interior Alterations

    Applied Sep 13, 2005 · issued Sep 16, 2005 · Permit 05 179771 HVA

    Permit issued
  • Heating and ventilation

    HVAC - Interior alterations to existing 3rd floor to create CT scanner rooms. 2 new kitchen sinks on 3rd floor. Cardianl Carter North Wing - Interior Alterations

    Applied Jul 19, 2005 · issued Aug 2, 2005 · completed Sep 16, 2026 · Permit 05 161295 HVA

    Closed
  • Addition or alteration · Interior alterations

    Renovation 7CC floor- to observation room

    Applied May 2, 2005 · issued May 24, 2005 · Permit 05 128326 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Make interior alterations for proposed fracture clinic (level B1) - Interior Alterations

    Applied May 14, 2004 · issued May 18, 2004 · Permit 04 102905 HVA

    Inspections under way
  • Heating and ventilation

    HVAC - make interior alterations to existing Digital Imaging Area on level 2-B. - Interior Alterations

    Applied Dec 23, 2003 · issued Jan 22, 2004 · completed Jun 8, 2026 · Permit 03 201580 HVA

    Closed (dormant)
  • Heating and ventilation

    HVAC - make interior alters to 1st floor for new crisise stabilization unit in existing hospital (St.Mike's) HISTORICAL - Interior Alterations

    Applied Jan 7, 2003 · completed May 13, 2019 · Permit 02 197101 HVA

    Cancelled
  • Heating and ventilation

    HVAC - install radiant panels along windows , associated piping, install roof top unit for cooling and heat exchanger. Cost included in BP02-127553(990) HISTORICAL -

    Applied Jul 24, 2002 · issued Aug 7, 2002 · completed Jun 8, 2026 · Permit 02 127553 HVA

    Closed (dormant)
  • Heating and ventilation

    h.v.a.c. alter h.v.a.c. system on 5th floor. (ambulatory surgery) cost included in building permit 01-168824

    Applied Apr 19, 2002 · issued May 29, 2002 · completed Jun 8, 2026 · Permit 02 128494 HVA

    Closed (dormant)
  • Heating and ventilation · Install/Alter HVAC - only

    alter existing hvac and related ductwork 5th floorcost included in bp 00-351243

    Applied Feb 1, 2001 · issued Feb 21, 2001 · Permit 01 107208 HVA

    Inspections under way
  • Heating and ventilation · Install/Alter HVAC - only

    alter existing h.v.a.c. system and install separate h.v.a.c. system on portion of the 3rd floor. (Medical Imaging Dept. - Victoria Wing) cost incl. 00 - 361648

    Applied Dec 13, 2000 · issued Jan 12, 2001 · Permit 00 361684 HVA

    Permit issued
  • Heating and ventilation · Install/Alter HVAC - only

    alter h.v.a.c. system on 2nd floor.see bp#00-330890

    Applied Oct 25, 2000 · issued Nov 22, 2000 · completed Jun 8, 2026 · Permit 00 348975 HVA

    Closed (dormant)
  • Heating and ventilation · Install/Alter HVAC - only

    Alater existing h.v.a.c. system on portion of the 2nd floor (research labs) "Bond Wing"

    Applied Jun 27, 2000 · issued Oct 2, 2000 · completed Jun 8, 2026 · Permit 00 166076 HVA

    Closed (dormant)
  • Heating and ventilation · Install/Alter HVAC - only

    Supply and install h.v.a.c. System for 8th floor.see bp# 284467

    Applied May 11, 2000 · issued May 29, 2000 · Permit 00 150214 HVA

    Inspections under way
  • Non-residential building permit · Addition to existing building

    supply shop drawings for sprinkler system.see bp# 428799

    Applied Feb 11, 2000 · Permit 00 127253 CMB

    Pending cancellation
  • Heating and ventilation · Install/Alter HVAC - only

    supply and install h.v.a.c. system and all relative ductwork.see bp# 428799 for plans.

    Applied Feb 11, 2000 · issued Feb 15, 2000 · Permit 00 127255 HVA

    Inspections under way
  • Heating and ventilation · Unknown

    Alter existing h.av.a.c. System. See bp# 420409

    Applied Apr 7, 1999 · issued Apr 21, 1999 · completed Jun 8, 2026 · Permit 99 015017 HVA

    Closed (dormant)

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To alter the existing public hospital (St. Michael's Hospital, bounded by Shuter Street, Bond Street, Queen Street East, and Victoria Street) by installing an air handling unit (AHU) on a portion of the roof (Donnelly Wing).

    Decision: Approved (hearing Jan 21, 2026)

    Filed Nov 14, 2025 · File A0841/25TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 247 Yonge St · Minor variance

    To permit a place of amusement (arcade) use on this subject lot.

    240 m away · filed Aug 9, 2024 · Approved

  • 88 Queen St E · Consent

    To obtain consent to a strata severance and to create various easements/rights-of-ways within a 52-storey mixed-use redevelopment currently under construction.

    230 m away · filed Jan 26, 2024 · Approved

  • 30 Mutual St · Consent

    To obtain consent to sever portions of land (a below grade strata) for the purpose of lot additions and to create various easements/rights-of-way. This application will allow for the readjustment of the lot boundaries and easements/rights-of-way (below grade) between this property and the adjacent property to the south (municipally known as 88 Queen Street East), which were originally created from one parcel and were severed under Decision Number B0015/19TEY.

    240 m away · filed Dec 11, 2023 · Approved

  • 88 Queen St E · Consent

    To obtain consent to sever portions of land (a below grade strata) for the purpose of lot additions and to create various easements/rights-of-way. This application will allow for the readjustment of the lot boundaries and easements/rights-of-way (below grade) between this property and the adjacent property to the north (municipally known as 30 Mutual Street & 25 Dalhousie Street), which were originally created from one parcel and were severed under Decision Number B0015/19TEY.

    230 m away · filed Oct 16, 2023 · Approved

  • 88 Queen St E · Minor variance

    To permit the increase of residential dwelling units by constructing an additional floor above the current maximum permitted building height of the 51-storey mixed-use building, currently under construction. There will be a total of 587 dwelling units provided.

    230 m away · filed Apr 17, 2023 · Approved

  • 88 Queen St E · Minor variance

    To alter the redevelopment plan for a 52-storey mixed-use building, approved under Site Specific By-law 1293-2018 and 1294-2018.

    230 m away · filed Aug 22, 2022 · Approved

  • 20 Lombard St · Minor variance

    To alter the redevelopment plan for a 46-storey mixed-use building, previously approved under Site-Specific By-laws 132-2016 (OMB) and 133-2016 (OMB), by creating additional dwelling units, converting residential parking spaces to commercial parking spaces and converting a bicycle parking area to a bulk parcel storage room.

    220 m away · filed Sep 21, 2020 · Approved

  • 25 Richmond St E · Minor variance

    To alter the redevelopment plan for the 46 storey mixed-use building approved under Site-Specific By-Laws 132-2016 and 133-2016, by relocating amenity space from floor 45 to floor 46, constructing two additional dwelling units on floor 45 (total 693 Dwelling Units), and increasing the gross floor area accordingly. Additionally, this application seeks to maintain the existing fifth storey addition and elevator overrun located atop the southeastern heritage building.

    200 m away · filed Oct 3, 2019 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.